Skip to main content
Skip to content
Case File
efta-efta01782677DOJ Data Set 10Correspondence

EFTA Document EFTA01782677

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01782677
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Cecile de Jongh < Sent: Tuesday, September 1, 2015 7:46 PM To: JEE; Rich Kahn Subject: Work in the Office Attachments: IMG_3870.1PG; Untitled attachment 00584.txt; IMG_3867JPG; Untitled attachment 00587.txt; IMG_3866JPG; Untitled attachment 00590.txt The dry wall and ceiling have been installed in our offices. Tomorrow they w=ll sand in preparation for painting. The estimate did not include painting=and I asked the contractor to give us a quote to paint both offices. The new AC unit which sits above the kitchen (see first picture) is larger t=an the last one and therefore sits 2" lower. Because of this, we have to p=t in a new, lower ceiling in the kitchen which will not line up with the ce=ling in the hallway. An arch had to be added to square off the kitchen so t=at the lower ceiling tiles can be installed. This was not part of the quot= either so I'm getting an estimate for that as well. 1 EFTA_R1_00102645 EFTA01782677

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.