EFTA Document EFTA01367246
Amendment #4 Page 817 of 868 1.11,1/ Crott, III% 10. Property, plant and equipment Buiclinas alba h ner y and equipment Major spare parts stun ture and equipment Vehicles Construction In progress Total Cost As of Decerrter 31, 2012 510.148.637 $67834,807 $805,712 S 81556 S 92.174 S — $79.052.886 AdItions 105.792 176,290 — 52133 3,930 — 337,694 Retirements — — — (8.996) — — (8,9%) As of December 31. 2013 10,254 429 66011,076 895,712 12'693 95,67
Summary
Amendment #4 Page 817 of 868 1.11,1/ Crott, III% 10. Property, plant and equipment Buiclinas alba h ner y and equipment Major spare parts stun ture and equipment Vehicles Construction In progress Total Cost As of Decerrter 31, 2012 510.148.637 $67834,807 $805,712 S 81556 S 92.174 S — $79.052.886 AdItions 105.792 176,290 — 52133 3,930 — 337,694 Retirements — — — (8.996) — — (8,9%) As of December 31. 2013 10,254 429 66011,076 895,712 12'693 95,67
Ask AI About This Document
Extracted Text (OCR)
Technical Artifacts (3)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
21158174498136http://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.