Skip to main content
Skip to content
Case File
efta-efta02110383DOJ Data Set 10Correspondence

EFTA Document EFTA02110383

Date
Unknown
Source
DOJ Data Set 10
Reference
efta-efta02110383
Pages
0
Persons
0
Integrity
No Hash Available
Loading PDF viewer...

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
richardkahnl2 mail.com rom: Lvjet Sent: Mon 3/24/2014 8:37:12 PM Subject: Fwd: updates I ment to include you both on this email to Jeffrey, It appears he was not please or surprised when I informed him of the 24 month inspection that is due in 90 days June 30th, so I sent Jeffrey the DUE list that I review every week, (sometimes). - -also, JE wanted to depart ST THOMAS at midnight April 4th to arrive in Phoenix to clear customs,. flight time is 7+10min,. that would have us land in PHX at 5am,.. however, Customs is open only, 830am to 4:30pm for hours of operation. "' JE wants a small plane charter for March 31st, St Martaan to St Thomas, maybe they are arriving on airlines from EU? SEE update to JE below, thx Larry ---Original Messa e---- From: Lvjet > To: jeevacation Sent: Mon, Mar 24, 2014 4:28 pm Subject: Re: updates Jeffrey, PHX Customs flight OK,. April 4th ? Customs is not enforcing Overflight, as long as operator has obtained Overflight in the past. (as we have), we are allowed to fly into any AOE (Airport of Entry). with prior approval. Phoenix Customs hours of operation Monday - Friday 8:30am - 4:30pm only, no overtime according to officer on duty. Phoenix will approve overflight after they review passengers listed on EAPIS for this flight on April 4th and we must land between the hours of 8:30am and 4:30pm Monday - Friday. OUTFLOW Valve: Gulfstream Tech ops has to locate in their archives the original drawings for our GIV serial number, 1085, this has been our delay in getting an answer and or approval, whether Gulfstream will use other installation drawings or fabricate New ones for procedure to install new louvers,. I have contacted Rusty Crammer our DU885 Sales Rep, to assist with pushing Gulfstream to give an answer regarding installing other style outflow valve louvers, CHARTER St. Martaan to St Thomas March 31st, 2014 St Thomas Jet Center Charter has Twin Engine Piper Navajo Panther, (similar to our past Cessna 421). price St. Martaan to St Thomas $1,920.00 all fees and Handling included. GIV Due list below with dates,. Below is my due list for Gulfstream IV that will take me thru November 2014,. calendar items and inspections are sometimes hidden in these reports,. many items are complied with during routine Mx visits to Teterboro and Islip to keep the GIV operating as smooth as possible. In the future I will give a minimum of 12 month waming of impending inspections that will come due, so we can address Mx scheduing properly, Aircraft Due List: Ordered by next due based on utilization Select a compliance (unction: Click Here to Select Function GoTo: ATA Code Management GoTo: LogBook/MTR Entry for Checked Items GoTo: Maintenance Due List EFTA_R1_00730426 EFTA02110383 RPT: Airframe Times Due List (ATA Code w Ref) RPT: Airframe Times Due List (ATA Code) RPT: Airframe Times Due List (Due Date w Ref) RPT: Airframe Times Due List (Due Date) RPT: Airframe Times Due List By Group (ATA Code) RPT: Airframe Times Due List By Group (Due Date) RPT: Component Transaction (Part Rem) for Checked RPT: Current Status of Checked Items RPT: Due List (ABS) RPT: Due List with Projected Due Date (ATA Code) RPT: Due List with Projected Due Date (Due Date) RPT: Excel Output for Checked Items RPT: Maint Quote