Skip to main content
Skip to content
Case File
efta-efta00726978DOJ Data Set 9Other

Fee Proposal for

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00726978
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Fee Proposal for Architectural Services. Schematic Design of Four Projects for CZM Review and Approval Little St. James Prepared for Gary Kemey Task # Task Description Remarks .0 0) C -o, ", m v t 2 cc .0 CA c C 0 -o, 0 "' '0 = v —) 2 TD = O x O 0 0 7 ,... O o v c . 8 x O c.) co 3. 0 O -.E. E to c .2 85 Total Professional Time (Hrs) Net Totals 1.00 Understanding the Program. view and reconfirm the existing layout and basic dimensions Functional Space Program to include New Kitchen Layout. Dining Area. New Pantry and Gallery Extension. and New Laundry Facility along with those spaces and features which may be affected by the adjustments andfor work required by the above. 6 6 12.00 5 2.700.00 2.00 Prepare (2) conceptual layout schemes for the project Prepare two Alternative Conceptual Design responses for Owners review, comment and approval. 6 6 # 8 16 16 52.00 5 5.825.00 3.00 Prepare Presentation Based on the selected alternative. 6 6 # 8 16 40 76.00 5 7.555.77 Document for CZM Review and Understanding prepare Presentation Documents suitable for Preliminary CZM Design Approval. Respond to questions and or comments by Building Official as required. 4.00 Prepare Construction Documents Based on the selected alternative. prepare Construction Documents suitable for permitting CZM and Building Pertmits. Respond to questions and or comments by Building Official as required. 0 # # tt 0 5 5.00 Structural Design Structural Design work to be prepared by Engineer Paul Ferreras. PE and billed directly to LSJ S 4.00 Printing and Reproduction Prepare normal printing and reproduction of documents for Owner presentations and 5 sets for of assumed set size 4 sheets for submission to CZM and Building Permits # 5 . :C.00 5.00 Changes after issuance of Design Approvals Changes made after issuance of Owner's or Owner's Representative's approvals shall be billed for as additional service at Architects standard billing rates. 6.00 Permit Fees Permit Fees are the responsiility of the Owner and shall be paid for by the Owner. At the point where the Documents are ready for submittal. the Architect shall notify the Owner of the amount of the Permit Fees and the Owner shall provide the Architect with a check payable to the Permitting Agency in the proper amount Prepared by The deJongh Group. PC Architects Planners Fee Proposal Schematic Design CZM Submittal 1 1 of 2 March 2. 2010 EFTA00726978 Fee Proposal for Architectural Services. Schematic Design of Four Projects for CZM Review and Approval Little St. James Prepared for Gary Kemey Task Task Description Remarks Robert deJongh Donna deJongh Kohl Judson Orlando Creque 0 Total Professional Net Totals Time (Hrs) 7.00 8.00 Payments to the Architect Expected Baseline Fee Requirement for Schematic Level Design Effort with presentation quality documentation for CZM for typical of 4 projects Project Name 9.00 Pool and Pool Building 10.00 Guest Cottage 11.00 Piano Room 12.00 AN Buildi 13.00 Total 14.00 Schedule Payments to the Architect shall b e as follows: A deposit of 33 1/3% of the proposal amount shall be paid upon acceptance of the proposal. An additional 33 113% shall be paid upon acceptance of the approved layout. The final remaining 33 1/3% shall be paid upon delivery of the final drawin•s We anticipate that this design effort will take approximately 5 weeks from acceptance of this proposal. 5.00 This will require several visits to the site for members of our team. We anticipate having access to boat trans •dation as wired. tt 18 18 0 16 32 56 140.00 S 16,230.77 Adjustment for Level of Effort and Complexity wog% S 16.230.77 100% S 16.230.77 80% S 12.984.62 70% 5 11.361.54 S 56,807.69 Prepared by The deJongh Group. PC Fee Proposal Schematic Design CZM Submittal 1 Architects Planners 2 of 2 March 2. 2010 EFTA00726979

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.