Skip to main content
Skip to content
Case File
efta-efta01985597DOJ Data Set 10Correspondence

EFTA Document EFTA01985597

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01985597
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
To: jeevacation©gmail.com[jeevacation©gmail.com]. Jeffrey Epsteinbeeyacation©gmail.corn] Cc: thomas melnick( From: Marc Dober Sent Mon 11/21/2011 4:43:54 PM Subject: Construction questions Jeff, Here are most of the construction questions: I. Need a decision on the dock house railing paint color 2. Tom needs to get architectural drawings and final design for 5 palms. He will be back in this area during your visit and we need some direction there or we will need to stop. 3. Flagpole — sent many pictures with the walls painted — do you still want to raise the gates to hide area all together. 4. Flagpole — do you want a gate on the lattice box — there needs to be access to the back equipment room 5. Flagpole — what landscaping do you want along the lattice wall that faces the road. You originally wanted ficus but please confirm 6. Do you want us to finish the wall to the info center? We are 95% complete 7. Palm tree placement on big hill — the new measurements are - the distance from the wall to the line, is 13'6" which is 8'6" closer to the wall than the last line which was 22 feet from the wall. The "new line" is a line made by Shane the surveyor and myself based on your request to have a line "level with the foundation of the Cabana 4 wall" . Please confirm 8. Gym renovations — need a scope of what you want done here. 9. Flagpole pool — sent you an email on proposed schedule to re-plaster. Basically he said he can be in and out in 5 days once all material is on island. 5 days does not seem logical here. 10. Dock shelter- all the material for the dock shelter is on island. We need a design to get started. I. New Helipad — when do you want to do this so I can get it scheduled with Tom. 12. Staff cottage — we need a full set of plans and architectural drawings. Tom can't build off what we have been given. EFTA_R1_00475202 EFTA01985597 Thanks Marc EFTA_R1_00476203 EFTA01985598

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.