Case File
efta-02397249DOJ Data Set 11OtherEFTA02397249
Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02397249
Pages
4
Persons
0
Integrity
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
From:
Ann Rodriquez
Sent:
Monday, April 13, 2015 6:47 PM
To:
jeffrey E.
Subject:
Fwd: Barge List
Ann R.
Begin forwarded m=ssage:
From: Bill Hague &=t
<=>Date: April 13, 2015 at 2:29:56 PM AST
To: ann rodri uez
Cc: Rich Kahn
, Gene Kral
u
: e: G=rge Us
Ok.=nbsp;
Da hne Wallace
1
Rudders must be rem=ved and the lower portion must be renewed to proper dimension. They are wor= to the
point of failure and vibrate badly.
2=
We bought pumps and pulleys we can install but I a= referencing the gear in the aft compartment that is the
hydraulic actuator=and linkage for the rudders
3
&nb=p;The cylinders were damaged at sea due to improper installation and subseq=ent damage from a broken
fitting. The ramp was secured with a safety strap b=t still pulled the top sealing portion out of the cylinder.
The fit o= the mounts needs to be remedied at this time. The cylinders work now but a=e not repairable.
Evaluation while being removed to correct and improve the=mounting is necessary at a minimum.
4
=div> The exhaust was assembled without funding to get the barge=off the dick at the last haulout. It is not
properly assembled or supports n=r is it insulated.
6
=e have new ones but need new mounting hoses
And must be done out o= the water
7
Bearings must be pur=hased. I think SBDD has them
EFTA_R1_01430244
EFTA02397249
8
&n=sp; Inspection and new sacrificial sinks installed.
9
SBDD should provide this but it can be discussed.&=bsp;
10
Machine shop work&n=sp;
SBDD
12
This s=ould be done at the same time the tank is cleaned.
13
Watertight compartments forward would need to be d=watered if breached.
There is no ability to do so at=this time except fit the first two compartments that are joins as one due t= a hole
in the bulkhead.
16
=The gauges for oil and temp and rpm are not accurate. One over temperature a=arm is not working as well.
18
&nb=p; Parts.... As needed by inspection.
</=iv>
Sent from my iPhone
> wrote:
Hey Boscoe,
Please see questions ----?
I need a clear understanding of the=listed items, What parts should we purchase and What can be done
i= house.
1. Rudders.
What should be done? =
2. Steering Gear.
Did we buy the parts for this?
3. Hydraulic Cy=inders.
What need to be done?
4. Exhaust system:
What are the=issues?
5. Engine Mounts and alignment.
(Ok!)
6. Stuffing boxes/=eals. Install new units:
Should we buy the new units?
7. Cutlass be=rings.
Do we need to purchase?
8. Engine Cooling Grid Coolers and Z=nks.
What need to be done?
9. Bottom Paint and Barrier Coat/ Hull Z=nks.
Should we purchase?
10. Engine and marine gear control bracke= work.
Do we need to purchase?
2
EFTA_R1_01430245
EFTA02397250
11. Fuel tank clean out. Port and s=arboard.
(Ok!)
12. Starboard deck fuel fill adapter replacement.
Should we replace or fix?
13. Bilge pumping system forward compartme=ts.
What about the forward compartments?
14. Repair existing 24 vo=t alternator and add a second one to port motor.
Should we purchase?
<=r>1.S. Inspect and size all hydraulic lines and fittings as needed. (Ok!)
17. Install engine room lighting.
(Ok!)
18. Tune and s=rvice both engines and marine gear. ----- Any parts need?
19. Clea= and paint engine room.
(Ok!)
DISCLAIMER: The information contained in this e-mail may be privileged,=onfidential, and protected
from disclosure. If you are not the intended rec=pient, you are hereby notified that any dissemination, distribution or
dupl=cation of this communication is strictly prohibited. If you have received t=is communication in error, please notify
the sender immediately
On Monday, April 13, 2015 12:22 PM, Boscoe
wrote:
The following is the list I discussed with Gene at Subbase=Drydock today 4/13/2015.
He is familiar with it and is now submi=ted for your review.
l=spect and Repair the following;
1. Rudders.
2. Steering Gear.
3.=Hydraulic Cylinders.
4. Exhaust system
5. Engine Mounts and alignmen=
6. Stuffing boxes/seals.. Install new units
7. Cutlass bearin=s
8. Engine Cooling Grid Coolers and Zinks
9. Bottom Paint and Barrie= Coat/ Hull Zinks
10. Engine and marine gear control bracket work.
1=. Fuel tank clean out. Port and starboard
12. Starboard deck fuel fill a=apter replacement
13. Bilge pumping system forward compartments
14. R=pair existing 24 volt alternator and add a second one to port motor.
15= Inspect and size all hydraulic lines and fittings as needed.
16. Engin= and marine gear instruments in control tower
17. Install engine room li=hting
18. Tune and service both engines and marine gear.
19. Clean a=d paint engine room.
Timing of work
I have been told&n=sp; this haul out must be done in late April or May as there is scheduled a=d
contracted work reported for this facility during June, July and August. <=r>
Please, respond with any questions you may have.
3
EFTA_R1_01430246
EFTA02397251
=/div>
4
EFTA_R1_01430247
EFTA02397252
Technical Artifacts (5)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
2397249Phone
2397250Phone
2397251Phone
2397252Wire Ref
referencingRelated Documents (6)
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.