Case File
efta-efta01790610DOJ Data Set 10CorrespondenceEFTA Document EFTA01790610
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01790610
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Sent:
Wednesday, March 2, 2011 9:22 PM
To:
[email protected]
Subject:
Gil update
Jeffrey,
Gulfstream is planning to work APU and boost pump on second shift tod=y at 3pm, Quality Control is researching and
hopes to approve the T-Stat install that I brought with on plane, the paper work that came with=the Tstat is 1970 build
date, three other Tstat's are listed=20 in parts data base system, but are not ready to ship since they are waiting bench
testing,. There is also a pressure test of pneumati= system for Tstat, Gulfstream is checking to see if this break out box=is
on hand in Long Beach,.
-Boost pump issue's will be addressed by Avionics tonight,. suspect=20 corrosion on canon plug in wheel well, and filter
down stream of pump,. ar= area's we are looking, in addition to Circuit Breaker integrality, 50amp,.
If you approve of below floor inspection in Long Beach, Gulfstream ca= start Thursday,.
I will keep you posted,
thanks,
Larry
1
EFTA_R1_00119243
EFTA01790610
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Email
[email protected]Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.