Case File
efta-efta02002368DOJ Data Set 10CorrespondenceEFTA Document EFTA02002368
Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta02002368
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...
Extracted Text (OCR)
EFTA DisclosureText extracted via OCR from the original document. May contain errors from the scanning process.
To:
[email protected][[email protected]]; Jeffrey Epstein[[email protected]]
From:
Warwick Wicksman
Sent:
Thur 4/28/2011 5:43:12 PM
Subject: RE: Flagpole Pool Paving - Questions
Ok. thanks.
Warwick Wicksman, AIA
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
http://www.Gensler.com
Click here to view Gensler's 2010 Annual Report.
From: Jeffrey Epstein [mailto:[email protected]]
Sent: Thursday, April 28, 2011 10:39 AM
To: Warwick Wicksman
Subject: Re: Flagpole Pool Paving - Questions
they are bottle palms and only about 8 feet high„ same as the colums on the south side
On Thu, Apr 28, 2011 at 1:12 PM, Warwick Wicksman •;:
=
wrote:
Ok. I assumed by "lett" Jeffrey was referring to the north side (jell side in images I sent). Please sec attached pdf
and confirm I have this correct!
Arc we set on the planter with 6 palms on the south side? That sounds too dense...
Thanks,
Warwick
EFTA_R1_00499586
EFTA02002368
Warwick Wicksman, AIA
Prin i I
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
lutp://viww,Gensler,com
Click here to view Gensler's 2010 Annual Report.
From: Gary Kerney [mailscl
Sent: Thursday, April 28, 2011 9:44 AM
To: Warwick Wicksman
Cc: Jeffrey Epstein; Tom Sze
Subject: RE: Flagpole Pool Paving - Questions
there is no structure south ,only north and it stays at the 13'8" in line with the palm
a planter is south with 6 palms in the same position as the collums
Message-----
From: Warwick Wicksman
Sent: Thu 4/28/2011 10:52 AM
To: Gary Kerney
Cc: Jeffrey Epstein; Tom Sze
Subject: RE: Flagpole Pool Paving - Questions
Gary,
I am going to take the north shade structure off our drawings per Jeffrey. I still need to know how to locate the
south shade structure relative to the south wall! Can we shift it north a couple of feet closer to the pool? It was
about 12'4" from waterline to center of columns, before we shifted it to match the north structure shift. (I would
prefer to not move the south wall south. We would also need to move the north wall to maintain some symmetry,
and the way they meet the existing walls would seem odd.)
Jeffrey,
Can we add some flush planter areas within the deck area, to reduce the amount of Hardscape? Just need to know
if that is an option, or a non-starter.
Thanks,
EFTA_R1_00499587
EFTA02002369
Warwick
Warwick Wicksman, AIA
jos
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
htto://www.Gensler.cona <http://wv,Iv.eensler.com/>
Click here to view Gensler's 2010 Annual Report.
<hup://www.gensler.conthiploads/documents/AR 2010 02 18 2011.pdf>
From: Jeffrey Epstein (tnailto:[email protected]
Sent: Wednesday, April 27, 2011 4:55 PM
To: Warwick Wicksman
Cc: Gary Kerney
Subject: Re: Flagpole Pool Paving
no reason to limit it to coral stone whatsoever.
On Wed, Apr 27, 2011 at 7:44 PM, Warwick Wicksman
rote:
Not sure yet - Toni and I are discussing a few ideas:
Keep the field coral stone, and use a different stone for the carpets, borders and other accents.
Larger coral stone for the diagonal field (24x24 or larger).
Alternate material/stone for the field (but I do not think colored/stained concrete would be appropriate).
I just want to make sure we understand the parameters. For example, if it all has to be made out of 16x16 coral
stone. We arc working on patterns using smaller cut pieces - 8x8's, 8xI6's, I 2x 12's - for the accents.
