Skip to main content
Skip to content
Case File
efta-efta01929493DOJ Data Set 10Correspondence

EFTA Document EFTA01929493

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01929493
Pages
0
Persons
0
Integrity
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: Brice Gordon From: Jeffrey Epstein Sent Mon 4/21/2014 10:51:16 PM Subject Re: Dakota Well Richard Kahn no choice it seems , do we have to drill another well. this will be number 3" ? On Mon, Apr 21, 2014 at 6:34 PM, Brice Gordon wrote: Jeffrey Attached for your reference: a memo from Casey Cook outlining "Water Supply at Zorro Ranch" photo from Dakota well showing wire bundle at 50ft 1 1. Dakota Well Rogers confirmed that about 500 feet of wire was removed, the remaining wire has become stuck, despite further attempts this could not be retrieved. None of the sounding tube was recovered. Rogers opinion is that any further effort to remove the stuck wire, pipe etc. would be futile and recommends no further action. Casey Cook concur's with their recommendation. 2. The Ranch requires, approx 25 afa per year for existing domestic, irrigation and ranch related use. The present infrastructure located at Wells 4, B & K is unable to deliver enough water to meet the needs of the Ranch. Well pump size, storage, distribution pumps and piping will all need to addressed to resolve this issue. 3. Well 6 which is located close to Dakota Well has been brought back online to supplement the loss of production from the Dakota Well. Estimated production levels from Well 6 is around 25 gpm. Casey Cook recommends having the Well cleaned and a pump test performed to confirm production levels I have concerns regarding sustainability of this Well, but at this time there is no choice but to run it. Requesting approval to move forward with budgetary estimates for your review: I: Expansion of the existing water distribution system to maximized, production levels and to meet existing demand from Wells, 4,6,B & K 2: Cleaning and pump test Well 6 3: Prepare a water distribution plan outlining present and possible future development of Wells/Water Distribution to perfect existing water rights. Can we proceed? regards Brice Brice Gordon 49 Zorro Ranch Rd EFTA_R1_00378688 EFTA01929493 Stanley, NM 87056 Ph: please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00378689 EFTA01929494

Technical Artifacts (3)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refreference
Wire Refwire bundle

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.