Related (Excel) for Checked RPT: Maint Quote Related for Checked RPT: Maintenance Due List (ATA Code) RPT: Maintenance Due List (Due Date) RPT: Maintenance Due List (STD) RPT: Maintenance Due List By Hrs/Cyc/Date (STD) RPT: Maintenance Quote (Excel) for Checked Items RPT: Maintenance Quote (STD) for Checked Items RPT: Mechanic Signet (ABS) for Checked Items RPT: Mechanic Signoff (STD) for Checked Items RPT: Mechanic Signoff With Related for Checked RPT: Parent Child Signori for Checked Items RPT: Status Summary (STD) Of Checked Items RPT: Task Card Package for Checked Items Updating Due and Remains Information ... Please Wait Retrieving data ... Please Wait Includes recurring and mandatory service information that have not been accomplished All related codes due within the projection are included Projected Through Hours:8802.5 Landings:4057 Date:28 Nov 2014 Select All Checkboxes I De.select All Chockboxos Delta ATA Code Logbook Description Compliance Interval 353012 (P) Airframe Oxygen Bottle, #2 Portable - Removal / Installation 180 P/N: 176965S-M-B-3 SIN: 672761 Due: End Of Month Custom Frequency N 262562 (P) Airframe Portable H2O Fire Extinguisher (Aft Cabin) - 60 LI: Hydrostatic Test Due: End Of Month 15K 262631 (P) Airframe Portable Halon Fire Extinguisher (Right Cockpit) - 1 MC Inspection Tolerance +15 DAY Due: End Of Month EFTA_R1_00730427 EFTA02110384 E 262632 (P) Airframe Portable HaIon Fire Extinguisher (Forward Cabin) - Inspection N 262633 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) - Inspection N 320004 Airframe Main Landing Gear (Left) - Lubrication N 320005 Airframe Main Landing Gear (Right) - Lubrication 320006 (P) Airframe Nose Gear - Lubrication 1 MO 1 MO NNW 4 MO 4 MO 4 MO Tolerance +15 DAY Due: End Of Month N 240178 Airframe Battery #3. Emergency Service 6 ':!OS Custom Frequency N 243105 (P) Airframe Battery. #1--Capacity Check 6 ',I OS PIN: RG-380E-44 SIN: 40336977 Tolerance +1/-1 MOS Custom Frequency EFTA_R1_00730428 EFTA02110385 2 MOS 243106 (P) Airframe Battery. #2--Capacity Check PIN: RG-380E-44 SIN: 40494892 '.105 Tolerance +1/-1 MOS Custom Frequency 12 MOS : 346019 Airframe FMS No. 1 NDB - Update 28 DA Tolerance -8 DAY 346020 Airframe FMS No. 2 NDB - Update 28 DP Tolerance -8 DAY 346021 Airframe FMS No. 3 NOB - Update 28 DP Tolerance -8 DAY Vi 254001 (P) Airframe Lavatory Compartment Above Floor - Inspection 1000 I- N 994002 (P) Airframe AD74-08-09 R3 Lavatory Paper and Linen Waste 1000 I- Receptacle Enclosure Access Door and Disposal Door Inspection IX 240260 (P) Airframe Emergency Securaplane Battery I Heater Assembly 48 MI No. 1 - Replacement Da0:, P/N: 160.0201-02 S/N: 1410 COS* 304003 Airframe Windshield Wiper Lock Pin - Lubrication / 6 MO Adjustment +is pAyi Due_ Wit EFTA_R1_00730429 EFTA02110386 Of Month H 323112 (P) Airframe Landing Gear Emergency Air Bottle - Hydrostatic 36 M: Test Due: End P/N: 1159SCH233-5 SIN: 12398C1 Of Month E 381010 Airframe Filter Element, No. 1 Potable Water System - Removal / Installation P/N: 778000 SIN: 381025 (P) Airframe Potable Water System - Flush I Sanitize E 539516 (P) Airframe Antenna Interface - Inspection El 314007 Airframe FWC No. 1 Trend and Limit Monitoring - Data Download 314008 Airframe FWC No. 2 Trend and Limit Monitoring - Data Download MI 340100 Airframe Reduced Vertical Separation Minimum (RVSM) Monitoring Policy 6 MOS 111 6 MOS 72 MC Tolerance +15 DAY Due: End Of Month Custom Frequency 90 DAY Custom Freque 1000 HRS 12 6 MOS Initia EFTA_R1_00730430 EFTA02110387 IX 262622 (P) Airframe Portable Halon Fire Extinguisher (Forward Cabin) - 12 MOS Weight Check +15 DAY Due: End Of Month X 262623 (P) Airframe Portable Halon Fire Extinguisher (Aft Cabin) - 12 MC Weight Check 521080 (P) Airframe Inflatable Door Seal - Purging Procedure N 710019 (P) Engine 1 Powerplant Internal - Inspection El 710019 (710020) (P) Engine 2 Powerplant Internal - Inspection Tolerance +15 DAY Due: End Of Month Tolerance +15 DAY Due: End Of Month Tolerance +15 DAY Due: End Of Month Tolerance +15 DAY Due: End Of Month fil 100310• Airframe CK AIRWORTHY DIRECTIVES 3 MC P/N: ? SIN: Due: End Of Month X 100320' Airframe CK SERVICE BULLETINS P/N: 9 S/N: Due: End Of Month EFTA_R1_00730431 EFTA02110388 212077 (P) Airframe Air Conditioning Shut-off Valve Filter (Left) - 24 MC Inspection Tolerance +15 DAY Due: End Of Month 212078(P) Airframe Air Conditioning Shut-off Valve Filter (Right) - 24 MC Inspection Tolerance +15 DAY Due: End Of Month 212115 Airframe Nose Compartment Cooling System - Operational 24 MC Test Tolerance +15 DAY Due: End Of Month -:213053 Airframe Cabin Pressure Warning Indication System - 24 MC Functional Test Tolerance +15 DAY Due: End Of Month / 213081 (P) Airframe Pressurization Safety Valve - Inspection 24 MC Tolerance +15 DAY Due: End Of Month X 213090 Airframe Cabin Pressure Controller (Manual Mode) - 24 (.1C Operational Test Tolerance +15 DAY Due: End Of Month : : 216097 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 MC Switch (Left) - Trip Point Check Tolerance +15 DAY EFTA_R1_00730432 EFTA02110389 Due: End Of Month " 216098 (P) Airframe Air Cycle Machine Compressor Outlet Overheat 24 MC Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month ".. 236010 (P) Airframe Static Discharger Wick (Left Wing) - Resistance 24 MC Check Tolerance +15 DAY Due: End Of Month 236011 (P) Airframe Static Discharger Wick (Right Wing) - Resistance 21 MC Check Tolerance +15 DAY Due: End Of Month 236014 (P) Airframe Static Discharger Wick (Left Horizontal Stabilizer) - 21 MC Resistance Check Tolerance +15 DAY Due: End Of Month 236015 (P) Airframe Static Discharger Wick (Right Horizontal Stabilizer) - 24 MC Resistance Check Tolerance +15 DAY Due: End Of Month :•: 237041 (P) Airframe CVR Underwater Locator Beacon (DK100 / DK120) - Operational Test Tolerance P/N: OK120 SIN: +15 DAY Due: End Of Month EFTA_R1_00730433 EFTA02110390 M 237047 (P) Airframe CVR Underwater Locator Beacon - Battery Voltage Check (DK100 DK120) P/N: DK120 S/N: 24 MI X 251125 Airframe Pilot / Copilot Inertia Reel - Operational Test 24 MC Tolerance), +15 DAY Due: End Of Month. N 261035 (P) Airframe Engine Alternator Overheat Switch (Left) - Trip 24 MC Point Check Tolerant& +15 DAY Due: End Of Month 261036(P) Airframe Engine Alternator Overheat Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month N 261065 (P) Airframe Combined Hydraulic System Overheat Switch - Trip Point Check Tolerance +15 DAY Due: End Of Month r<:261066 (P) Airframe Flight Hydraulic System Overheat Switch - Trip 24 niC Point Check Tolerance +15 DAY Due: End Of Monti V 261235 (P) Airframe Bleed Air Manifold Overheat Switch (Left) - Trip 24 MC Point Check EFTA_R1_00730434 EFTA02110391 Due: End Of Month 261236 (P) Airframe Bleed Air Manifold Overheat Switch (Right) - Trip Point Check Tolerance +15 DAY Due: End Of Month 261440 (P) Airframe APU Overheat Switch - Trip Point Check El 262075 (P) Airframe Fire Bottle (APU) - Weight Check IX 262155 Airframe Fire Pull Handle - Operational Test Tolerance +15 DAY Due: End Of Month 24 MC 24 MC Tolerance' +15 DAY Due: End Of Month Ns: 262165 (P) Airframe Fire Extinguisher System (Left) - Functional Test 24 MC Tolerance +15 DAY Due: End Of Month IX 262166 (P) Airframe Fire Extinguisher System (Right) - Functional Test Tolerance +15 DAY Due: End Of Month EFTA_R1_00730435 EFTA02110392 262170 Airframe Fire Extinguisher System (APU) - Functional Test 303006 Airframe Standby Pitot Heat System - Operational Test 303009 Airframe Total Temperature Probe Heat System - Operational Test r7. 