Master Suite Expansion
Preliminary Budget
LSJ Performed Work
June 5 , 2009
Subcontractor performed work
Total costs
Phase
Description
Qty
Unit
Price
Shipping
Sub
Material
Labor
Totals
General Conditions
$18,300.00
01-514
01-522
01-610
01-621
01-624
01-645
01-665
Phones
6
mos
$300.00
$0.00
$1,800.00
Temporary roof protection
1
tot
$2.000.00
$0.00
$2,000.00
Material Handling
4
wks
$600.00
$0.00
$2,400.00
Temporary Protection
1
tot
$1.500.00
$0.00
$1.500.00
Construction Cleaning
10
wks
$300.00
$0.00
$3.000.00
Expendables
4
mos
$900.00
$0.00
$3.600.00
Equipment Rental
4
mos
$1.000.00
$0.00
$4.000.00
)nspections/Teseng
$9.500.00
02-000
02-000
02-000
02-000
02-000
02-000
02-000
Krauss Manning - Subcontractor
$9,500.00
$9.500.00
Rebar inspections
Concrete placement inspections
Concrete test cylinders
Close in inspections
Electrical inspections
Plumbing inspections
02-005
Survey
SUB Mosley
1
total
$3,500.00
$0.00
$3.500.00
$3.500.00
02-071
Demolition
Remove / Dispose outdoor bathing
area
200
sf
$2.00
$400.00
Excavate for slab & foundation
1800
cy
$1.00
$3,600.00
Remove exterior walls
500
sf
$2.00
$1,000.00
Remove interior walls
Remove exisitng roof
1928
sf
$2.50
$4.820.00
Cap existing utilities
5
ea
$50.00
$250.00
Remove / Dispose all exterior
doors. windows and shutters
15
ea
$25.00
$375.00
Remove / Dispose existing terrace
rails and posts
'I
hrs
$15.00
$15.00
Remove / Dispose existing terrace
columns
19
ea
$20.00
$380.00
Remove / Dispose existing elevated
terrace beam
300
sf
$5.00
$1.500.00
Remove dumpster debris from island -
roof debris - conduit-doors-shutters
4
ea
$800.00
$3.200.00
$15,540.00
Shoring
400.00
01-150
Build wall (shoring) full length of
terrace
800
sf
$8.00
$6,400.00
02-281
Pest Control
Post control
$2.260.00
$2.260.00
Concrete
$25,028.00
03-120
03-130
03-173
Foundation labor
50
cy
$150.00
$0.00
$7,500.00
4000# concrete
50
cyd
$170.00
$0.00
$8,500.00
Slab on Grade - Labor
660
sf
$7.00
$0.00
$4,620.00
4000# concrete - slab
12
cyd
$170.00
$2.040.00
Rear wall/retaining labor
7.4
cyd
$150.00
$1,110.00
4000# concrete
7.4
cyd
$170.00
$1,258.00
'Masonry
$33,801.00
04-220
04-221
CMU Labor
1782
ea
$2.00
$0.00
CMU material
1782
ea
$3.50
$3,564.00
$6.237.00
EFTA00731166
04-450
04-451
Native Stone Veneer labor
1600
sft
$15.00
$0.00
$24,000.00
Native stone material
1600
sft
$0.00
$0.00
Metals
10,820.00
05-050
05-500
05-500
Metal Fastening
$3.000.00
$0.00
$2.500.00
$2.500.00
Lintels - Labor
$320.00
$0.00
$320.00
Lintels - Material
$5.500.00
$0.00
$5.500.00
Wood Framing
$105,350.00
06-050 Roof& Porch framing - Bluestone
$75,000.00
$75.000.00
06-100
06-130
06-200
06-202
Wood Railing
110
LF
$75.00
$0.00
roof t&G planking material
1910
sf
$10.00
$0.00
small closet & bath Ceiling install
120
sf
$10.00
$0.00
smallcloset & bath Ceiling materials
120
sf
$15.00
$0.00
$8.250.00
$19,100.00
$1.200.00
$1.800.00
06-400
c ectura woo wo
Running trim
45
If
$50.00
$2.250.00
Vanities
3
ea
$5.400.00
$0.00 $16.200.00
Roof
$84,744.00
07-240
07-413
Cornice
236
le
$50.00
$0.00 $11,800.00
Metal Roofing • Labor
515.00000
07-412 Roofing & insulation -mat & labor
$31,344.00
07-623 Copper Flashings • Labor
$5,900.00
07-623
07-900
Copper Fleshings - Material
Joint Sealants - material
$17,700.00
$3.000.00
Doors and Windows
$88,068.00
08-210
08-210
08-211
08-610
08-610
Shutters
8
ea
$2.041O0
$0.00
Doors exterior
8
ea
$4.083.00
$0.00
Int. Doors & Frames
3
ea
$2.232.00
$0.00
Windows - Material
1
tot
$1,200.00
Window Shutters
1
ea
$750.00
$0.00
$16.328.00
$32.664.00
$1.200.00
$6.696.00
$750.00
08-215 GlassSliding doors
2
ea
$3.500.00
$7.000.00
08-215 Role down shutters
2
ea
$5.000.00
