Skip to main content
Skip to content
Case File
efta-efta00584518DOJ Data Set 9Other

JE Punch List —Sept 3„ 2012 Directive Updates

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00584518
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —Sept 3„ 2012 Directive Updates 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - New seats for gators and pro gators — ordered, 2 on back order - Remaining 2 Queen Seats will be delivered to Tropical for shipping by 9/14 - Power Steering Module for Polaris Bike to be ordered — 9/4 3. Computers/Phones - 25 inch I Mac Clean Up — for Captain's Office — COMPLETE pick up 9/4 4. Five Palms - Exterior Door Shutters — due on site for installation - 9/6 - Painting - outside to be completed via JE direction - Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, work begins 9/7 - Picture Frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — another section fallen off — need to review this application - Piano — retune in October - Transformer Shed — Painting — COMPLETE. Require roof and door construction work to begin 9/4 - Fiber Work — Awaiting date for Jermaine to be on site with repair crew 5. Grotto - Mattress cover — JE approved buying fabric, making cover locally - Genset wiring — COMPLETE — Electronic Remote Starter, auto start from Kite House - Danny ordering online 8/30 6. Berm/Too of Hill - Hydroseed outside — will need to review progress 7. Triangle - - Must design triangle — awaiting JE direction - Weed and Hyroseed entire area 8. Flagpole Pool Cabana - - Furniture — desk from Paris ready to ship early September - Sue 9. Floating Dock - Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details 10. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — at Tropical FL 8/31 13. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at Subbase — work began 8/28 — due to splash 9/4, in house work to begin - Little C — engine at Offshore 8/29 — installation complete by 9/4 14. Timers - Review installing timers on air conditioners, irrigation water systems, and lights - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees - Irrigation — depending on rainfall 15. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach — Danny will begin on 9/10, completion by 9/21 EFTA00584518 16. Transient Surge Protection — JE approved to purchase — will order 9/4 17. Landscaping - Pop's Garden — need deer fencing, or some other method of protection, review of shade cloth? — Peter by 9/7 - Cut grass, acacia — owner's drive, blue beach, gym — work in progress - Peter to clean the sides of the road by 9/7 - Black under pads used at heli pad to be installed at top of bike path at Main Compound - Installation of additional soil and sea grape for engineering area - Hydroseed all pull box areas & engineering - Continue to line all roads with stones 18. Roads - - Priority is Gym road grading —Jules to add loose top material 9/4 - Jules to work on road to pebble beach — start 9/4 - General regrading of roads -ongoing 19. Library - Lights on bookshelves need attention — Danny will begin on 9/4, completion by 9/6 20. New Employee Bathrooms 21. Gym - New punching bag — on site — installation after JE visit - Subwoofer — torn/blown, Larry ordered part, shipped to NYC - estimate install by Sept 7-10 (Scott's update as of 8/30) - Windows in the ballet room need repair to both cranks/panes — completed by 9/5 22. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood required 23. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response 24. Hangar - Fuel Containment Pad — draft approved with drainage incorporated — surveyor on site week of 8/27to complete survey, will forward to the architect so he can complete the plan. (Cecile's update as of 8/30) 25. Main compound - Wind doors to the east are inoperable — change hinges - on site — completed by 9/6 - Lights — as of date all are up and running — there are still some missing bulbs, which will be addressed as time allows - AC — Above Great room, reroute drain from roof line — ARC on site - 9/4 - Projector Screen — new limit switches and motor required — Danny will review 9/4 26. New waste bins — COMPLETE, signs have been ordered, completion due 9/14 27. Yellow Nap House — demolish by Peter with the trackhoe by 9/5 28. Blue Nap House — replace and repair shingles 29. Steel shed — the vendor to confirm to Carlos if they can travel to LSJ to erect the shed, and if they can complete the erection within 3 weeks — 9/6 30. Equipment to be Purchased — (1) light generator, (2) arms with lights to be hard wired , (1) skid steer (ordered ), (1) John Deere box and blade, (1) man-lift, (1) golf cart, (1) dump truck 31. LSJ Mats — for all locations to be ordered 9/4 32. Engineering — Old Building roof to be painted start — 9/4 33. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ - to start 9/10 34. Solar Lights — installation to continue, placement via 1E's direction EFTA00584519

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.