Skip to main content
Skip to content
Case File
efta-efta01840912DOJ Data Set 10Correspondence

EFTA Document EFTA01840912

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01840912
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Lvjet From: Jeffrey epstein Sent: Thur 3/15/2012 11:04:34 PM Subject: Re: Gil / B727 Sat Boeing JFK Sorry for all the typos .Sent from my iPhonc On Mar IS, 2012, at 6:53 PM, Lvjet c wrote: Jeffrey, The Boeing is completed and aux tank operational,. Gil update Need to install Rudder, both elevators and rig flight contols tomorrow, engine runs on saturday, once controls are rigged and installed,. Saturday and Sunday would be overtime, and still don't think it will be ready for flight, there is always something that will not ops check good,. personally think Monday is real, aircraft will need full cleaning exterior, interior and stainless steel bright work needs to be polished, which will take a full day, we could pass on this, but should be accomplished,. thx, larry EFTA_R1_00226148 EFTA01840912

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.