Case File
efta-efta01806029DOJ Data Set 10CorrespondenceEFTA Document EFTA01806029
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01806029
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
From:
Jeanne Brennan
Sent:
Monday, December 31, 2012 2:51 PM
To:
'J Epstein% trice Gordon'
Cc:
'Richard Kahn; 'Cecile de Jongh'
Subject:
FW: LS1 Solar
See note from Toshiba. Their schedule to =e in USVI has not been finalized and at this point will be =ostponing their site
visit of Jan 7- 11
As soon as I have their =roposal I will forward.
From: =/b> =ttaviano, Jeffrey [mailto:J
To: =abwcpa@
Cc: Creighton, J
Subject: Re: LSJ =olar
Jeanne,
Lonkevych, Mark
I =br>Sent: Friday, December 28, 2012 6:31 PM
I am still on vacation and =pologize, but I was waiting to contact you after I had my other meeting =cheduled. I was
trying to set up a permitting meeting with DPNR, but =ever got a response to my request. At this point I do not think I
will =e making it the week of January 7-11. I have worked up preliminary =umbers and have forwarded them to our
business development people. I =xpect they will be setting up a call after the New Year.
Happy =ew Year,
Jeff
From<=b>: =eanne Brennan
To: =ttaviano, Jeffrey
Cc: Creighton, Jim; 'Morris Anselmi'
Subject: RE: LSJ Solar =br>
Jeff,
br>Sent: Friday, December 28, 2012 12:23 PM
onkevych, Mark
Hope the holidays are =oing well. Can you give me an update on the solar proposal for LSJ and =he day (Jan 7 -11) you
want to do a site visit on the =sland.
Thanks,
Jeanne
From: =/b> =ttaviano, Jeffrey [mailto:[email protected]]
Sent: Monday, December 10, 2012 4:02 =M
To: Jeanne Brennan
EFTA_R1_00153342
EFTA01806029
Cc: Creighton, Jim; Morris =nselmi; Lonkevych, Mark
Subject: RE: LSJ =olar
Jeanne,
We've located a =ower meter on St. Thomas that we can use. We can install it when =e come down in January.
Jeff
Jeff Ottaviano
Toshiba International Corporation
200 Dryden Road, Suite =400
Dresher, PA 19025
866-810-9758 Ext. 44504
http://www.toshi=a.co.jp/sis/en/solar/index.htm
From: =/b> =eanne Brennan [mailto
To: =ttaviano, Jeffrey
Subject: RE: LSJ =olar
Thanks =0:p>
From: =/b> =ttaviano, Jeffrey [mailto
Sent: Saturday, December 08, 2012 =0:04 AM
To:
Subject:
Jeanne,
r>Sent: Saturday, December 08, 2012 9:39 AM
2
EFTA_R1_001 53343
EFTA01806030
I'll look into getting a power =eter. We would install it on the 480 V side of the xfmr to include the =ine and xfmr losses
in the readings. We would compare the temporary =ower meter to the utility meter, thus it would be a time and use
study. =his would be very valuable information to have to properly size the =olar and energy storage system.
I should know my schedule for =he week of January 7.11 by next week.
Jeff
From<=b>: =eanne Brennan
To: =ttaviano, Jeffrey
Cc:
br>Sent: Saturday, December 08, 2012 06:53 AM
=br>Subject: RE: LSJ Solar
Jeff,
The =ransformer for LSJ is located on the Island and owned by LSJ. This =aises the questions:
=/span>What is =he loss at the transformer?
=/span>Do we =eed a time and use study?
=/span>Can you =nstall the power logger?
Also let me know what day works for you and your team =uring the week of Jan 7-11 to visit the Island and I will co-
ordinate =etting it up.
Thanks =0:p>
Jeanne
From: =/b> =ttaviano, Jeffrey imailto:1
Sent: Saturday, December 08, 2012 8:17 =M
To:
Cc:
Sub=ect: Re: LS1 Solar
Jeanne,
That would be one way to do it, =ut if you know the cable size, length and material a calculation can be =one quite
accurately. You could also install a temporary power logger =ver a week or so and then compare that to the utility
meter.
If =he cable was sized properly it should be less than 2% losses. =br>
We have an excellent electrical contractor in St. Croix that has =een working for Hovensa for many years. Let me know if
you want me to =ntroduce him.
