Skip to main content
Skip to content
Case File
efta-efta01799185DOJ Data Set 10Correspondence

EFTA Document EFTA01799185

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01799185
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Larry Visoski Sent: Tuesday, March 22, 2016 4:30 AM To: Je vacation Subject: G550 update Jeffrey Pete will have more detail comment by lunch time Tuesday, Appears the aircraft has time sensitive items due„ 0= bottles Hydrostatic inspection, </=iv> I'm only guessing, but my gutt tells me, a=rcraft is un-airworthy at this time. I would imagine this is the reason Kevin wants the pre-by inspection co=pleted at Chrysler Penistar in Pontiac Michigan, where the aircraft sits, In order to accomplish your test flight, Kevin should have aircraft ma=e airworthy, we know the 144 month inspection is due June 2016. I would im=gine a 144 month could be our prebuy, or is price based on simplified prebu=? to include test flight, borescope and records review? I would imagine Ch=ysler Penistar could provide quote to make the aircraft airworthy, for=your test flight, and also provide a quote for the 144 month inspection Even though Chrysler Penistar is not factor= Gulfstream, they are a very reputable repair shop, Notes from=Pete: Hi larry,&=bsp; Transferred from my written notes- ACTT 2847.6, 1391 LDGS, A=U seems to be 2429.8 (there were some items regarding the work orders for s=me work done, with an item to record APU times) These seem to be from a G=lfstream Facility, or is the aircraft at Pentastar? They may use the same p=ogram. Seems to have flown approx. 20 hours, and did 12 landings sin=e last June. The CMP reports as from Today. First, inspection due=times- 1A- Due calendar by June 2016 2A- 1000 hours, next due about 1=5 hours from now 4A- 2000 hours, due 1125 hours 'ish' 5A- 2500 hours,=due 1625 hours 'ish' 8A- 4000 hours due 1150 hours 'ish' Ca=endar items: 1C - 12 Month 2C- 24 month 3C- 36 Month 4C- 48 Mon=h EFTA_R1_00137672 EFTA01799185 6C- 72 Month All of the calendar items are due in June, 2016 Fuselage penetration was done i= 9/2013. Big ticket item, but with plenty of time (72 Month?) FWD E-batt=discard due 7/2016 Note: All Customer frequency items have been take= off the due list- Because in long term storage? That includes E-batt BI=E test and some other items. Main battery Cap checks were due 2/2016= There were notes in the WO's for check battery voltage, but nothing for th= Cap checks. Defibulater pads were life limited due 3/2016, maybe remove= as a customer frequency item. Gear corrosion inspections and reappl=cation of compound are due 7/2016- CMP shows 90 M/H for the mains and 40=M/H for the nose. I'm not sure if that includes gear functional checks, a=d blowdown M/H's- I believe that is calculated in. Gear blowdown bot=le is due Hydro 5/2016. No leeway, DOT requirement- There were so=e comments on the brake wear- They all seem to be original from CMP- =t looks like #2 was repaired, and probably reinstalled. There is a proce=ure to install a spacer disk to get more life on the carbon stacks. I'm n=t that familiar with the life on the G-550 brakes, but would expect them to=have life left. The Air Data Modules (ADC's to you and me) show havi=g a 12 month check due 3/2016. It's not the 24 month Altitude/transponde= check, I'm not sure what it involves, but would be overdue. 2 Oxyge= bottles (main) are due hydro in September- a 5 year item. They are due I=fe limit in September 2017- a 15 year requirement. It doesn't make sense=to Hydro, then scrap after 1 year. The forward portable O2 is due Hy=ro 5/2016 Try to make some sense from these notes, and we will talk t=morrow- I expect that you will be at PBI around 11 AM=/a>. As for an Independent overview- You may want to contact Dunc=n Aviation in Battle Creek to send someone- A total third party represen=ative for the buyer- I'm sure that they would be more than willing, and e=pect them to quote you for the required inspections afterwards! FYI-=The Boeing Lay power supply was sent to Consolidated in LI for review of re=air. Talk to you tomorrow- I'll have a better idea on the status b= Lunchtime- Still pushing for Friday (PM!) RTS. Regards, Peteaspan> Sent from my iPhone 2 EFTA_R1_00137673 EFTA01799186

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.