Skip to main content
Skip to content
Case File
efta-02397249DOJ Data Set 11Other

EFTA02397249

Date
Unknown
Source
DOJ Data Set 11
Reference
efta-02397249
Pages
4
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Ann Rodriquez Sent: Monday, April 13, 2015 6:47 PM To: jeffrey E. Subject: Fwd: Barge List Ann R. Begin forwarded m=ssage: From: Bill Hague &=t <=>Date: April 13, 2015 at 2:29:56 PM AST To: ann rodri uez Cc: Rich Kahn , Gene Kral u : e: G=rge Us Ok.=nbsp; Da hne Wallace 1 Rudders must be rem=ved and the lower portion must be renewed to proper dimension. They are wor= to the point of failure and vibrate badly. 2= We bought pumps and pulleys we can install but I a= referencing the gear in the aft compartment that is the hydraulic actuator=and linkage for the rudders 3 &nb=p;The cylinders were damaged at sea due to improper installation and subseq=ent damage from a broken fitting. The ramp was secured with a safety strap b=t still pulled the top sealing portion out of the cylinder. The fit o= the mounts needs to be remedied at this time. The cylinders work now but a=e not repairable. Evaluation while being removed to correct and improve the=mounting is necessary at a minimum. 4 =div> The exhaust was assembled without funding to get the barge=off the dick at the last haulout. It is not properly assembled or supports n=r is it insulated. 6 =e have new ones but need new mounting hoses And must be done out o= the water 7 Bearings must be pur=hased. I think SBDD has them EFTA_R1_01430244 EFTA02397249 8 &n=sp; Inspection and new sacrificial sinks installed. 9 SBDD should provide this but it can be discussed.&=bsp; 10 Machine shop work&n=sp; SBDD 12 This s=ould be done at the same time the tank is cleaned. 13 Watertight compartments forward would need to be d=watered if breached. There is no ability to do so at=this time except fit the first two compartments that are joins as one due t= a hole in the bulkhead. 16 =The gauges for oil and temp and rpm are not accurate. One over temperature a=arm is not working as well. 18 &nb=p; Parts.... As needed by inspection. </=iv> Sent from my iPhone > wrote: Hey Boscoe, Please see questions ----? I need a clear understanding of the=listed items, What parts should we purchase and What can be done i= house. 1. Rudders. What should be done? = 2. Steering Gear. Did we buy the parts for this? 3. Hydraulic Cy=inders. What need to be done? 4. Exhaust system: What are the=issues? 5. Engine Mounts and alignment. (Ok!) 6. Stuffing boxes/=eals. Install new units: Should we buy the new units? 7. Cutlass be=rings. Do we need to purchase? 8. Engine Cooling Grid Coolers and Z=nks. What need to be done? 9. Bottom Paint and Barrier Coat/ Hull Z=nks. Should we purchase? 10. Engine and marine gear control bracke= work. Do we need to purchase? 2 EFTA_R1_01430245 EFTA02397250 11. Fuel tank clean out. Port and s=arboard. (Ok!) 12. Starboard deck fuel fill adapter replacement. Should we replace or fix? 13. Bilge pumping system forward compartme=ts. What about the forward compartments? 14. Repair existing 24 vo=t alternator and add a second one to port motor. Should we purchase? <=r>1.S. Inspect and size all hydraulic lines and fittings as needed. (Ok!) 17. Install engine room lighting. (Ok!) 18. Tune and s=rvice both engines and marine gear. ----- Any parts need? 19. Clea= and paint engine room. (Ok!) DISCLAIMER: The information contained in this e-mail may be privileged,=onfidential, and protected from disclosure. If you are not the intended rec=pient, you are hereby notified that any dissemination, distribution or dupl=cation of this communication is strictly prohibited. If you have received t=is communication in error, please notify the sender immediately On Monday, April 13, 2015 12:22 PM, Boscoe wrote: The following is the list I discussed with Gene at Subbase=Drydock today 4/13/2015. He is familiar with it and is now submi=ted for your review. l=spect and Repair the following; 1. Rudders. 2. Steering Gear. 3.=Hydraulic Cylinders. 4. Exhaust system 5. Engine Mounts and alignmen= 6. Stuffing boxes/seals.. Install new units 7. Cutlass bearin=s 8. Engine Cooling Grid Coolers and Zinks 9. Bottom Paint and Barrie= Coat/ Hull Zinks 10. Engine and marine gear control bracket work. 1=. Fuel tank clean out. Port and starboard 12. Starboard deck fuel fill a=apter replacement 13. Bilge pumping system forward compartments 14. R=pair existing 24 volt alternator and add a second one to port motor. 15= Inspect and size all hydraulic lines and fittings as needed. 16. Engin= and marine gear instruments in control tower 17. Install engine room li=hting 18. Tune and service both engines and marine gear. 19. Clean a=d paint engine room. Timing of work I have been told&n=sp; this haul out must be done in late April or May as there is scheduled a=d contracted work reported for this facility during June, July and August. <=r> Please, respond with any questions you may have. 3 EFTA_R1_01430246 EFTA02397251 =/div> 4 EFTA_R1_01430247 EFTA02397252

Technical Artifacts (5)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone2397249
Phone2397250
Phone2397251
Phone2397252
Wire Refreferencing

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.