Punch List — per JE directives as of December 20, 201Chillax room — motion detector switch — should only have one light switch — Gary Moses 2. 5. Flagpole pool - Take the pool cleaners out - Scuppers are either rusted or broken — please send photo to Bart 6. Chillax room - red and blue rug to be tried — the pillows may be the source of the smell 7. Banquette — two tree lights near banquette 8. Gym - Gutter is leaking in the front Punch List — per JE directives December 2, 2011 13. Flagpole bath and cabana — refrigerator 24" wide, 23" deep, stainless steel, and door swing on right — Brice ordered — robe hook outside shower —pool pump insulation for domestic fresh water distribution pump on order — walkway gates schedule — Bill 6. Electrify info center 7. Five Palms — JE approved height — Tom — two high windows 8. Grotto 9. Heli wall 13. Big wind doors lighting - 2 recessed ceiling lights centered on each side of the doors — set on sconce timer 15. St. John terrace — change lights 16. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it —containment for ISO fuel tank — bathroom and room divider 17. Plants bought from Italian woman 18. Steel shed for the new workshop area 19. Triangle 20entry tree lights 21. Solar fridge, light, fan for pebble beach 22. Humidifiers — Atlanta Refrigeration speaking to Trane — date? 24. Yellow flowering Alamandra up Old Mill wall and Flagpole hill 25. Beach 3 — containers into back of hill — Peter to grade out 27. Solutions for generators — no provisions for sound dampening — design fault — Maguire contract will be emailed to Gary, Tom, Darren, Brice for research into the matter — Brice adjusted shutter 28. Fire system — not working, Brice creating fire charts for the island 29. Top of hill — CLEAN UP - place garbage in circle — build up 10 feet — new helipad 30. Pool — tiled — Bart — JE selected — LS1 orders — Brice to find out Bait's schedule 31. Library windows — K&S researching stainless steel alternatives, or could fabricate 2 windows — hinge open, bolt latch, weather stripped 33. Nursery — completely cleared out of plants by 11/30 — use only for flower production for the rooms 34. Greenhart wood — steps to Grotto 35. Five Palms floor 36. Five Palms doors location 37. St. John terrace lights 3839. Pool equipment and insulation 40. Pool — redo 41. Tree transplants 43. Guestroom door knobs 44. Tiki — shields and kitchen — stainless cabinets from American Export sailing 12/2, EDA 12/ 45.flagpole pool rug, I pool heater rooms. Sunken garden berm Concrete roads at flagpole, EFTA_R1_00241087 EFTA01849182 Conrete triangle. Compass, grotto, pebble beach, Bench placements. Librarby windows resealed. Gym gutter corner Cabana 1 roof Master bed roof screw replace Engineering cleaned and new steel building New vehicles Paint ballet and yoga room EFTA_R1_00241088 EFTA01849183

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.