$10.000.00
08-710 Finish Hardware - Labor
$2.500.00
$2.500.00
08-710 Finish Hardware - Material
1
total
$8.500.00
$0.00
Reuse existing shutter hardware
50.00
$8.500.00
$0.00
08-810 Mirror Glass -
54
sft
$45.00
$0.00
$2,430.00
Finishes
$50,776.00
09-200
09-300
09-300
09-300
09-300
09-500
cement coating
400
sft
$2.50
$0.00
Wall Stone Tile - Labor
1600
sft
$2.50
$0.00
Wall Stone Tile - Material
1600
sft
$2.50
Stone Stone tile Flooring • Labor
1172
sft
$2.50
$0.00
Stone stone tile Flooring Material
1172
sft
$2.50
Small under AC Wood Ceilings
1
tot
$2.500.00
Small under AC Wood Ceilings material
$6.500.00
$1,000.00
4000
$4.000.00
$2.930.00
$2.930.00
$2.500.00
$6.500.00
09-560
09.600
refinish exisitng Wood Flooring
488
sft
$7.00
$3,416.00
Granite Countertops/ tub slabs/steam
MOM
75
sft
$100.00
$0.00
$7,500.00
09-910
09-920
Exterior Painting
1
tot
$5.000.00
$0.00
$5.000.00
$5.000.00
Interior Painting
1
tot
$0.00
$3.500.00
$2.500.00
Specialties
Roburn medicine cabinets
2
ea
$650.00
$1,300.00
$15/3&00
Glass Shower
1
allow
$4.500.00
$0.00
$4,500.00
Glas steam room
1
allow
$5.600.00
$5,600.00
soap trays
4
ea
$317.00
$1.268.00
towel rods RTTB 24
6
ea
$275.00
$1.650.00
toilet paper holders
1
ea
$150.00
$150.00
rob hooks RTRH
6
ea
$95.00
$570.00
Toilet Accessories • Labor
14
ea
$50.00
$0.00
$700.00
Steam Room Equipment
$7.6151
13-130 Stoamist system 30
1
total
$7.615M0
$7.615.00
EFTA00731167
Plumbing
15-400 Piping, rough in
9
ea
$1,000.00
Sign off
Faucet sets Waterworks RTLS01
3
ea
$1.177.00
Lays - waterworks MRCU!
3
ea
$507.00
Shower bodyWaterworks RTSV58
2
ea
$827.00
Shower head RTSH72
2
ea
$587.00
Tub - Waterworks claw40
1
ea
$5.975.00
$32,280.00
$9.000.00
$2,500.00
$3.531.00
$1.521.00
$1.654.00
$1.174.00
$5.975.00
15-450
Tub filler Waterworks RTTU89
1
ea
$2.085.00
Propane instant hot water heater
1
ea
$1.000.00
Booster Water presure pump
1
ea
$1.300.00
Presure tank for booster
1
ea
$125.00
Toilets toto -TOWA20
3
ea
$805.00
$2.085.00
$1,000.00
$1,300.00
$125.00
$2.415.00
HVAC
$42,798.00
15-800
Remove and relocate exisitng AC
condensing units -
$2.600.00
I -air handler for the existing Master
Bedroom. ICP witxv and high efficiency
blower motor, cool only
$2.805.00
1-ICP 2 stage NC condensing unit for
'Master Bedroom" 18seer
$3.905.00
$2.600.00
$2.805.00
$3.905.00
1-air handler for the" Expanded
BathfSpearea
$2.805.00
1-ICP 2 stage NC condensing unit for
'Expanded BathfSpa* areal6 to18
seer
$5.385.00
2-ultra violet biocide units @ $525
and $835
$1.360.00
$2.805.00
$5.385.00
$1.360.00
2-EAC Honeywell air cleaners@
$940.00 and $1053.00
$1.993.00
2-overflow pans. auxiliary condensate
pumps, thermostats
$1,470.00
Dave Gott 1-NAC Labor
$20.475.00
$1.993.00
$1.470.00
$20.475.00
16-000
Electrical
New 200 amp service from kitchen
1
ea
$1,000.00
Overhead lights
6
ea
$200.00
Supply outside canister lights
4
ea
$200.00
Supply recessed lights
4
ea
$100.00
Vanity lights
6
ea
$250.00
switches,outlets GFIs, cable. miso.
1
total
$7.500.00
exhaust fan
1
ea
$300.00
Labor
150
hr
$32.23
$1,000.00
$1,200.00
$800.00
$400.00
$1,500.00
$7.500.00
$300.00
$4,834.50
$21,534.50
Sign off Glidden
1
sub
$t500.00
$1.500.00
16-700 Communications
1
allow
$2.500.00
$0.00
$2.500.00
Sub Total
$592,502.50 $275,046.00 $175,938.00 $141,518.50
Contingency. 5%
$29,625.13 $13,752.30
$8,796.90
$7,075.93
Total
$622,121.63 $288,798.30 $184,734.90 $148,594.43
$592,502.50
$29,625.13
$622,127.63
Landscaping not included
Furnishings not included
General Conditions does not include costs for Supervisors, Project Managers or Project
Assistants.
EFTA00731168
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.