Case File
efta-efta01837185DOJ Data Set 10CorrespondenceEFTA Document EFTA01837185
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01837185
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
To:
'eevacation
mail.com[[email protected]]
From:
Sent:
Wed 3/ / 011 :22:12 PM
Subject: Gil update
Jeffrey,
Gulfstream is planning to work APU and boost pump on second shift today at 3pm, Quality Control is
researching and hopes to approve the T-Stat install that I brought with on plane, the paper work that came with
the Tstat is 1970 build date, three other Tstat's are listed in parts data base system, but are not ready to ship
since they are waiting bench testing,. There is also a pressure test of pneumatic system for Tstat, Gulfstream
is checking to see if this break out box is on hand in Long Beach,.
-Boost pump issue's will be addressed by Avionics tonight,. suspect corrosion on canon plug in wheel well, and
filter down stream of pump,. are area's we are looking, in addition to Circuit Breaker integrality, 50amp,.
If you approve of below floor inspection in Long Beach, Gulfstream can start Thursday,.
I will keep you posted,
thanks,
Larry
EFTA_R1_00218581
EFTA01837185
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.