Skip to main content
Skip to content
Case File
efta-efta01199326DOJ Data Set 9Other

From: Ann Rodriquez •

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01199326
Pages
4
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
From: Ann Rodriquez • To: "jeffrey E." <[email protected]> Cc: Rich Kahn , Daphne Wallace Subject: Fwd: Big N Date: Fri, 10 Jul 2015 15:10:11 +0000 Attachments: LSJ_ Est_ 776.pdf Inline-Images: tank.jpg; tank_2.jpg I'm going down to Subbase Dry Dock to take pictures and talk to Gene after my hearing at Labor Dept. Ann R. Begin forwarded message: From: Ann Rodriquez Date: July 10, 2015 at 10:48:53 AM AST To: "jeffrey E." <jeevacation@grrtn> Cc: Rich Kahn >, Daphne Wallace Subject: Fwd: Big N Ann R. Begin forwarded message: From: gene kral Date: July 10, 2015 at 10:26:59 A\1 AST To: Ann Rodriquez Cc: Debra Lowry Subject: Big N Reply-To: gene kral 1.111Mla Good Morning Anna- I wanted to give you and update on the progress of the Big N. This morning we were ready to lift and install the port engine. Bosco has informed us that the port engine is not ready, he has a few more things he needs to address. I know you were looking into replacing the gear boxes but have had no success in finding new ones that are similar. I am writing this email so we are all on the same page as far as a completion date. The majority of our work hinges on having those engines installed. The exhaust system on each engine has to be finished, but in order for us to complete this we have to have the engines in. The same goes for the new fuel lines and all the electrical components that run to the engines. I know we discussed the end of this month/beginning of next month but each day that we wait for the engines to be completed it delays us from our target date. A few issues have been discovered while working on Big N. 1) The shaft logs on both sides are corroded beyond repair. We anticipated that we might have this problem so it was factored into the quotation. 2) The port stern quarter looks like it might have hit a dock which has separated some of the stringers on the inside. It is repairable and I told you we would repair it under the quotation. 3) The fuel fill cover on both sides are compromised and need to be replaced. They are not sealing properly and over the course of time have allowed salt water to seep in and contaminate the fuel tanks. Which leads me to your biggest issue we have discovered while working in the rudder room where the fuel tanks are located. The bottoms of the fuel tanks and several other areas are severely corroded. It is my recommendation that these tanks be replaced. The only way for a proper repair are to EFTA01199326 replace both tanks. The original tanks got you 40 years so I don't see why the new ones we fabricate cant get the same amount of usage out of them. Attached our a couple of pictures of the corrosion and an estimate to remove and replace both tanks. Please call or email with any questions... Gene Kral Sr. Subbase Drydock, Inc. Parcel 162. Subbase EFTA01199327 EFTA01199328 EFTA01199329

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.