303012 Airframe Angle of Attack Heat - Operational Test *15DINti EMI 24 MC 24 MC 24 MC 24 MC X 320010 (P) Airframe Landing Gear (Right Main) Corrosion Inhibiting 24 MC Compound Reapplication 431 320034 (P) Airframe Nose Landing Gear Corrosion Inhibiting Compound 24 MC Reapplication Oven Due: End Of Month EFTA_R1_00730436 EFTA02110393 V 321041 Airframe Main Gear Shock Absorber (Left) - Service V 321042 Airframe Main Gear Shock Absorber (Right) - Service M 322006 (P) Airframe Nose Gear Shock Strut - Friction Check 322028 Airframe Nose Gear Shock Strut - Service N 323025 (P) Airframe Main Gear Side Brace Fitting Pin (Left) - Inspection ".: 323026 (P) Airframe Main Gear Side Brace Fitting Pin (Right) - Inspection 24 MC 24 MC 24 MC 24 MC +15 DAY Due: End Of Month 24 MC 121212110 +15 DAY Due: End Of Month 24 MC Tolerance +15 DAY Due: End Of Month 'i. 362005 Airframe Bleed Air Manifold Pressure Indication - Functional 24 MC Test Tolerance +15 DAY EFTA_R1_00730437 EFTA02110394 Due: End Of Month 510070 Airframe 24 Month Honeycomb (Aluminum Panels Only) - Inspection / Bond Test 521007(P) Tolerance +15 DAY Due: End Of Month Airframe Main Entrance Door - Inspection 24 MC Tolerance +15 DAY Due: End Of Month Ig 521024 (P) Airframe Main Entrance Door Hinge Pins - Inspection 24 MC IX 521051 Airframe Door Seal Pressure Regulator - Functional Test 24 MC rdl 532017 (P) El 532019 (P) Airframe Cockpit Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month Airframe Cockpit Compartment Below Floor - Inspection Tolerance +15 DAY Due: End Of Month EFTA_R1_00730438 EFTA02110395 M. 532021 (P) Airframe Cockpit Compartment Below Pedestal - Inspection 24 MC 103091 +15 DAY Due: End Of Month 532027 Airframe Entrance Compartment Behind Panel - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 532029 Airframe Entrance Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month . 532031 (P) Airframe Entrance Compartment Below Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 532033 (P) Airframe Entrance Compartment Shelf - Inspection Tolerance +15 DAY Due: End Of Month 181532041 (P) Airframe Baggage Compartment Above Floor - Inspection 24 MC Tolerance +15 DAY Due: End Of Month I 532045 Airframe Baggage Compartment Behind Panel - Inspection EFTA_R1_00730439 EFTA02110396 Due: End Of Month ' 532050 Airframe Engine / APU Fuel Feed Line - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 532052 (P) Airframe Torque Box - Inspection Tolerance +15 DAY Due: End Of Month 532055 Airframe Fuselage Interior i Wing Attach - Inspection Tolerance +15 DAY Due: End Of Month 532070 Airframe Shear Clips Aft Fuselage - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 3000 Hrs Init 533005 Airframe Exterior Fuselage - Inspection 24 MC Tolerance +15 DAY Due: End Of Month H 535008 (P) Airframe Nose Compartment / Radome Interior - Inspection 24 MC Tolerance +15 DAY EFTA_R1_00730440 EFTA02110397 Due: End Of Month 535012(P) Airframe Tail Cone Interior - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 562005 (P) Airframe Emergency Window Release Mechanism (Internal and External) - Functional Test 24 MC Tolerance +15 DAY Due: End Of Month ' 