Skip to main content
Skip to content
Case File
sd-10-EFTA01366501Dept. of JusticeOther

EFTA Document EFTA01366501

Amendment #4 Page 72 of 868 tehisMS,Ordholl adatonal costs be our &stress and may reduce ermined), generation during the time in which we ming the affected projects no compliance which could rave a rretenal adverse effect on Our lousiness, fnancel condition, results of operations cash flows and CAFD Subs:meetly all of Ott assets are also Steed to the rules and regulations apacable to power generators generally it we tail to COMply wth these mandatory rekabdity standards we crud be subsea t

Date
Unknown
Source
Dept. of Justice
Reference
sd-10-EFTA01366501
Pages
1
Persons
0
Integrity
Loading PDF viewer...

Summary

Amendment #4 Page 72 of 868 tehisMS,Ordholl adatonal costs be our &stress and may reduce ermined), generation during the time in which we ming the affected projects no compliance which could rave a rretenal adverse effect on Our lousiness, fnancel condition, results of operations cash flows and CAFD Subs:meetly all of Ott assets are also Steed to the rules and regulations apacable to power generators generally it we tail to COMply wth these mandatory rekabdity standards we crud be subsea t

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Amendment #4 Page 72 of 868 tehisMS,Ordholl adatonal costs be our &stress and may reduce ermined), generation during the time in which we ming the affected projects no compliance which could rave a rretenal adverse effect on Our lousiness, fnancel condition, results of operations cash flows and CAFD Subs:meetly all of Ott assets are also Steed to the rules and regulations apacable to power generators generally it we tail to COMply wth these mandatory rekabdity standards we crud be subsea to sand ons including substantial monetary penalises. increased comp ence oorgations and oscorcecton from the grid Ow Sponsor, and third parties with whom we have entered Into or expect to enter Info call rights agreements, may incur additional costs or delays In completing the construction of certain power generation facilities, which could materially adversely affect ow growth strategy. Cur gowth strategy is dependent to a egnhcant degree on acquiring new dean energy an:sects from out Sponsor and thrd parties. Our Sponsors or such third parties' faikre to complete such reelects in a timely manner. a at all, could have a rretenal adverse effect on our goMh strategy. The constnichon of dean energy facilities waves many nsks incluarg • delays in Waring. or the ratty tor:idea necessary permits and scenes. • delays and increased costs related to the irterconnearm of new power generation facilities to to transmapsion system, • the inabilrty to acquire or maintain land use ard access nghts. • the failure to recent contracted thirdparty services. a-corruptions to dispatch at our facilities. • supply interruptions, • work stoppages, • labor deputes, • weather interferences, • unforeseen ergreerirg entronmentri, geological and hydrological problems • Lrenoopeted cost overtime a excess of budgeted commences • failure of col-tracts-IQ parties to perform under cortraas ncluding engineenng, procurement and constriction contractors, and • operations and maintenance costs not covered by warranties or that coos following excretion at warrartes Any of these risks could cause a delay n the cornea:on of protects order development which could have a matenal adverse effect on cur crcwth strategy Maintenance. expansion and refurbishment of power generation facilities involve signiactint risks that could result In unplanned power outages or reduced output. r fan ties :my rearm: our rod c upgrading are improvement Arty unexpected OperatiOnal Or rieriental la 'lure, inCluding failure IttatoCatted with oreakdowns are forced outages, and any decreased twatOral Or management perfamance. coati reduce our facilities' generating capacity below expected leveks, thereby reduong our revenues and ieoparding cur abely to pay oviriends to holders d our Class A common stock at 64 http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058029 CONFIDENTIAL SONY GM_00204213 EFTA01366501

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

URLhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78
Wire Refrefurbishment

Related Documents (6)

Dept. of JusticeOtherUnknown

EFTA Document EFTA01367209

Amendment #4 Page 780 of 868 lailleg.ceefFet 7. Accounts receivable 2014 2013 Enteesa Nacional de Energia Dec-Inca (ENEE) f 12,293,184 S 5,660,657 Value added taxes (VAT) related to the Ropers construction 2,430,081 3,107.508 Crane rental servces receivable 21347 161.187 Caws 77,046 58,304 14,823838 8,985 656 Less nonourreM portion (VAT) (2,430161) (3,107 508) 123015.177 S 5.878.148 'Re outstanding balances due from ENEE correspond to trade reoewablee for the sale of ele

1p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01366493

Amendment #4 Page 64 of 868 alai or co! on, associated with inputs and equpment are necessary to ccnethci renewable energy power plants Most of these tax tenet ts have expiration dates that relay or may not be extended Without these tax benefts the cost of construcorg renewable energy projects would sign-acanthi increase Government nceroves provide significant support br renewable energy sources, SW" as solar and wind energy, and a decrease in ease tax tenants mad racese the costs of imett

1p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01366659

Amendment #4 Page 230 of 868 110.kg c.:59 rnr The National Energy Regulator of South Africa or 'NERSA• is the pnmery regulator of South Atnca's energy sector and is responsible for regulating electricity, piped-gas and petroleum psehre irclustnes Solar and wind projects are governed by the Electricity Regulat on Act, which is the primary enabling legslaton for the RE PPP program and by other legslation applicable to water affairs, environmental affairs agriculture. forestry and fisheries an

1p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01407289

NAME SEARCHED: Harry Beller PWM BIS-RESEARCH performed due diligence research in accordance with the standards set by AML Compliance for your business We completed thorough searches on your subject name(s) in the required databases and have attached the search results under the correct heading below. Significant negative media results may require escalation to senior business, Legal and Compliance management. Also, all accounts involving PEPs must be escalated. Search: Result: RDC PCR

58p
Dept. of JusticeAug 22, 2017

15 July 7 2016 - July 17 2016 working progress_Redacted.pdf

Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith     Hello Warden Smith,     mother is anxious to hear the results of your inquiry into her daughter's health.   I'd be grateful if you could  email or call me at your earliest convenience.  I'm free today after 2 p.m.  Alternatively, we could meet after the Prison  Board of Inspectors Meeting this coming Thursday.    Best wishes,    Janet Irons    1 Kristen M. Simkins From: Sent:

1196p
Dept. of JusticeOtherUnknown

EFTA Document EFTA01340338

LOCKHEED MARTIN 23 November 2021 Via Email - Assistant United States Attorney One St. Andrew's Plaza New York, New York 10007 Re: United States v. Ghislaine Maxwell, 20 Cr. 330 (AJN) Subpoena to Lockheed Martin - Returnable 11/29/21 Dear ‘=: Attached please find Lockheed Martin's response to the subpoena issued in this matter. Due to the age of the files, many of which pit-date Lockheed Martin's acquisition of Sikorsky Aircraft Corporation, it has taken us some time to retrieve the

2p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.