Case File
efta-efta01794448DOJ Data Set 10CorrespondenceEFTA Document EFTA01794448
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01794448
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
ion nicola <
>
Sent:
Sunday, January 9, 2011 12:50 AM
To:
Jeffrey Epstein
Subject:
RE:
hi jeffrey,
sorry for bothering with e-mails..
&nb=p; so we finished venetian plaster in master bedroom and the vestibule o=ly. now the vestibule needs the design in
top, but you are not sure yet =bout the sample. anyway i will finish that sample monday in the morning th=n you can
decide and i can start the design in the vestibule.
=eside this i have to do cabana no3 (close to the pool) with those vertical=lines.. and the bathroom with diamonds
(brown bags color), and then ther= are two small rooms in the master bedroom in the between vestibule and th= master
bathroom, they need white venetian plaster.
now, f=r the cabana no3, and the vestibule, i dont need help..if i keep my fr=end here i dont know what to give him to
do.. otherwise i would have asked=you for the begening that i need help. when i have to comp=se things like lets say
those small blue cross lines like the sample i do =or the vestibule in master bedroom, or even the verticals lines i have t=
do in cabana no3, or even the dimonds in its bathroom, i like to work=alone..otherwise i get distracted..i cannot
concentrate
=3B the only thing my friend can do is the venetian plaster in those small =ooms in the master bedroom, and that
would take one week for one person =o do them or 2-3 days if two persons work, but we cannot do the venetian=plaster
in there because they are not ready for us. when i left before chr=stmas garry told me they going to be ready at the
begining of january, t=ats why i sgheduled my friend for one or two weeks of work.
bu= then when we got here at the begening of this week and i i saw that those=two small rooms are not ready, i've i
asked garry when are they finish t=e floor and instaling the counter top and the sink, and he said is goin= to take one
week to finish the floor and sanding and then they ordered th= counter top and they will get it after after a week or
two..so he said th=y will be done in two weeks.
if i do venetian plaster before =hey finish instaling the counter top, basebords etc, and sending the floor, then they will
damage the walls. when you sand the floor it makes a brown-redish dust and gets stuck on the walls and you cannot
remove that..you have to redo all the walls.
anyway, after this talking to garry, i=had to tell my friend that there is only one week of work, so he will go=back
saturday or sunday. after that he sheduled a job in new york =or the next week, so now he has to be in new york
monday morning. he wor=s usually at the guggenheim museum as a freelancer, its his main job.
thank you,
&nbs=;
=38
ion
EFTA_R1_00128648
EFTA01794448
Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.