JE Punch List —July 27. 2012 Directive Updates 1. Clean Up - make as many barge runs as necessary - Top of Desal plant - Engineering - Cleaning the shops — ongoing 2. Equipment and Vehicles - Sell equipment - Bikes should be ready to be sold — no sales without JE approval — bike sale list forwarded to Brice 7/24 - will be forwarded for JE approval - No machinery off the island unless approved - Buy new Kawasaki bikes and mules — (5) 2012 Kawasaki 750 EPS and (2) 2012 Kawasaki Mule 4010 purchased — wire sent 7/26 - Kawasaki parts order submitted twice — awaiting direction - Remove all concrete trucks and cement hopper no later than 7/27 - Cement hopper scheduled to be transported to the Heavy Materials - St. John yard for storage - storage is free — crane/tractor/low boy rental $4,300 — pending Boyson reschedule and JE approval — Boyson unable to provide rescheduling information until after 7/30 - Concrete trucks — transported to Heavy Materials STT 7/24 — storage free — transport $300 — per Brice approved by JE - COMPLETE 3. Computers - Buy new computers — 2 Macs Desktops & 1 Laptop — Captains' Office - ordered 4. Five Palms Internet/Phone Switch installed — broken fiber discovered 7/24 — Danny repaired 1 of 2 — replacement termination tips arrived 7/27 — Danny has them in his possession - Phone set up left of desk — switch installed 7/20 - COMPLETE - Wireless inside only — as of date 7/10 via JE — installed 7/24 - COMPLETE - Computer — as of date 7/10 not required via JE - Exterior Door Shutters — estimate forwarded to JE 7/12 - $2,865.00 - awaiting direction - Painting - outside to be completed via JE direction - Inside to be completed via JE direction — Ion - Tapestry Molding for Ceiling — Ion - Furniture — outside furniture ordered — sailing 7/27 - EDA to STT 7/31 - Piano Bench — mounted 7/18 - COMPLETE - Piano — schedule to re-tune week of 8/15 - Picture Frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — liquid nails — will cover entire panel with glue when the next one falls off - Transformer Protection Wall — should be built - work to start 7/30 - Floor Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will replace the piping 5. Grotto - Furniture — put back in grotto - Curtains — more curtains ordered — cream for the bed at the base of the grotto — expected to arrive to Zorro to take to LSJ 7/31 - Genset wiring — COMPLETE - Danny reviewing auto start from Kite House — need to purchase part from Electronics Unlimited — out of stock — Danny to contact vendor for status on restock 6. Berm/Top of Hill - Stone threshold needs total re-do — must be level and straight — commenced 7/27 - Boulders — Jules to finish boulder work — once stone threshold completed - Electrical — Low voltage transformer in place - placement & connection of lights - COMPLETE EFTA00584522 - Main transformer on site — installed 7/19 - COMPLETE 7. Engineering/Maintenance Yard - Steel Shed concrete pad — COMPLETE - Metal Sheets - on old building replaced — COMPLETE - Power sanding/rust removal complete - painting in progress - Engineering Storage & Shelving — concrete wall repaired 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s) to travel to Josephine's nursery (Coral Bay) — trip cancelled - Engineering water boundary — Jules - COMPLETE 8. Triangle - - Peter transplanted 3 palms from engineering per JE directive 7/26 - COMPLETE 9. Flagpole Pool Cabana - - Furniture — investigate new desk, new furniture more like Pool Cabana PBI - relocate orange sofa to Media Room - Check water pressure in shower — Danny discovered the pressure equalizer tank was not pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers -ordered - presently on backorder - Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles - COMPLETE - Dock box top to be resurfaced - Dock floors — staining needs completion — COMPLETE - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Wooden Bumpers — to cover concrete stripping — COMPLETE - Painting — Railing, Cross Brackets & Robe Hooks - COMPLETE 11. Entry Tree Lights — Lights on site, electrical installation - COMPLETE 12. Solutions for Generators — Soundproofing Installation — back wall and door — COMPLETE —JE is concerned may not be adequate for deep sound penetration 13. Tiki — Shields left Papua 7/24 — EDA in FL 7/29 — Lund & Pullara will clear and transport to Tropical 14. Kite House — relocation of outside furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — will go to Subbase Drydock after 8/7 19. Timers - Review installing timers on air conditioners, irrigation water systems, and lights - Set all air conditioning to 85 degrees (no need to keep anything cooler) - No irrigation week of 7/23 20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach EFTA00584523 21. Transient Surge Protection — will review and forward estimate ASAP - Danny 22. Ice Maker — on LSJ 7/25 23. Landscaping - Soil material on site - soil removed from beds 7/16 — area replanted - COMPLETE - Finish sundial corner (trees, stones, hydro-seed) — more trees transplanted, per JE - COMPLETE - Clean up areas marked in paint - COMPLETE - Prepared banana area for pineapples 7/24 -100 pineapples picked up and planted 7/26 - COMPLETE - Plantings - removed the plantings that are anywhere near the bottle palms, per JE - COMPLETE 24. Solar lights — ordered - place every 30 feet — EDA on STT 7/28 25. Roads — grade - Jules work continues 26. Library - Lights on bookshelves need attention — Danny to repair - Temperature — STABLE - Repair hanging wooden louver — COMPLETE 27. Main hill — Asphalt path — pour asphalt ends in concrete — top and bottom have been formed, concrete poured at top and bottom — stones placed at bottom and top 7/25 - COMPLETE 28. New Employee Bathrooms 29. Gym - New punching bag — arrived at 7P, — will come down on the next plane trip - Wiring — balance cables on site - final tidy up 7/20 — COMPLETE - Audio cables purchased — installed 7/20 — COMPLETE - Yoga room air does not work — Danny replaced the batteries - COMPLETE 30. Benches 31. Danny Vicars — boat driving lessons in progress 32. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood required 33. LSJ Mooring — Darren will forward to Army Corp for final approval — 7/12 34. AYH Dock — re-sanding/staining of Nanna dock - COMPLETE 35. Main Compound Cistern — Demo work complete - confirmed multi leaks - repair work required 36 Hangar - Jermaine to redo internet at hangar — forward quote for rack enclosure 7/24 — awaiting approval - Fuel Containment Pad — draft approved with drainage incorporated, waiting for updated plan 37. Woodshop Tunnel — floor needs to epoxy — clearing area 38. Master bedroom area — add many lights in master bedroom planter — Danny 7/26 — COMPLETE 39. Little C — new engine has a blown head — Fred (Offshore Marine) came out 7/27 — two holes in the new engine block — one is above the oil filter and the other is above the shift assembly — Fred to contact Brice EFTA00584524

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.