Skip to main content
Skip to content
Case File
efta-02376654DOJ Data Set 11Other

EFTA02376654

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02376654
Pages
1
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Daphne Wallace Sent: Wednesday, July 1, 2015 8:29 PM To: Jeffrey Epstein Cc: ann rodriquez; Rich Kahn Subject: Pre-fab Building bids - July 1, 2015 Greetings Sir, I contacted J=redian to confirm that the scope of work they submitted for the structural=steel buildings they designed for the RO Garage roof and the proposed New =echanical Building were suitable for the 80 by 80 building that you have r=quested bids for. John advised that an 80 foot wide building would not fi= on the sight - we presumed you are proposing to place this building where=the current Buck Steel building sits - due to space restrictions. The buil=ing they designed has a maximum width of 74 feet. To increase to 80 =eet you would have to excavate into the driveway leading to the Iguana cro=sing and to your Main compound driveway. They avoided this area beca=se of the electrical and other underground infrastructure that runs under =hat driveway. Do you wish for me to proceed, as you requested, with obtain=ng quotes for an 80 by 80, or do you wish to reduce to 74 by 80? Respectfu=ly, Daphne 1 EFTA_R1_01386481 EFTA02376654

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2376654

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.