Skip to main content
Skip to content
Case File
efta-efta01887321DOJ Data Set 10Correspondence

EFTA Document EFTA01887321

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01887321
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: J EpsteinUeevacation©gmail.conl From: BMG Sent Mon 4/23/2012 1:15:40 PM Subject: Fwd: Re: Sent from my iPhone Begin forwarded message: From: Date: April 22, 2012 10:43:30 AM GMT-04:00 To: brice gordon Cc: A TOM MELNICK Daphne Wallace- Subject Good Morning to All, Please note below - changes/additionshtpdates. Daphne could you please update the Punch List to reflect these points, please call if you require more details Warmest regards always Karen On Sun, Apr 22, 2012 at 10:14 AM wrote: On Sat, Apr 21, 2012 at 4:35 PM wrote: 5 Palms - Desk to be sent from NYC - Sarah will make arrangements Outside Light Boxes on back & front walls to be covered over Lights - light Parrots and building - from roof line (retangler 24 x 10) lighting to be installed in ceiling - 4/23 Outside Coral stone seat - Brice will forward changes to Tom Retaining Wall requires layout Concrete Benches need placement Grade require flatten/building up Relocate grasses from Beach - JE will select location Generator Pad - 24th Mirrored Siding due on site 4/24 EFTA_R1_00304330 EFTA01887321 Cabinets/Shelves - to be completed by Bill Doors - will confirm delivery date 4/23 Fire Box - requires construction with Mexician Tile on floor area Painting - Final outside coat to be completed once all work as finished Level Dirt/Trees - 30th Grotto - Road to mimic Starfish Market Concrete pour 23th - complete 25th More dirt required on left hand side as you look down, then hydroseed Shutters/Generator Doors/Storage Doors - to be completed by John Flagpole Pool - Palm lighting starts 4/23 Bern - Crusher Runs, place inside Berm Area 50 Planter Boxes require construction - size to be determined by JE Relocate Tie Downs to Engineering Main Compound - Plant Goats Foot Vine on hillside Repairing of coral stone deck areas Coral Stone Threshold's in guests rooms need to be cut Table on dock - final size to be determined - to be completed by John coral stone top Dock - Redo entry. Brice to source dock wood locally Enginerring - Area needs to be leveled and metal shed to be laid out Old Floating Dock - move to high road EFTA_R1_00304331 EFTA01887322 Hanger - 2 x Queen Beds/Frames - purchase 4/26 Coconut Drawers, relocate to Hanger 4/26 Tel: Fax: Tel: Fax: Tel: Fax: EFTA_R1_00304332 EFTA01887323

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.