JE Punch List —July 6.2012 Directives 1. Clean up - - Shed and its Workshops - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - Buy new Kawasaki bikes and mules 3. Computers - Buy new computers 4. Five Palms - Internet— Danny and Little Danny terminating fiber — completed and light tested 6/29 - Jermaine will confirm internet and phones after the CISCO 3560 switch is installed — switch ordered 7/5 — EDA at 71st on 7/11 - Exterior Door Shutters — removable option required - hurricanes - Painting - outside to be completed via JE direction - inside to be completed via JE direction - Furniture — Sofa — leather sample selected by JE, will review when next on site Outside furniture ordered - Tapestry Molding for Ceiling — Ion - Transformer building - Building 5/31, 5/25 - final electrical hookup 6/8 — temporarily powered by generator - Fire pit — Burner and plate on site — starter is missing have contacted company new one to be sent - Cabinets — add push latches on doors — still to be installed 5. Grotto - Floor resin white — due to no water/cleaning issue - review Spanish Tile option, some on site - Genset wiring — scheduling to be determined 6. Berm/Top of Hill - Paint — will move forward when dry - Entry rocks - COMPLETE - Wood boundary —12ft boxes around trees after shield installation - Electrical - Panel Low Lighting to be completed — waiting for transformer 7. Engineering/Maintenance Yard - Metal Sheets - on old building will be replaced during upcoming visit - Engineering storage & shelving — work to start when carpenters available 8. Triangle — landscaping direction required from JE 9. Flagpole Pool Cabana - - Furniture —glass desk from NYC set up 6/29 -JE to review - relocation of existing desk to the Chillax room - JE to review 10. Floating dock - Jet ski dock - COMPLETE - Wooden fenders — COMPLETE - Jet ski fenders — ordered due on site 7/6 — Carlos to complete installation 7/6 - Table/Dock Box — table/seat top last coat of sealer applied 6/28 - draw baskets, doors & hinges all on site - draw sliders/hardware at 71st Rich B is forwarding — on site 7/2 - completion expected 7/6 11. Entry Tree Lights — COMPLETE 12. Solutions for Generators — wall built, soundproofing on LSJ 7/6 13. Tiki — Darren is contacting the vendor regarding the shields — require update EFTA00584525 14. Kite House — review of wooden outside furniture - Sarah 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - requires blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G (Fat Cat) - refurbish - Midnight Express — in water - Lady K - sell - Big N - sell - Calypso — sold 19. Timers— review installing timers on air conditioners, irrigation water systems, and lights 20. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 22. Wind Door — wind door on kitchen side needs openers and wind door stops — Brice purchasing in NM did not happen 23. Landscaping—Josephine to visit and organize garden 24. Solar lights - Brice to order 500 landscape lights — schedule for solar lights - should be placed every 30 feet - order 25. Roads — grade - Jules work continues 26. Library - Lights on bookshelves need attention — will review with Danny - Temperature - STABLE 27. Main hill — Asphalt path — edge and end asphalt properly - proposed suggestion forwarded from Monique 28. Master Suite - Large master bed planting - Put self-closing hinges on the master bedroom door to the outside - COMPLETE 29. New Employee Bathrooms 30. ayLn - Add new doors in yoga and ballet room closets — COMPLETE - New punching bag — due 7/9 - Clean up electronics/stereo - Jermaine 31. Benches 32. Office Pavilion - East window in Sarah's office is rusted outside - COMPLETE 33. Danny Vicars — schedule boat driving lessons 34. Heli Pad — fix and replace lighting — COMPLETE 7/5 35. Hangar - Jermaine to redo internet at hangar — quotes expected 7/6 - Hangar pad to be built EFTA00584526

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.