Skip to main content
Skip to content
Case File
efta-efta00726977DOJ Data Set 9Other

Fee Proposal for

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00726977
Pages
1
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Fee Proposal for Architectural Services. Schematic Design of Five Projects for CZM Little SI. James Prepared for Gary Kerney Task it Task Description Remarks .c a c 0 7, v t 2 ,2 .c co c 0 7 v le C C a o cy, 8 CD g 6' a m _ V C ei rc 0 o E i. 3 " 5 .— m 1-• Total Professional Time Mrs) Net Totals 1.00 Understanding the Program. view and reconfirm the existing layout and basic dimensions 4 4 8.00 $ 1 800 00 2.00 Prepare conceptual layout scheme for the project Prepare two Alternative Conceptual 6 Design responses for Owners review. comment and approval. 5 8 16 16 51.00 $ 5.625.00 3.00 Prepare Presentation Document for CZM Review and Understanding Based on the selected alternative. 6 prepare Presentation Documents suitable for Preliminary CZM Design 5 8 16 32 67.00 $ 6.778.85 Approval. Respond to questions and or comments by Building Official as required. 4.00 Prepare Construction Not Included in this Phase 0 - - 0 Documents 5.00 Structural Design Structural Design work to be prepared by Engineer Paul Ferreras. PE and billed drec0y to LSJ 4.00 Printing and Reproduction Prepare normal printing and reproduction of documents for Owner presentations and 5 sets for of assumed set size 4 sheets for submission to CZM - $ 150.00 5.00 Changes after issuance of Changes made after issuance of Design Approvals Owner's or Owner's Representative's approvals shall be billed for as additional service at Architects standard billing rates. 6.00 Permit Fees Permit Fees are the responsiiity of the Owner and shall be paid for by the Owner. At the point where the Documents are ready for submittal. the Architect shall notify the Owner of the amount of the Permit Fees and the Owner shall provide the Architect with a check payable to the Permitting Agency in the proper amount 7.00 Expected Baseline Fee Requirement with presentation quality documentation for Schematic Level Design Effort for CZM for typical of 5 projects 16 14 16 32 48 126.00 $ 14.353.85 8.00 Project Name Adjustment for Level of Effort and Complexity of Individual Project 8.01 Pool and Pool Building 100% $ 14.353.85 8.02 Guest Cottage 100% $ 14.353.85 8.03 Piano Room 80% $ 11.483.08 8.04 ATV Building 70% $ 10.047.69 8.05 Tennis Court Complex 50% $ 7.176.92 9.00 Total S 57.415.38 10.00 Schedule: We anticipate that this design effort will take approximately 5 weeks from acceptance of this proposal. 11.00 Payments to the Architect shall b a as follows: A deposit of 33113% of the proposal amount shall be paid upon acceptance of the proposal. An additional 33 1,3% shall be paid upon acceptance of the approved Each of 3 $ 19.138.46 Concept Line Drawings. The final remaining 33 1i3% shall be paid upon payments delivery of the final drawings to LSJ. 12.00 This will require several visits to the site for members of our team. We anticipate having access to LSJ Ferry Boat transportation as required. Prepared by The deJongh Group. PC Architects Planners Fee Proposal Schematic Design CZM Revised Submittal 1.2 April 26.2010 EFTA00726977

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.