3
EFTA_R1_00153344
EFTA01806031
Jeff
From<=b>: =eanne Brennan [mailto
To: =ttaviano, Jeffre
Cc: 'brice gordon'
=br>Subject: RE: LSJ Solar
br>Sent: Saturday, December 08, 2012 06:05 AM
Jeff,
We are trying to determine =f there is significant line loss between the meter on St. Thomas and =he transformer on LSJ.
One suggestion was that we purchase and =nstall an industrial grade current transformer(CT) monitor at the main
=eeder capable, to meter the power in real time and send it to a web =erver for review.
What do you =hink about this idea?
Thanks,
Jeanne
From: =/b> =eanne Brennan (mailto
br>Sent: Monday, December 03, 2012 3:59 PM
To: =Ottaviano, Jeffrey'
Cc: 'Lonkevych, Mark'; 'Sattler, =ouglas'; 'Mark White'; 'Erika Kellerhals'; 'Cecile de Jongh'; 'Richard =ahn'; 'brice gordon';
'Darren Indykel
Subject: RE: LSJ =olar
Jeff,
Please see attached; =APA bills, schematic of the electrical system and the generator =pecs. I will follow with additional
requests. =0:p>
Any additional information or questions let me =now.
Best,
Jeanne
From: =/b> =ttaviano, Jeffrey [mailto
Sent: Wednesday, November 21, 2012 =:25 AM
To: Jeanne Brennan
4
EFTA_R1_001 53345
EFTA01806032
Cc: Lonkevych, Mark; =attler, Douglas; Mark White; Erika Kellerhals; Cecile de =ongh
Subject: RE: LSJ =olar
Jeanne,
An excel history will be =ine for now, but can you at least send us the latest copy of a bill so =hat we can see if there are
any time-of-use and/or demand =harges. That type of data helps in our equipment sizing =alculations.
Thanks again,
Jeff
Jeff Ottaviano
Toshiba International Corporation
200 Dryden Road, Suite =400
Dresher, PA 19025
http://www.toshi=a.co.jp/sis/en/solar/index.htm
From: =/b> =eanne Brennan (mailto:j
I=br>Sent: Wednesday, November 21, 2012 8:21 AM
To: =ttaviano, Jeffrey
Cc: Lonkevych, Mark; Sattler, Douglas; =Mark White.; 'Erika Kellerhals'; 'Cecile de Jongh'
Subject: =E: LSJ Solar
Jeff,
Thanks for the follow =p. We will compile the necessary information requests. =o:p>
Do you prefer a copy of the electricity bills or =n excel history of readings and usage?
Happy Thanksgiving to =11.
Jeanne
5
EFTA_R1_00153346
EFTA01806033
From: =/b> =ttaviano, Jeffrey [mailto:
Sent: Tuesday, November 20, 2012 3:48 =M
To:
Cc: =onkevych, Mark; Sattler, Douglas; Mark White; Erika =ellerhals
Subject: LSJ =olar
Jeanne,
Thank =ou for your time this afternoon and please forward this message to =nyone on your team that should have a
copy.
TIC =ill perform a preliminary feasibility study of solar energy production =n LSJ Island. We are familiar with the
challenges of designing =nd building solar in the Caribbean and have developed cost effective =olutions to meet these
challenges.
Our =nitial thoughts are that a solar PV plant sized to meet the entire =eeds of the island would most likely be the best
solution. This =ill require that we know as much about the electricity consumption and =eneration capabilities as
possible. Please, provide us with 12-24 =onths of VIWAPA electricity bills and if possible any interval or =ime-of-use data
on consumption. This data may be available from =trip charts or data logging of the generators when they were
=unning,
We would also like to have the name plate data on =he generators and a single line diagram of the electrical =ystem.
Also, please indicate on a map where we can locate =he solar array and battery station.
Thank you and have a Happy =hanksgiving,
Jeff
Jeff =ttaviano
6
EFTA_R1_001 53347
EFTA01806034
Toshiba International =orporation
200 Dryden Road, Suite =400
Dresher, PA =9025
http://www.toshi.a.cojp/sisientsolar/index.htm
7
EFTA_R1_001 53348
EFTA01806035
Related Documents (6)
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01681865
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01426265
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01739143
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01266204
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01849302
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01388025
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.