783005 (P) Airframe Engine Thrust Reverser (Left) - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 783006 (P) Airframe Engine Thrust Reverser (Right) - Inspection 24 MC Tolerance +15 DAY Due: End Of Month 236020 (P) Airframe Static Discharger Wick (Tail Cone) - Resistance 24 MC Check Tolerance +15 DAY Due: End Of Month 243030 (P) Airframe Auxiliary TRU - Inspection / Cleaning Tolerance +15 DAY Due: End Of Month EFTA_R1_00730441 EFTA02110398 fill 243189 Airframe Battery Circulating Fan - Operational Test 24 MC Ill 262621 (P) Airframe Portable liaIon Fire Extinguisher (Right Cockpit) - 12 MC Weight Check Tolerant:4 +15 DAY:j Due: End! Of Month: 320009 (P) Airframe Landing Gear (Left Main) Corrosion Inhibiting ',IC M323004 (P) Compound Reapplication Airframe Landing Gear - Emergency - Functional Test Tolerance +15 DAY Over Flight Due: End Of Month Tolerance +15 DAY Due: End Of Month BI 527012 Airframe Tail Compartment Door Waming System - 24 MC Operational Test Tolerance +15 DAY Due: End Of Month DA 532067 (P) Airframe Tail Compartment Above Floor - Inspection 24 MI 571064 Airframe Wing to Fuselage Attachments (Left) - Ultrasonic 24 MC and Visual Corrosion Damage Tolerance Inspection tolerance. EFTA_R1_00730442 EFTA02110399 twit got OfMorilh •. 783009 Airframe Engine Thrust Reverser (Left) - Operational Test 24 MC Mint 05:DAYI Z 783010 Airframe Engine Thrust Reverser (Right) - Operational Test 24 MC Thiatth +15 DAVI Due: Emil Of Monifi 7.1 212200 (P) Airframe Display Unit Fan Fitter - Inspection 450 HF Tolerance +151-Irs 273019 Airframe Elevator Trim Tab Actuator (Left) - Lubrication 450 - 5 Tolerance +15 Its 273020 Airframe Elevator Trim Tab Actuator (Right) - Lubrication 450 'h,5 S 344051 (P) Airframe Tolerance +15 Ws IRU No. 1 Blower Filter - Inspection 450 HF PIN: 26000790-101 SIN: EFTA_R1_00730443 EFTA02110400 +15 Hrs Tolerance +15 Hrs 344055 (P) Airframe IRU No. 3 Blower Filter - Inspection 450 HF PIN: 26000790-101 SIN: Tolerance +15 His • ' 242008 (P) Airframe R Engine Alternator Bearing - Discard 2500 HF PIN: 154777-5 SIN: NSN 213083 (P) Airframe Pressurization Safety Valve - Ground Test 24 Mc Tolerance +15 DAY Due: End Of Month Ir. 236016 (P) Airframe Static Discharger Wick (Vertical Stabilizer) - Resistance Check Tolerance +15 DAY Due: End Of Month 270006 Airframe Shutoff Valve. Flight Control Manual - Operational 24>u Test Tolerance +15 DAY Due: End Of Month 1.. 276001 Airframe Ground Spoiler System - Operational Test 24 Mc EFTA_R1_00730444 EFTA02110401 Tolerance +15 DAY Due: End Of Month :-1276004 (P) Airframe Ground Spoiler Fault Detection System - 24 MC Functional Test Tolerance +15 DAY Due: End Of Month 282038 Airframe Fuel Pump Auto Change - Operational Test 24 MC Tolerance +15 DAY Due: End Of Month r 282073 Airframe APU Wing Fuel Shut-off Valve - Functional Test 24 MC Tolerance'. +15 DAY Due: End Of Month 301005 Airframe Wing Anti-Ice (Left) - Operational Test 24 MC Tolerance +15 DAY Due: End Of Month H 301006 Airframe Wing Anti-Ice (Right) - Operational Test Tolerance +15 DAY Due: End Of Month 302005 Airframe Cowl Anti-Ice (Left Engine) - Operational Test 24 fi.i1( Tolerance +15 DAY Due: End Of Month EFTA_R1_00730445 EFTA02110402 tg 302006 Airframe Cowl Anti-Ice (Right Engine) - Operational Test Ig 323001 (P) Airframe Landing Gear - Normal - Functional Test M 341052 Airframe Total Air Temperature Probe Aspirator - Operational Test ER 352005 (P) Airframe Passenger Oxygen System - Operational Test 24 Mc 24 Mc 24 MC 24 Mc t:kiezEntli 0040ath! 527005 Airframe Main Entrance Door Warning System - Operational 24 M( Test Tolerance +15 DAY, Due: End Of Month 527008 Airframe Baggage Door Warning System - Operational Test Tolerance +15 DAY Due: End Of Month 532005 Airframe Cabin Compartment Above Floor - Inspection 24 MC EFTA_R1_00730446 EFTA02110403 Tolerance +15 DAY Due: End Of Month 1532069(P) Airframe Tail Compartment Below Floor - Inspection 24 M Due: End Of Month 541019 (P) Airframe Pylon Internal (Left) - Inspection 18 MC Tolerance +15 DAY Due: End Of Month • 541020 (P) Airframe Pylon Internal (Right) - Inspection 18 ry1( Tolerance +15 DAY Due: End Of Month 723001 Engine 1 Intermediate Compressor Case. Engine - Inspection Tolerance +15 DAY Due: End Of Month 723001 (723002) Engine 2 761001 (P) Intermediate Compressor Case, Engine - Inspection Tolerance +15 DAY Due: End Of Month Engine 1 Engine Control - Operational Test 9 ICC 9 r.',C Tolerance +15 DAY Due: End Of Month EFTA_R1_00730447 EFTA02110404 761001 (761002) (P) Engine 2 Engine Control - Operational Test Tolerance +15 DAY Due: End Of Month 761005 Engine 1 Controls, Engine - Service I Lubrication Tolerance +15 DAY Due: End Of Month :•: 761005 (761006) Engine 2 Controls, Engine - Service / Lubrication Tolerance +15 DAY Due: End Of Month : : 217075 (P) Airframe Water Separator Bag (Left) - Inspection Tolerance +15 Hrs : : 217076 (P) Airframe Water Separator Bag (Right) - Inspection Tolerance +15 Hrs X 240108 Airframe Standby Power System - Operational Test 300 HF Tolerance'. +15 Firs 321057 Airframe Main Gear Timer Valve Striker Arm (Left) - 150 HF Inspection Tolerance +15 Hrs 321058 Airframe Main Gear Timer Valve Striker Arm (Right) - 150 HF EFTA_R1_00730448 EFTA02110405 Inspection Tolerance +15 Hrs IAirframe Pylon External / Internal (Left) - Inspection 300 HF Tolerance +15 Hrs ■ 541018 Airframe Pylon External / Internal (Right) - Inspection 300 HF ■ 554007 Airframe Rudder External - Inspection 150 HF 2000 Cvc Initi RI 710021 Airframe Engine External (Left) - Inspection 150 HF I ltTi 18 710022 Airframe Engine External (Right) - Inspection 150 HF +15 Hrs II 801011 Airframe Engine Starter Oil Level (Left) - Check 300 HR Tolerance +15 Hrs E 801012 Airframe Engine Starter Oil Level (Right) - Check 300 HR Tolerance +15 Hrs EFTA_R1_00730449 EFTA02110406 : : 200001' (P) 276065 (P) H 730001 Airframe Airframe Engine 1 OPERATION ONE Takeoff Alarm System - Functional Test Fuel Contamination Check. Engine - Inspection 150 HF 150 HR 150 HF Tolerance +15 Hrs 730001 (730002) Engine 2 Fuel Contamination Check. Engine - Inspection 150 Hf Tolerance +15 Hrs 742001 Engine 1 Engine Ignition System - Operational Check 150 HF 742001 (742002) Engine 2 Engine Ignition System - Operational Check 150 HF 792007 (P) 792007 (792009) (P) 999005 Engine 1 Filter, Engine Pressure Oil - Cleaning / Inspection Engine 2 Filter. Engine Pressure Oil - Cleaning / Inspection Airframe rage +15 Hrs 150 HR Tolerance +15 Hrs 150 I r. Tolerance +15 Hrs AD 90-02-05 Takeoff Alarm (S/N 1000 -1092) 150 HR: EFTA_R1_00730450 EFTA02110407 X1292010 (P) Airframe Auxiliary Hydraulic Filter (Pressure) - Inspection P/N: AC-B451F-8 SIN: Due: End Of Month 292012(P) Airframe Auxiliary Hydraulic Filter (Return) - Inspection t,' P/N: AC-B451F-8 SIN: Due: End Of Month H 212033 Airframe Ram Air Check Valve - Inspection 48 MC Tolerance +15 DAY Due: End Of Month X 237004 Airframe Cockpit Voice Recorder System - Operational Test 12 MC Tolerance +15 DAY Due: End Of Month FA 240262 (P) Airframe Emergency Securaplane Battery / Heater Assembly 48 M No. 3 - Replacement Due: End P/N: 362-0101-01 SIN: 0707149 Of