Case File
efta-efta01884116DOJ Data Set 10CorrespondenceEFTA Document EFTA01884116
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01884116
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
Jeffrey Epsteinheevacation©gmail.comj
Cc:
Richard Kahn
Fm:
Sent
Ur iiWZ6i2 9:45:05 PM
Subject
Re: Pricing on Engineering Building Pad
Wee gordon
We had discussed trying to get the building permitted.
In the future if you want to erect the building we would need a stamped pad plan by govt.
We can skip that if you want.
Tom had said there are drafting services in STT that could draw a simple plan.
The labor figure is using Tom's construction crew, plus a few more workers that they need on the
days they pour cement. I will get Tom to give a breakdown.
Craig
From: Jeffrey Epstein <*eevacation mail.com>
To: Craig Martin
Cc: Richard Kahn
Sent: Thursday, May 10, 2012 4:06 PM
Subject: Re: Pricing on Engineering Building Pad what does site drawings mean . who is doing. this makes no sense, who is doing earthwork and
for how long. i want now to see details , rich follow up
On Thu, May 10, 2012 at 3:55 PM, Craig Martin wrote:
Here is the quote on the engineering building pad.
This is for the pad only. Please see exceptions below.
This pad is designed to hold a future building. Bolts for building, minor drainage is included.
If only a pad is needed without provisions for a building the price could be reduced slightly.
Craig
Ncw Engineering Building Pad
Outside
Material
Labor Shipping Trucking Tax
Vendor
Temp
Enclosure/safety
200
200
Material Handling
600
Equipment Rental
1500
Misc Expenses
1000
1000
Layout/Survey
200
800
E FTA_R1_00298626
EFTA01884116
Earthwork and Demo
Site Drawings
Pest Control
Site Dranage
1000
Pipes/Utilities
500
Concrete
9350
Vapor Barrier
200
2800
2500
1000
1000
2000
8000
200
2000
2500
Ties/Accessories/boltsI500
1000
Rebar
2400
1200
Saw Cutting
250
400
Curing/Protection
300
400
Fine Grade
1000
Wood/Formwork
1200
1400
Fasmers
400
Sub Totals
18500
4300
22700
4500
Total
50000
Note; This is a basic pad
No Utilities, septic sysyem, electrical, wall, or engineering
yard work
The pad will have 3 gray water drains. The pad will not have sanitary
drains
Includes min work on electrical vault
E FTA_R1_00298627
EFTA01884117
The information contained in this communication is confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this communication in error, please notify us immediately by
return c-mail or by c-mail to jeevacafi n mail.cam, and destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
E FTA_R1_00298628
EFTA01884118
Technical Artifacts (6)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Domain
mail.comPhone
1200
1400Phone
400
1200Phone
500
1000Phone
500
4300Phone
700
4500Related Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.