Skip to main content
Skip to content
Case File
efta-efta01834787DOJ Data Set 10Correspondence

EFTA Document EFTA01834787

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01834787
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epstein[jeevacation©gmail.com] Cc: Warwick Wicksman ; a kerne [gary kerney I: From: Toni Sze Sent: Sat 1/29/2011 12:55:05 AM Subject: RE: Pool Plan Studies G-7 Jeffrey, Thanks for the quick response. Are we still thinking about the cascading stairs in the previous emails? It will have a huge effect on the stairs down to the pool. The Spa was just a suggestion..it is now gone. If we move the mech space east, it will block the view off the shower room. And the mech space needs to have access off the road as well as fresh air intake. Talk to you soon. Tom Tom Sze, AIA Senior Associate Direct Main Mobile Gensler 2500 Broadway Suite 300 Santa Monica California 90404 USA From: Jeffrey Epstein [mailto:[email protected]] Sent: Friday, January 28, 2011 4:33 PM To: Tom Sze Subject: Re: Pool Plan Studies G-7 EFTA_R1_00214115 EFTA01834787 the stairs are not nice, lets try something else. it ruins the line that we have tried so hard to maintain„ there is no spa? we can go further east for mechanicalls no reason to dig On Sat, Jan 29, 2011 at 1:21 AM, Tom Sze wrote: Jeffrey, Here are two options for the pool based on our conversation yesterday when I called you in Paris. G-7A: The mezzanine has been taken out. Two sets of doors symmetrically placed on the north wall. Entry into the pool room will be through these doors. Stair option going from +57' above all the way down to +38' below. Shower room is now at the southeast corner with a possible view out. ( We need to verify this with the existing topography ) The Pool equipment room is now at the southwest corner. ( Fresh sir intake for HVAC and access could be a problem here ) G-7B: Same exact pool plan with the mezzanine taken out. Another stair option going down to the +38' level at the northwest corner. Introduction of a "Patio" at the entrances to the pool with the vehicle drop-off between the doors. This is a much better transition from the pool to the exterior and gives us a buffer to the road. Additional mechanical/pool equipment space to the south of the shower. ( we need to verify topography here ) Please review and get back to us with your comments. Again, if you would like to bring back the cascading stairs off of the screening room patio, We will more than happy to redesign them back in..just let us know. EFTA_R1_00214116 EFTA01834788 Thanks and have a nice weekend. Tom Tom Sze, Senior Associate Direct Main Mobile Gensler 2500 Broadway Suite 300 Santa Monica California 90404 USA The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail corn, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00214117 EFTA01834789

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.