Skip to main content
Skip to content
Case File
efta-efta00796563DOJ Data Set 9Other

Work Order:

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00796563
Pages
29
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Discrepancy Resoludon 1 1.1 ',WAN al:OrOY4 1.2 In FrotYrds 1.2.1 Completed 1.2.2 Open 1.3 Waiting approval a.) 1.4 Completed 1.4.1 Completed 1.4.2 Completed 1.5 Waiting alnroyal 0.1 1.6 Completed 1.7 Completed Id Completed 1.9 Completed 1.10 Completed 1.11 Completed 1.12 Completed 1.13 Completed 1.14 Completed airfnmeGuirstreeas GSSO Complied with Intoundrivellminary Inspection as per RSQCT 57 rev 24 Complied with creflight impectlon as outlined in RSQCT-113 Rev. 23 Complied with Debrief drecklaL Part 91.409 f(3). No other spe0al ckaimentation requests. Provided tod clearer= per SOP 1028, all teals eanunted for Covered and PIOteCted as required Told serviced JAW the ground Fending and servicing handbock 14-00-00 00mPlete WM interior Inbotrel InSPeCtianGA 3564 (CG) 5/17 and oleo Compiled with Sample Myra-al/lc Ru105 Secured by customer icon arrival Complied with Service Team Manager Chectist Informalfon Cnly. Compiled wile SIN Quality review 0l work order and tobook entry griOr to decorate Tonto as required N/A no hatmdt to be loaded. For NUM purposes on,F. Return To Service IntoundfOutbaurd Impectnn IntOundtPrellminary IIMDECti3n Outbound IngoteU0n Preflight Inspection CoraPN with Petrie( Oncklat ArriyaVDebref 90 Day De List Review ACCCOWielle List Cs:orator's Airworthiness Requirements &Simnel Documentadon RequeStS Tool Clearance Cover & Protect Service Channel Toilet/0ton Galley AfrivaVDeParkre ASSISI & ,Ade0 Mot Sample RIO-attic Fluids Remote Valuables & Secure. Comply with Service Team Manager CheckIst Fluids Used (011s/9wdroll • (Materials OrrY) STM Quality review 0l work order and ke/b00k entry CriOr to departure Towing (Does not include Hangar Mores) 1.15 Completed Hazmat - Identey &provide a manifest, and a SritnerS Declaration for Darger0us GOOCIS for all bawdous materials that are loaded aboard any airaaR. FAR Fin 1210r 135 gaeratOrs x111 piovile a hazardous material notinatein letter reputed by FAR 135.505 (e) pax to mantereree at Ohs Repair Station kw FAR 145.206 (a) (b). If there b to be loading of hazardous matelots t shall be complied with by llama trained autheized GAC cern:noel only. 1.16 YMOn9 alnroval (L) 1.16.1 Open 1.17 Completed Moan Donn) [VICTIM NAME REDACTED] ConsumaNes & Shop Staples LIE Waiting approval 0.1 Major Alterations regulatory comp/ante requirements to be completed by instaler ea imitated on FM tam 8100-9. Copy and paste from attached statements as needed and ern as required. [VICTIM NAME REDACTED] 25.1301 (a) (0). 25.1353(a) and 25.1431(c) (d). COMFUED WITH THE REQUIREMENTS OF FAR 251301(a) (P). 25.1353(a) and 25.1431(0) (d), via [VICTIM NAME REDACTED]ORT Ho. CEJO(x%g0f% REV. ), ( IN SUPPORT CS STC )3COCCOM ) and GR4R216.4 REPAIR STATION INTERFERENCE TESTING REQUIREMENTS F057 MAJOR ALTERATIONS COMPUANCE FORM. COMPLY WITH REQUIREMENTS OF FAR 25.1529, INSTRUCTIONS FOR CONTINUED AIRWORTHINESS REF X/C00( MANUAL, P/N %/OW= REV. X, FOR INSTRUCTIONS FOR CONTINUED AIRWORTHINESSAHD EILOCX 8 CC FM FORM 337, DATED )0(/XXIXXXX COMPLY WITH THE WIRE ROUTING REQUIREMENTS OF FM POLICY MM-01-04 MO FAR 25.1353 (8) COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF FM POLICY MM-01-04 AND FM 25.1353 (13) By ENSURING ROUTING WAS IN ACCORDANCE AC43.13-11, OIMGE 1 CHAPTER 11, SECTION 8. 1.19 1.20 WalOn9 approval (1) Waiting approval Update WCi a Seance faience Pant and Were & Etakree Requirements. II 500)' 6.21.01AM Gulfstream Proprietary Information Part I N:o EFTA00796563 Work Order: 5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown &pawls All Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays) Assoc Stalin 1.21 1.22 1.23 (1) Waiting approval (L) Completed Completed 1.29 Completed 1.25 In Progress 1.25.1 Completed 1.252 Completed 1.25.3 Open 1.25.4 1.26 Open WaiOng aPPrOval 1.27 WaiOng appal (1) 2.1 2.1.1 2.2 Completed Completed Completed Discrepant/ Reveal scope or aircraft sealer pant totehspftepars, and dtin reptxements reviling in paint reappliatios, and determine area on stir and batanCe. For surfaces :Akre pant is stripped and reapplied or added