ManhattanvilleConstructionUpdateforWeeksofOctober092017andOctober162017

Construction Update Manhattanville in West Harlem Campus Plan Construction Activities for the Next Two Weeks C olumbia’s long-term plan for the old Manhattanville manufacturing area will revitalize the four former industrial blocks from 125th/129th to 133rd Street between Broadway and 12th Avenue, and three small blocks along the east side of Broadway from 131st to 134th Street, into an environmentally sustainable and publicly accessible center for academic and civic life woven into the fabri

Date
February 22, 2018
Source
Court Unsealed
Reference
dc-4385581
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Construction Update Manhattanville in West Harlem Campus Plan Construction Activities for the Next Two Weeks C olumbia’s long-term plan for the old Manhattanville manufacturing area will revitalize the four former industrial blocks from 125th/129th to 133rd Street between Broadway and 12th Avenue, and three small blocks along the east side of Broadway from 131st to 134th Street, into an environmentally sustainable and publicly accessible center for academic and civic life woven into the fabri

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Construction Update Manhattanville in West Harlem Campus Plan Construction Activities for the Next Two Weeks C olumbia’s long-term plan for the old Manhattanville manufacturing area will revitalize the four former industrial blocks from 125th/129th to 133rd Street between Broadway and 12th Avenue, and three small blocks along the east side of Broadway from 131st to 134th Street, into an environmentally sustainable and publicly accessible center for academic and civic life woven into the fabric of the West Harlem community. Construction Activities for the Weeks of: October 9, 2017 and October 16, 2017 What is happening Jerome L. Greene Science Center  Guard booth installation along W.130th Street The Forum Electrical roughing at the below-grade level, street-level space, and second level Mechanical and plumbing roughing at the below-grade, first, and second levels Precast installation is substantially complete. Precast punchlist work is ongoing. Installing store front frames at street-level space and curtain wall frames and hardware at levels two and three Masonry installation of auditorium walls at level three Pour mechanical pads and prime walls at below-grade level Pulling cable at W.129th Street utilities Work to take place on Saturdays for the remainder of the year Open Space: Small Square and site work on W129th, W130th and Broadway around Jerome L. Greene Science Center  Planting of perennials and street trees Phase 2 Foundations  Mass excavation work (westerly portion of site bounded by 12th Ave, W.130th and W.131st streets) Temporary support of excavation work along W.131st Street Installation of temporary tiebacks beneath W. 130th Street bridge Load testing for foundation minipiles and installation of production minipiles Install concrete pile caps at west end of site Install pressure slab at west end of site What to expect Construction activity  Regular weekday work hours: 7:00 a.m. to 6:00 p.m. Saturday and Sunday work hours: 7:00 a.m. to 5:00 p.m. Material deliveries to site is ongoing -Please note that all activities are subject to change based on weather and other field conditions- (Over) Construction Update Weeks of October 9, 2017 and October 16, 2017 Construction Update Weeks of October 9, 2017 and October 16, 2017 What to expect (continued) Temporary Traffic and Transportation Impacts  No standing on W.125th Street between Broadway and W.129th Street Truck loading only on the west side of Broadway from 129th to 130th streets W.131st Street between Broadway and 615 W.131st Street is closed until early 2019 W.129th Street between Broadway and W.125th Street is closed until December 2017 Neighboring construction projects not related to Columbia For information on the New York City Economic Development Corporation's West 125th Street Streetscape Improvement Project, please contact Patrick Jordan at 917-439-4630 or [email protected]. For more information on New York City Department of Transportation’s Protective Coating of the Riverside Drive Viaduct from St. Clair Place to 135th St., please contact Community Liaison Hugh Smith at 917-434-1385 or via e-mail at [email protected]. Need More Information? For project updates and information, please visit http://manhattanville.columbia.edu. For questions or concerns, e-mail [email protected] or call our Services Center at 212-854-2222, 24 hours a day, seven days a week. Sustainable Partnerships LEED ND Stage 1 Platinum Certified Plan

Technical Artifacts (7)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone212-854-2222
Phone917-434-1385
Phone917-439-4630
URLhttp://manhattanville.columbia.edu

Related Documents (6)

DOJ Data Set 8CorrespondenceUnknown

EFTA00016484

0p
DOJ Data Set 11OtherUnknown

EFTA02420041

58p
DOJ Data Set 9OtherUnknown

USDC SDNY

USDC SDNY DOCUMENT ELECTRONICALLY FILED DOC 0: DATE FILED: 11/15/21 SMITH VILLAZOR November 15, 2021 BY E-MAIL to The Honorable Alison J. Nathan United States District Judge Southern District of New York New York, New York 10007 Re: United States v. Maxwell, No. 20 Cr. 330 Dear Judge Nathan: Smith Villazor LLF. New York, New York 10019 www.smithvillazor.com Patrick J. Smith may file a motion to quash the subpoena on or before Friday, November 19, 2021. The motion should not repeat arguments made in the Government's motion to quash, which is due on Thursday, November 18, 2021. The Defense shall respond to both motions on or before Monday, November 22, 2021. This memo endorsement is filed temporarily under seal to allow the parties to propose redactions. Any redactions to this letter and the Defendant's motion must be filed on the docket by November 21, 2021. SO ORDERED. We represen the independent admircstrator of the Epstein Victims' Compensation Pr

1p
DOJ Data Set 10OtherUnknown

EFTA01414705

3p
DOJ Data Set 10OtherUnknown

EFTA01434396

6p
Dept. of JusticeAug 22, 2017

15 July 7 2016 - July 17 2016 working progress_Redacted.pdf

Kristen M. Simkins From: Sent: To: Cc: Subject: Irons, Janet < Tuesday, July 12, 2016 10:47 AM Richard C. Smith     Hello Warden Smith,     mother is anxious to hear the results of your inquiry into her daughter's health.   I'd be grateful if you could  email or call me at your earliest convenience.  I'm free today after 2 p.m.  Alternatively, we could meet after the Prison  Board of Inspectors Meeting this coming Thursday.    Best wishes,    Janet Irons    1 Kristen M. Simkins From: Sent:

1196p

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.