Skip to main content
Skip to content
Case File
efta-efta01784012DOJ Data Set 10Correspondence

EFTA Document EFTA01784012

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01784012
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Sent: Wednesday, August 24, 2016 10:37 AM To: Je vacation Subject: Fwd: BBJ A6-DFR Engine question supposedly answered?&n=sp; Sent from my iPad Begin forwarded message: Claire Brugirar. Date: August 24, 2016 at 1=37:04 AM AST To: Larry Visoski Subject: RE: BBJ A6-DFR Dear Larry, With regards to the differe=ce in engine time; there was an engine swap done as part of a stagger progr=m Hope this clarifies and loo= forward to hearing from you on the way forward. Best Regards =/b> Claire Brugirard Sales Manager PO Box 60666, Abu Dhabi, Un=ted Arab Emirates EFTA_R1_00104975 EFTA01784012 Direct: Mobile: sales@royalje=group.com <mailto:sales@roy=ljetgroup.com> I www.royaljetgroup.com <http://www.royaljetgroup.com/=> From: Larry Vis=ski Sent: Tuesday, August 23, 2016 8:07 PM To: Claire Brugirard Subject: Re: BBJ A6-DFR Hello Claire Yes, I represent Mr. Epstein The purchase company would be Thomas World Airways I'll sign NDA and fwd post haste Thank you for questions answered„ I'm unclear on total engine time„ Your engineering department stated, Airframe and engines are on same cycle, Your spec sheet stated 4800 and 11,000 hours total ti=e on engines ? Could you clarify? Thank you Larry Sent from my iPhone 2 EFTA_R1_00104976 EFTA01784013 On Au 23 2016 at 6:28 AM, Claire Brugirard > wrote:=/p> Dear Larry, Whilst I gather the info you requested an= possibly some pictures from our Engineer; &=bsp; Can you kindly confirm your f=lt contact details including telephone nr and address, company?=/o:p> &=bsp; Are you representing Mr Jeffr=y Epstein? &=bsp; Would you be willing to sign a=short NDA Letter Agreement as attached which is in both parties' in=erest? The aircraft just came out of A check whi=h was done in Abu Dhabi and during which the Airworthiness Review was also d=ne Look forward to hearing from you on the a=ove. Many thanks Best Regards [email protected] I www.royaljetgroup.com <http://www.royaljetgroup.com/> From: Larry Vis=ski Sent: Sunday, August 21, 2016 5:54 PM To: Claire Brugirard Subject: Re: BBJ A6-DFR 3 EFTA_R1_00104977 EFTA01784014 Claire, Can you also send current photos of interior? Wood work detail, general condition. I'd also like photos of the nose and main gear w=eels and Brakes, also photos of the wheel Well area„ Close up shots, nothing fancy, I'm looking at general=condition of these areas. Even A current video of exterior close up and Interior taken with an 'Phone would be helpful, please. Thanks in advance, Larry Sent from my iPhone n A at 9:16 AM, Claire Brugirard wrote:=/p> Dear Larry=o:p> OK, will get back=to you asap Need some input f=E2$4rom our engineer though Best Regards, Claire Brugirard From: Larry Visoski Sent: Sunday, August 21, 2016 17:00 To: Claire Brugirard Subject: Re: BBJ A6-DFR 4 EFTA_R1_00104978 EFTA01784015 Hi Claire, jeevacation is my principal, he has now left the nego=iation and detail to me. Please send all responses to my questi=ns. thank you, Larry Sent from my iPhone On Aug 21, 2016, at 8:42 AM, Claire Brugirard > wrote:=/p> Dear Larry=o:p> Are you the same p=rson that has sent me emails earlier but from another email ID?=/o:p> Best Regards, Claire Brugirard From: Larry Visoski Sent: Sunday, August 21, 2016 16:34 To: Claire Brugirard Subject: BID A6-DFR Claire, Thank you for clarifying your Controller ADD. Could you answer the following questions: 5 EFTA_R1_00104979 EFTA01784016 1-Is A6-DFR on MSG-3 Maintenance program? 2-What maintenance facility does the Heavy inspections? (Such as Last C Chec=). 3-When was the Last shop visit / Engine inspection completed on Both Engines= 4-When is the Next scheduled Engine Shop visit? 5-Could you provide "Read Only" access to the Computerized maintenance progr=m for me? I'm mainly interested in HPC Disc cycle life remaining. 6-Do you have a Maintenance Budget for the 1C inspection Due in 2017? 7- the 4A inspection was due August 08, 2016 where was that inspection compl=ted? Would it be possible to review that invoice? 8-Are the engines "On Condition" or Hard time overhaul? Best Regards, Larry Visoski Sent from my iPad <NDA J.E.DOC> 6 EFTA_R1_00104980 EFTA01784017

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.