Case File
efta-efta01989479DOJ Data Set 10CorrespondenceEFTA Document EFTA01989479
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta01989479
Pages
0
Persons
0
Integrity
Loading PDF viewer...
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
To:
[email protected][[email protected]];
jeevacation
mail.com '[email protected]]
From:
Sent:
Thur 4/4/2013 6:51:14 PM
Subject: GIV Update Engine
Jeffrey,
Gulfstream made an error in determining the size of crack in Burner can on Rill engine,. what was thought to be
a 3 inch crack in bumer can turned out to be .85 inch crack, well within Rolls Royce manual for cracks.
The UH engine thought to have a piece of spray nozzle missing or burnt away, turned out to be Coking by the
fuel nozzle. This was determined by Rolls Royce after they review the photos taken during Borescope.
I will bring copies for your review of cracks,.
The UH engine is perfect,
Test flight is scheduled for Monday at noon,. after test flight, we will borescope the APU,.
thank you,
Larry
EFTA_R1_00481719
EFTA01989479
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.