Skip to main content
Skip to content
Case File
efta-efta01788373DOJ Data Set 10Correspondence

EFTA Document EFTA01788373

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01788373
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: emad hann Sent: Monday, May 16, 2011 9:27 PM To: Gary Kemey Cc: Jeffrey Epstein Subject: Re: Gary, Other items that I have not seen you respond =o are (unless you responded to JE and did not include me on the e =ail) Ion =chedule Dock House More People Tile =ayer Nursery Floor Mooring Fire Fuel =esalination Mechanical done by 4/17 Thank =ou Emad Hanna Project Controller HBRK Associates 301 East 66th St Suite 10F New York NY 10065 Cell LSJ Office St. Thomas Office = NY Office Fax On May 16, 2011, at 2:38 PM, Gary Kerney wrote: schedule for the =th Main pool the building slab will =e poured and block going up the pool equipment =ill be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes =fter the building is stoned) EFTA_R1_00112782 EFTA01788373 still on target for 10/3 Flag pole pool the building will be framed in and plastering =nderway the pool equipment will be in and water in the pool =assumes we get tile selection) the deck will be concrete(tile happens after shelter =nd plaster) walls will be underway still on target for =/15 2 EFTA_R1_00112783 EFTA01788374

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.