Skip to main content
Skip to content
Case File
efta-efta01904783DOJ Data Set 10Correspondence

EFTA Document EFTA01904783

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01904783
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Jeffrey Epsteinijeevacationegmall.comi From: Richard Kahn Sent Thur 2/21/2013 6:46:02 PM Subject• Fwd: LSJ_LISTON_021113_$1,400.00 Please advise Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, New York, New York 10022 Begin forwarded message: From: Daphne Wallace Date: February 21 To: Richard Kahn Cc: Jeanne Brennan Subject: Re: LSJ_LISTON_021113_$1A00.00 Greetings Rich, Pcr Jermainc, I. Danny did not discuss the location or range of the unit prior to Jermaine and Liston Networks being on site, which was 1/28/2013. When they arrived that Monday, Danny met Jermaine and the Liston crew at the dock and stated that since the Main complex has good cell signal, a better test would be at Five Palms, where the signal quality is poor. Jermaine told Danny to verify with Brice if it was okay to install the antenna on Five Palms rather than on the Screen room, as was originally plan, when Jermaine spoke with JE about "trying a booster". 2. Jermaine, Danny and the Liston crew were at Five Palms when Danny called Brice for approval of the installation at this site, and Brice then asked Danny if the range was strong enough to go past a mile. Jermaine responded that it was not, but it would definitely cover 500 feet beyond Five Palms. Only when Liston was on site were these questions asked and answered. 3. Brice then directed for the antenna to be set in the original slated location, which was the roof of the Screen room. Per Jermaine, if Danny only needed the location and range questions answered, now having received the information, the Liston crew could have been dismissed, and Danny could have then proceeded with the installation as was the original plan, and Jermaine still would have assisted, which was the original agreement. EFTA_R1_00336865 EFTA01904783 I was updating Jermaine religiously on items that related to him on the Punch List, asking him to update me on his items, and updates that came via Karen. Not once was it mentioned on the Punch List that Danny was awaiting information from Jermaine before be could proceed with the antenna installation. Please advise, DW > On Thu, Feb 21, 2013 at 12:18 PM, Richard Kahn < wrote: fYi Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, New York, New York 10022 Begin forwarded message: From: Date: February 20, 2013 8:23:41 AM E To: Richard Kahn < Cc: Jeffrey stein 021113_$1,400.00 brice gordon Good Morning Rich, Jermaine, did ask Danny to install the antenna, which was on site 1/15/13, but Danny required a location and the range of the unit, these questions were never answered, as Jermaine did not know. Only when Liston was on site were these questions answered. The only piece of equipment that Danny was asked to install was the antenna, which he could not do without the above questions being answered. Hoping this answers your concerns Wannest regards On Tue, Feb 19, 2013 at 7:02 PM, Richard Kahn wrote: I am told that Danny was asked to do this installation by Jermaine numerous times but was to busy therefore we hired Liston Please advise EFTA_R1_00336866 EFTA01904784 Thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue, 4th Floor, 0022 On Feb 12, 2013, at 3:46 PM, LSJ wrote: Good afternoon Jennaine Thanks for clarification I will attach you info to check request Thanks again Wannest rcgards Sent from my iPhone On Feb 12, 2013, at 12:26 PM, "Jermaine Ruan" <a wrote: Good morning JE gave a verbal directive on the 12/24/12 at FTC to get the cell repeater. Danny couldn't complete the mounting of the antenna. Therefore on 1/25/13 I got the verbal from JE to proceed with a sub-contractor to mount the cell repeater along with the termination of the fiber blue beach. JE also sent me an email on the 1/29/13 asking where was the repeater to be mounted. The "testing" is for the wiring to verify negative line loss. EFTA_R1_00336867 EFTA01904785 The configuration of "Surecell" Radio was done in accordance with "Surecell" specifications. The manufacture sent a piece of equipment that does not work and will be returned to the manufacturer. Liston Networks is consulting with a former AT&T Technician to verify. If this effort fails the unit will be returned to "SureCell". Regards JRuan From: Sent: Monday, February 11, 2013 5:46 PM To: Jermaine Ruan Subject: LSJ_LISTON_021113_$1,400.00 Hi Jermaine, In reference to Liston Network Systems for the billing of mounting cell antennas, do you have any backup noting JE approval? Also noting they said they tested equipment, not quite correct since there was no power at that point Can you fill in the blanks as I will be asked Thanks Warmest regards LSJ,LLC Island Manager 6I00 Red Hook Quarters Suite B3 St Thomas USVI 00802 Tel: Fax: EFTA_R1_00336868 EFTA01904786 LSJ,LLC Island Manager 6100 Red Hook Quarters Suite B3 St Thomas USVI 00802 EFTA_R1_00336869 EFTA01904787

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreference

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.