Warwick Wicksman, AIA
Princi al
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
EFTA_R1_00499588
EFTA02002370
USA
http://www.Gensler.com <Ints:/Avww.aensler.com/>
Click here to view Gensler's 2010 Annual Report.
<hup://www.gensler.com/uploads/documents/AR 2010 02 18 2011.pdf>
From: Jeffrey Epstein Imailto:[email protected]
Sent: Wednesday. April 27, 2011 4:34 PM
To: Warwick Wicksman
Subject: Re: Flagpole Pool Paving
what do you suggest.?
On Wed, Apr 27, 2011 at 7:26 PM, Warwick Wicksman
ote:
My main concern is that could be a lot of deck arca to cover, and 16x16 may be too fussy for the main field (not the
carpets or accents). Attached is a view of the old pool deck. I do not think it would stand out of some of that was
turned at a 45 degree angle. Sec also attached paving at entry to the garden, where there arc two angles.
Warwick Wicksman, AIA
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
http://www.Gensler.com <littp:/Avww.gensler.comt>
Click here to view Gensler's 2010 Annual Report.
<huo://www.aensler.com/uoloads/documents/AR 2010 02 18 2011.pdf>
From: Gary Kerney S[n
1111.
Sent: Wednesday, April 27,
To: Jeffrey Epstein; Warwick Wicksman
Subject: RE: Flagpole Pool Paving
16x 16 is our stock in coral
the rugs typicaly in the main compound are cutting to 8x16 and doing a double border and diagonal I6x16 field
within the borders
EFTA_R1_00499589
EFTA02002371
Jeffrey could see maby some I2x12 satillo tile or the 6x6 blue waterline tile as a accent/border component in the
deck as well
From: Jeffrey Epstein ImailtoieevacationOtamail.coml
Sent: Wed 4/27/2011 2:25 PM
To: Warwick Wicksman
Cc: Gary Kerney
Subject: Re: Flagpole Pool Paving
flush„ and please provide hardscpe.. the shade structure on left „ unfortunaley does not work on site, you are
forced to look at ugly rocks, face south.. so i chose to replace it with landscape.. Unfortualtey though I said from
the begining that attempting to design this project from your offices would be virtulaly impossible these things
reinforce that postion.. like the main house, where the roads terrace are still in the same stage from christmas , is
holding up the project.
On Wed, Apr 27, 2011 at 11:01 AM, Warwick Wicksman
Jeffrey and Gary,
wrote:
Are there any comments on the flagpole pool drawings I sent last week? I still need to know the following, so we
can finish these drawings:
How far do you want to shill the new north and south walls away from the shade structures?
What are our options for the coral stone paving or other materials? Is it just 16"x16" or smaller? Can we
get larger sizes? We need to be able to have some larger pattern sizes, or it all looks too uniform even with pattern
direction changes.
Attached are images of the shade structures flush with the deck, and raised 6" as requested. Which do you
want to go with?
Thanks,
Warwick
Warwick Wicksman, AIA
Prin i I
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
httD://www.GenSler.COm <httl)://www.aenSler,coml>
EFTA_R1_00499590
EFTA02002372
Click here to view Gensler's 2010 Annual Report.
<httnizwww.eensler.cominoloadsidocuments/AR 2010 02 18 2011 Axil>
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any pan thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to iecvacalionritemail.com <[email protected]> and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any pan thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to ieevacation(itentail.com <mailto:icevacation(itemail.com> and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation(iegmail.com <mailto:[email protected]> and
EFTA_R1_00499591
EFTA02002373
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
* * * * * * * * * * * * * * * * * * * * * * * * Rini
at * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00499592
EFTA02002374
Related Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01984524
1p
DOJ Data Set 10OtherUnknown
EFTA01868031
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01754820
0p
DOJ Data Set 10OtherUnknown
EFTA01818023
1p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA01998241
0p
DOJ Data Set 10CorrespondenceUnknown
EFTA Document EFTA02125460
0p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.