Skip to main content
Skip to content
Case File
efta-efta00092872DOJ Data Set 9Other

Subject: RE: Two things

From: Subject: RE: Two things Date: Fri, 16 Aug 2019 16:08:06 +0000 Attachments: 2019-08-15_JE_nolle_letter revised_(002).docz; 2019.08.15_Epstein_NolleJ002).docx On the nolle, I would irup io se we keep the order itself vanilla but do a cover letter that captures some of the broader points I think =hoped to capture. With respect to both, we hope to get the ME report later today or Monday. Drafts of both attached. Original Messa e From: ( ) Sent: Thursda , Au ust 15 2019 7:13 PM To: Cc: Subject: Re: Two things Sent from my iPhone > On Aug 15, 2019, at 7:04 PM, M > wrote: > Yes, perhaps I should have said that I recognize we won't file till Monday. Basically, I'd like to have it ready for signature first thing Monday. > Thanks. > Sent from my iPhone >> On Aug 15, 2019, at 6:48 PM, wrote: >> Attached. And we got a draft from the team. we just haven't had time to focus on yet. We can try to get something circulated tomorrow, but given that will be in DC, I think

Date
Unknown
Source
DOJ Data Set 9
Reference
EFTA 00092872
Pages
1
Persons
0
Integrity

Summary

From: Subject: RE: Two things Date: Fri, 16 Aug 2019 16:08:06 +0000 Attachments: 2019-08-15_JE_nolle_letter revised_(002).docz; 2019.08.15_Epstein_NolleJ002).docx On the nolle, I would irup io se we keep the order itself vanilla but do a cover letter that captures some of the broader points I think =hoped to capture. With respect to both, we hope to get the ME report later today or Monday. Drafts of both attached. Original Messa e From: ( ) Sent: Thursda , Au ust 15 2019 7:13 PM To: Cc: Subject: Re: Two things Sent from my iPhone > On Aug 15, 2019, at 7:04 PM, M > wrote: > Yes, perhaps I should have said that I recognize we won't file till Monday. Basically, I'd like to have it ready for signature first thing Monday. > Thanks. > Sent from my iPhone >> On Aug 15, 2019, at 6:48 PM, wrote: >> Attached. And we got a draft from the team. we just haven't had time to focus on yet. We can try to get something circulated tomorrow, but given that will be in DC, I think

Tags

eftadataset-9vol00009

Ask AI About This Document

0Share
PostReddit
Review This Document

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Subject: RE: Two things Date: Fri, 16 Aug 2019 16:08:06 +0000 Attachments: 2019-08-15_JE_nolle_letter revised_(002).docz; 2019.08.15_Epstein_NolleJ002).docx On the nolle, I would irup io se we keep the order itself vanilla but do a cover letter that captures some of the broader points I think =hoped to capture. With respect to both, we hope to get the ME report later today or Monday. Drafts of both attached. Original Messa e From: ( ) Sent: Thursda , Au ust 15 2019 7:13 PM To: Cc: Subject: Re: Two things Sent from my iPhone > On Aug 15, 2019, at 7:04 PM, M > wrote: > Yes, perhaps I should have said that I recognize we won't file till Monday. Basically, I'd like to have it ready for signature first thing Monday. > Thanks. > Sent from my iPhone >> On Aug 15, 2019, at 6:48 PM, wrote: >> Attached. And we got a draft from the team. we just haven't had time to focus on yet. We can try to get something circulated tomorrow, but given that will be in DC, I think realistically this is something we're not filing until Monday. >> Original Messa e » From: >> Sent: Thursda Au ust 15 2019 6:46 PM » To: >> Subject: Two things >> I. Can I see the Avenatti MTD? >> 2. What is the timing on the Epstein nolle? >> » Sent from my iPhone >> <Avenatti Mem. in Supp. Mot. To Dismiss and For Discovety.pdf> EFTA00092872

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,500+ persons in the Epstein files. 100% free, ad-free, and independent.

Support This ProjectSupported by 1,550+ people worldwide
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.