Skip to main content
Skip to content
Case File
efta-efta00731169DOJ Data Set 9Other

Master Suite Budget Cover sheet

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00731169
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Master Suite Budget Cover sheet June 5 , 2009 Jeffrey: General Conditions Inspections/Testing Survey Demolition Shoring Pest Control Concrete Masonry Metals Wood Framing Architectural wood work Roof Doors and Windows Finishes Specialties Steam Room Equipment Plumbing HVAC Electrical Sub Total Contingency, 5% Total $18,300.00 $9,500.00 $3,500.00 $15,540.00 Based on using rock and concrete as backfill on other projects $6,400.00 $2,260.00 $25,028.00 LJS labor only $33,801.00 LJS labor only $10,820.00 $105,350.00 Plan shows metal patern railing - WOOD used $18,450.00 $84,744.00 GENSLER Specification not included - $88,068.00 $50,776.00 $15,738.00 All items self specified in back up $7,615.00 Self specified Steamist system 30 $32,280.00 LSJ performed work with Subcontract sign off - fixtures self specified in back t GENSLER Specification not included - includes all new systems & air 542,798.00 cleaner - Self Specification Listed in backup $21,534.50 LSJ performed work with Subcontract sign off self specified $592,502.50 $29,625.13 $622,127.63 On the attached pages is a more detailed breakdown of trade items 1. LSJ performed construction is in Brown 2. Subcontractor performed work is in Blue 3. Totals are in grey Curtis EFTA00731169 Master Suite Budget Cover sheet EFTA00731170

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.