Skip to main content
Skip to content
Case File
efta-efta01799326DOJ Data Set 10Correspondence

EFTA Document EFTA01799326

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01799326
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Richard Kahn < Sent: Sunday, May 1, 2016 9:11 AM To: Jeffrey Epstein Subject: Fwd: Great St James Richard Kahn HBRK Associat=s Inc. 575 Lexington Avenue, 4th Floor New York NY 100=2 Tel Fax Cela Begin forwarded message: From: Hugo Hodge Date: April 30,=2016 at 8:38:50 PM EDT To: Richard Kahn < Subject: =e: Great St James <=iv> With the greatest respect for you and your client, I'm sorr= but HKT will have to respectfully decline to accommodate that offer. =/div> Apparently you have someone off island, unaware of=the local requirements and hopefully the cost you are expecting to pay will=not increase when they acquire that knowledge. $50= is more than 50% below the proposal and, for lack of better words, quite u=acceptable and insulting. Should you run into diff=culties with your other option HKT stands prepared to deliver first class r=sults as described in our written and verbal communication. wrote: O= Apr 30, 2016, at 4:04 PM, Richard Kahn < Thank you. Richard Kahn HBRK Associate= Inc. 575 Lexington Avenue, 4th Floor New York, NY 1002= > > EFTA_R1_00137947 EFTA01799326 Tel Fax Cell On Apr 30, 2016, at 10:27 AM, Hugo Hodge > wr=te: Good m=rning Mr.Kahn, I have thoroughly reviewed your sug=estions for modifications to the bid and given your request great considera=ion. I honestly believe that the items you requested are important for a su=cessful project. For example, the witnessing of the factory acceptance is n=t a step I would recommend omitting. With that sa=d, the items you suggested to remove total $23,000. To ensure the integrity=of this project I am willing to do the project with the entire scope at the=original price less $23,000 for a total of $80,000. If you decline this opt=on and are convinced that these items should be omitted, I am willing to re=uce the remaining items by 10% resulting in a cost of $72,000 for the revis=d scope. I strongly recommend you consider the fi=st option but I am willing to discuss this further with you if necessary.</=iv> Best Regards, Hugo Hodge Jr=/div> On Thu= Apr 28, 2016 at 12:32 PM, Richard Kahn <an; wrote: it was a pleasure speaking with you earlier. as discussed t=e following areas are scopes that will not be needed and my comments: a) conceptual design on cable routes - ok to keep - pl=ase revisit pricing b) detailed cable specs and preparation o= bid docs - ok to keep - please revisit pricing c) derailed switch and meter design and prep of all switches and metering device - =nbsp;ok to keep - please revisit pricing d) review all swi=ch and cable bid submittals and submit to Wapa for approval - ok to=keep - please revisit pricing e) witness factory acceptance t=st - not necessary as all we need is for you to review test from manufac=urer and should be included in d) above f) complete final des=gn to include civil and electrical drawings - ok to keep - please r=visit pricing you this afternoon g) witness installation and test electrical dev=ces - not needed h) complete as builts - not neede= i appreciate your effort in revisiting y=ur pricing and look forward to hearing back from thank you Richard Kahn 2 EFTA_R1_00137948 EFTA01799327 HBRK Associates Inc. =75 Lexington Avenue 4th Floor New York, NY 10022 tel cel 3 EFTA_R1_00137949 EFTA01799328

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.