Skip to main content
Skip to content
Case File
efta-efta01794448DOJ Data Set 10Correspondence

EFTA Document EFTA01794448

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01794448
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: ion nicola < > Sent: Sunday, January 9, 2011 12:50 AM To: Jeffrey Epstein Subject: RE: hi jeffrey, sorry for bothering with e-mails.. &nb=p; so we finished venetian plaster in master bedroom and the vestibule o=ly. now the vestibule needs the design in top, but you are not sure yet =bout the sample. anyway i will finish that sample monday in the morning th=n you can decide and i can start the design in the vestibule. =eside this i have to do cabana no3 (close to the pool) with those vertical=lines.. and the bathroom with diamonds (brown bags color), and then ther= are two small rooms in the master bedroom in the between vestibule and th= master bathroom, they need white venetian plaster. now, f=r the cabana no3, and the vestibule, i dont need help..if i keep my fr=end here i dont know what to give him to do.. otherwise i would have asked=you for the begening that i need help. when i have to comp=se things like lets say those small blue cross lines like the sample i do =or the vestibule in master bedroom, or even the verticals lines i have t= do in cabana no3, or even the dimonds in its bathroom, i like to work=alone..otherwise i get distracted..i cannot concentrate =3B the only thing my friend can do is the venetian plaster in those small =ooms in the master bedroom, and that would take one week for one person =o do them or 2-3 days if two persons work, but we cannot do the venetian=plaster in there because they are not ready for us. when i left before chr=stmas garry told me they going to be ready at the begining of january, t=ats why i sgheduled my friend for one or two weeks of work. bu= then when we got here at the begening of this week and i i saw that those=two small rooms are not ready, i've i asked garry when are they finish t=e floor and instaling the counter top and the sink, and he said is goin= to take one week to finish the floor and sanding and then they ordered th= counter top and they will get it after after a week or two..so he said th=y will be done in two weeks. if i do venetian plaster before =hey finish instaling the counter top, basebords etc, and sending the floor, then they will damage the walls. when you sand the floor it makes a brown-redish dust and gets stuck on the walls and you cannot remove that..you have to redo all the walls. anyway, after this talking to garry, i=had to tell my friend that there is only one week of work, so he will go=back saturday or sunday. after that he sheduled a job in new york =or the next week, so now he has to be in new york monday morning. he wor=s usually at the guggenheim museum as a freelancer, its his main job. thank you, &nbs=; =38 ion EFTA_R1_00128648 EFTA01794448

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.