Skip to main content
Skip to content
Case File
efta-efta01825136DOJ Data Set 10Correspondence

EFTA Document EFTA01825136

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01825136
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: From: Sent: Sun 3/21/2010 2:34:37 PM I Jeffrey Epstein FANCELLI PUNCH LIST Wood Paneling at LSJ Office 1. Complete the installation of the toe molding at the baseboard. Material on site. 2. Install closure trim piece of oak belowthe picture window sill to fill gap approx. 3 cm high, the length of the window. 3. Finish rough, unfinished end condition at the sliding panels at the picture window. 4. Drill, file and sand perforations at tilt down desk panels to remove rough and ragged edges. 5. Glue and clamp open joints in paneling through out the room. 6. Generally sand rough finishes and raised grain at paneling through out the room. 7. Replace tortise shell inlay where it is pieced or flaking and delaminating. 8. Repair cabinet door hardware so that the screw does not loosen when the handle is rotated to operate door and so the hardware does not rattle. 9. Supply and install two turtle pulls at tilt down desk panels. 10. Replace bamboo mesh at all cabinet doors with metal mesh in a dark color that will not rust. 11. Replace the non functioning blackboards with slate that will take chalk. The existing surface has been wiped clean with water and dried. The surface does not take chalk satisfactorly. 12. Provide additional light bulbs for the shelf lights inside the cabinets and provide the specification. 13. Confirm the size of the carpet and provide under padding. 14. The staining of the cornice should be like the Escorial Library with light and dark. 15.The staining of the columns should highlight the carvings with light and dark. 16.All wood surfaces in the room are to be finished, currently the undersides of the desk tops are unfinished. 17.Interiors of the cabinets are to be stained darker so as not to appear orange when the shelf lights are on. 18. All wood surfaces are to be varnished. 19. The sliding panels are unfinished plywood, how are they to be finished? The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacationggmail.com, and destroy this communication and all copies thereof, including all attachments. EFTA_R1_00199466 EFTA01825136

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.