To:
J EpsteinUeevacation©gmail.conl
From:
BMG
Sent
Mon 4/23/2012 1:15:40 PM
Subject: Fwd: Re:
Sent from my iPhone
Begin forwarded message:
From:
Date: April 22, 2012 10:43:30 AM GMT-04:00
To: brice gordon
Cc: A
TOM MELNICK
Daphne Wallace-
Subject
Good Morning to All,
Please note below - changes/additionshtpdates. Daphne could you please update
the Punch List to reflect these points, please call if you require more details
Warmest regards always
Karen
On Sun, Apr 22, 2012 at 10:14 AM
wrote:
On Sat, Apr 21, 2012 at 4:35 PM
wrote:
5 Palms - Desk to be sent from NYC - Sarah will make arrangements
Outside Light Boxes on back & front walls to be covered over
Lights - light Parrots and building - from roof line (retangler 24 x 10)
lighting to be installed in ceiling - 4/23
Outside Coral stone seat - Brice will forward changes to Tom
Retaining Wall requires layout
Concrete Benches need placement
Grade require flatten/building up
Relocate grasses from Beach - JE will select location
Generator Pad - 24th
Mirrored Siding due on site 4/24
EFTA_R1_00304330
EFTA01887321
Cabinets/Shelves - to be completed by Bill
Doors - will confirm delivery date 4/23
Fire Box - requires construction with Mexician Tile on floor area
Painting - Final outside coat to be completed once all work as
finished
Level Dirt/Trees - 30th
Grotto - Road to mimic Starfish Market
Concrete pour 23th - complete 25th
More dirt required on left hand side as you look down, then
hydroseed
Shutters/Generator Doors/Storage Doors - to be completed by John
Flagpole Pool - Palm lighting starts 4/23
Bern - Crusher Runs, place inside Berm Area
50 Planter Boxes require construction - size to be determined by JE
Relocate Tie Downs to Engineering
Main Compound - Plant Goats Foot Vine on hillside
Repairing of coral stone deck areas
Coral Stone Threshold's in guests rooms need to be cut
Table on dock - final size to be determined - to be completed by John
coral stone top
Dock - Redo entry. Brice to source dock wood locally
Enginerring - Area needs to be leveled and metal shed to be laid out
Old Floating Dock - move to high road
EFTA_R1_00304331
EFTA01887322
Hanger - 2 x Queen Beds/Frames - purchase 4/26
Coconut Drawers, relocate to Hanger 4/26
Tel:
Fax:
Tel:
Fax:
Tel:
Fax:
EFTA_R1_00304332
EFTA01887323
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.