Skip to main content
Skip to content
Case File
sd-10-EFTA01366609Dept. of JusticeOther

EFTA Document EFTA01366609

Amendment #4 Page 180 of 868 *Mr ie toi ems Wad energy s ten second fastest growirg source of generation capacity, with a protected CAGR 0114% from 2010 to 2020. Annual global wind energy installations are expected to ircrease from 49 GW ri 2014 to 57 GW n 2020 The f cdowng chart reflects the actual and protected growth cf areal global wed energy installations from 2010 to 2020. Global annual wind energy installations (in GW). 2010-2020 141 4? 49 I 411 41 2C10 rot) 2012 2013 20

Date
Unknown
Source
Dept. of Justice
Reference
sd-10-EFTA01366609
Pages
1
Persons
0
Integrity
Loading PDF viewer...

Summary

Amendment #4 Page 180 of 868 *Mr ie toi ems Wad energy s ten second fastest growirg source of generation capacity, with a protected CAGR 0114% from 2010 to 2020. Annual global wind energy installations are expected to ircrease from 49 GW ri 2014 to 57 GW n 2020 The f cdowng chart reflects the actual and protected growth cf areal global wed energy installations from 2010 to 2020. Global annual wind energy installations (in GW). 2010-2020 141 4? 49 I 411 41 2C10 rot) 2012 2013 20

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Amendment #4 Page 180 of 868 *Mr ie toi ems Wad energy s ten second fastest growirg source of generation capacity, with a protected CAGR 0114% from 2010 to 2020. Annual global wind energy installations are expected to ircrease from 49 GW ri 2014 to 57 GW n 2020 The f cdowng chart reflects the actual and protected growth cf areal global wed energy installations from 2010 to 2020. Global annual wind energy installations (in GW). 2010-2020 141 4? 49 I 411 41 2C10 rot) 2012 2013 2014 )29154 2ot4E NITE Mete 20114 2010E • 494444 *AS O1.4u. 4194•49 In On... (2( Seam eacenbeg New Emig y Emma (1) 11/4 44949:1 Mr tem melee 10 MOAN Wm IMAM* in Asa <tempi Jimpaeli). Late Meade and Pre Mold , EMI 0U'er mime, manta on/lone Amen= 0cema. Juipansnd ChM Doren bj giddy uncertarty in the tinted States demand fa wind energy generation capecity temporarily contracted in 2013. Due to this technology s increasing cost compettweness and geographic cefersification. global demand fcr wind power is curter/ less &flea to policy incertanty n indmclual markets Arndt wind energy installations in our initial target markets are expected to add 188 GW between 2014 and 2020, repesentrg a CAGR of 14% From 2015 to 2020, 334 GW of aggregate wind energy generation capeoty is expected to be inflated globally. require.° total investmerts of approximately 5664 bate() The (0E0W019 Chan reflects the total annual eriveaMent in global wind Inatallators from 2015 to 2020 Total annual investment In global wind capacity (in billions), 2016-2020 I _ 1 1 , m 11/1.0 MIMI Met Ftert Same eternberg N. 091(91 E119994 Hydro-electric energy ltdro-electricay is the largest souce ot renewable erergy, with 978 GW of global raged capacity in 2013 rectesertng 63% cif Octal renewable energy Staled capacity Hydro-elecenc generation is a well established 172 http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015 CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0058137 CONFIDENTIAL SONY GM_00204321 EFTA01366609

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

URLhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78

Related Documents (6)

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.