Skip to main content
Skip to content
Case File
efta-efta00724787DOJ Data Set 9Other

Updated 6/15 10

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00724787
Pages
3
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Updated 6/15 10 Status of projects and outstanding issues for Jeffrey underlined LIBRARY Status interior 1.interiors complete by construction Outstanding issues 1.ceilina treatment 2.cabinet finishes 3.floor finishes Status exterior 1.courtyard paving underway complete by the July 31 2.irragation main line underway complete by July 15 Outstanding issues 1.landscaoe plans a.plants b.irragatiion plans c.liahtina 2.Igala has trees tagged ready for delivery as soon as barge is ready MASTER SUITE Status interior 1.const under way ,subject to decisions being made should finish by Oct 31 Outstanding issues 1.steam bench 2.out side shower 3.lites over bed 4.lighting in bedroom 5.electrical in bath area 6.tub deck and surround 7.selection of wood floor 8.sourcing thassos slabs 9.powderroom vanity plan 10.shop drawings for stone Status exterior 1.wall under way, complete by Aug 31 EFTA00724787 Outstanding issues 1.landscape plans..litinq irr. KITCHEN Status 1.assume we get permit by July 1 should be complete by Nov.31 Outstanding issues 1.kitchen design 2.stair and wall design to master LAUNDRY 1.assume we get permit July 1 should complete by Oct 31 COTTAGES 1.const underway should complete by Sept 30 Outstanding issues 1.shower design MAIN HOUSE REMODEL Status no estimate to compleation til program complete 1.courtyard side plan final,proceeding 2.roofing proceeding Outstanding issues 1.north side program MECHINICAL ELECTRICAL Status under way should complete by Sept 30 MECHANICAL DESAL Status under way should complete by Nov 30 POOL/THEATER 1.Gensler allow three months for plans 2.two months for permits Nov 30 3.pool by Mar 31 4. theater by Jun 30 DOCK HOUSE/FLOATING DOCK HANGAR EFTA00724788 CZM Status submitting by July 1 1.plans go in the 20th 2.assume approval by Sept.30 3.const plans by Nov.31 4.permits by Jan.31 5.pool by jun.30 6.cottage by Aug.31 7.music room by Jun.30 8.tennis by April 30 EFTA00724789

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.