Month 270011 Airframe Control Surface Hinge Joints - Lubrication 12 MC +15 DAY Due: End Of Month 275013 Airframe Emergency Flap System - Operational Test 48 t..1( Tolerance +15 DAY Due: End Of Month EFTA_R1_00730451 EFTA02110408 MI 321053 (P) Airframe Main Landing Gear (Left) - Corrosion Prevention 48 Mc 24 MOS 'nit 18 321054 (P) Airframe Main Landing Gear (Right) - Corrosion Prevention 48 MC ISM= +15 DAY Due: End Of Month 24 MOS Init DI 322040 (P) Airframe Nose Gear Strut Assembly - Corrosion Prevention 48 MC Tolerance +15 DAY Due: End Of Month Event Category Lubrication/Servicing (S) Mfg Ref Number: 32-22-00 Doc: GIV AMM Rev: Temp Rev 57-2 Issued: 28 Aug 2005 Section: 05-01-00 Documents AMM 322040 Task Card Watched RII Ops Package PN Enter Part Number SN Last Updated By: Ru Vilcan Date: 20 Sep 2010 11:44 Show Remarks Show C/W History Show Related Codes C/W Adjustments Airframe Time used for Due Calculation Hours:7690.5 Cycles:3545 Firs: Lnd: Date: Freq CM 7690.! 354! 17 Sep 201( Ner Est. Parts/Labor: Mx. Note No Part Information Show C/W Adjustmer Ops Spec Initial Frequency:N/A Recurring Frequency:48 MOS Next due was not adjuste EFTA_R1_00730452 EFTA02110409 d. Date: 17 Se 2010 Frequency Tolerance:+15 DAY Part Details Manufacturer: RB - Rebuilt R - Repaired S • Serviceable Install Status: TC - Time Continued -Inspected NI - Modified N - New 0 - Overhauled Current Part Run Time: HoursLandingsMonths TSN TSO TSR Vendor: Mod Status: NW Version: Part Warranty: SW Version: Labor Warranty: Maint Tag: Airframe Time at Install Part Time at Install New Cost: Hours:7690.5 Cycles: 3545 Date: 17 Sep 2010 Hours Cycles Months or Date ] TSN: El TSO: Overhauled: Repaired: TSR: OEM Vendor: Install Notes: Vendor ID: Compliance Remarks ---- FOR REFERENCE ONLY ----- 346031 (P) Airframe FMS Navigation Computer No. 1 - Battery Pack Replacement Due: End PIN: 7020116-1 SIN: NSN Of Month Custom Frequency IX 346032 (P) Airframe FMS Navigation Computer No. 2 - Battery Pack 24 ',1O5 Replacement Due: End P/N: 7020116-1 S/N: NSN Of Month Custom Frequency ISI 346033 (P) Airframe FMS Navigation Computer No. 3 - Battery Pack Replacement PIN: 7020116-1 SIN: NSN 24 MO£ EFTA_R1_00730453 EFTA02110410 982270 Airframe CB 227 Oxygen (ATA 35), Replacement - Oxygen System Flexible Hoses, PN O2C20T1 36 MOf. Squawks and Discrepancies Status Squawk Date Type Description Date Cleared Cleared By Corrective Action Trk # Init. MEL Date MEL Type Del Period Ext Ext Period Tot Def Period Exp -----Original Message— From: Jeffrey acationegmail.com> To: lvjet Sent: Mon, Mar 24, 2014 3:06 pm news to me on the June date. charter from st maarten? , outflow.? The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of Jeffrey Epstein Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by retum e-mail or by e-mail to jeevacationeDgmail.com and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA_R1_00730454 EFTA02110411

Technical Artifacts (37)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domainacationegmail.com
Domainjeevacationedgmail.com
Domainmail.com
Phone2110383
Phone2110384
Phone2110385
Phone2110386
Phone2110387
Phone2110388
Phone2110389
Phone2110390
Phone2110391
Phone2110392
Phone2110393
Phone2110394
Phone2110395
Phone2110396
Phone2110397
Phone2110398
Phone2110399
Phone2110400
Phone2110401
Phone2110402
Phone2110403
Phone2110404
Phone2110405
Phone2110406
Phone2110407
Phone2110408
Phone2110409
Phone2110410
Phone2110411
Phone362-0101
Phone6000790
Phone7020116
Wire RefREFERENCE
Wire RefRef Number

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.