co top of existing pant on an area greater than 36 square feet the thickness values AO be documented before and after painting . If average oldness %glues remain the seam wore and baba reeincri b net required. For surfaces painted wed an area greater than 36 square feet and before and alter cent thickness average vanes. QC review for pasoble weight end ttlance revision will be regAred. • Thames wit be plottedon an aircraft droning denved from AMM chapter 6 a-other subtle Mach, attached to the week Order and meaStrensantS taken on a two equate foal god. • Reference GAMS 4000, paragraph 3.5.1 for paint restnclicns to fight wird surfaces and RVSM certified aircraft • Reference CAMPS 4000, total average tNduias shed not exceed 6 mils. • Per GAC Mass Properties Engineering, pant thickness of mis equSs .055 pounds per squre foot. Varear QC review, weight change is greater than 2 pounds or .05% of IIAC, the weight and balance report repine rearnaitaton. &exert Ready for Renato Service. At reamed inspectsans, to in64e preflirt ropectoss, maintenance tasks, operational & leak checks, related doraimercaocet and deanna activeescompl0te. Contact Realm to Service group when tNs swank is complied with. Advise customer of preservation requirements per ATA Chapter 10 01 the releant maintenance manuals fa Arframe, Engines, ad MU; review requirements in relation to schedUal Date Po:rimed and later pctental Date Completed; and perform maintenarce or pesovato+ actions as directed by the CuStOmer and documented as a Work Order Squant. Pre-Compliance cabn refurbeshment nspecten NOTE: SEE APPENDIX 04P GSSO 010010-Serree Cater Maintenance !tam Oleddig Comply with lot Codot and Hoe Cabin Carroty with intend Hat Cockpit LAW RSQCT-26S 0.er-I cow, with MOWN Hot Caton JAW RSQCT-219 Rawl cow, with outbound Hot Oxkplt LAW RSQCT-265 Rent Comply with citbeund Hot Cabin LAW fISQCT-219 Rev-2 Remand aircraft laps and bag and scared in Seen 9tranSOWS office. Sales Concesocn MODE DR700..7100F31 Remove LH engne nose cowl and replace with Rots Royce provided exchange trat. Reference RR Newstts6h: tiF2013.02. Removed VII Eng. lamer inlet cowl PN:0K0081-019 SMGV5P159 and installed customer repated Inlet cowl PP: 04(0001-019514: GVSP134SV per 04P 711002 Ilan 11.1. Reference Rerrowi and Instdletsen Wok page IC. CMP GSSO 893131 Alert 5B1311703-73-A9C0383R1 - Replawnent d ilInCOnlomeng Part of the EEC Rebox Assembly Taber Only $1,652 Motet No Charge (Rolls-Royce Warranty) (All Cperatas) The intent of this haorbiecclification Service Buletin Is to replace ben EEC firebox assembles that have an inefficient thickness of the retroescent psnt. Effectivity: Reference Rolls.Royce Serra Butetin 80.700-73- x988883 fa effeCtMty Notes: Advised customer of °ogre and API) preservation requirements. Complied with Pre-Compliance Sin regsbishment ropecton per 14 CFR part 25. Complied with CMP GSSO 010010-know Center Maintenance DIMS= Cheddist Complied with inbound Hat Cockpit LAW RSQCT-265 Rev-I Complied With In0Xeld HOt Cabin JAW PSIZCf:219 Rev-2 Summary: Removed VII Eng. loaner inlet ant PH:09C0301-019 SN:GYSPIS9 ard instated Rolls Royce provided exchange Wet cowl PH: 040/00/019 SN: GVSP13e5V per CW 711002. See steps below for detailed week prformed. COMPLIED WITH CMP G550880131 Nat 58 8R700-734.900383R1 Replacement of Non-Conkrmng Parts of the EEC Firebox ASSeMtly. Not Applicable due to engine SSI: effecthey Engine S/N: 15998 with carEguraban standard 7100111 engrawd en data plate. 12/11,011 6:11:03AM Gutfstream Proprietary Information No: EFTA00796564 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: Au Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalsas 2.3 hi 3.1 Carp kt ed 3.1.1 Canpleted 3.2 Canalised 3.3 Competed 3.3.1 Convicted 3.3.2 Convicted 3.3.3 Competed 3.3.4 Competed 3.4 Competed 5.1 COMMete0 Completed Discrepancy Pans are &heckled arid procured theeurob Reff Royce. Reese place your crow with Ret-Rote Spares sa (6) months m advance and ROMP 'MO need date SO they Can endure parts at:0406:m. CameatcCem Detentes: Cuirstrern viii rrerace Rao. Royce CaparateCare for the three abate en the Custom's behalf. Determination wnat is of is not covered under the mentenzae program will be detenratO by RaluRcyce. My charge, net coated by the CorpoiateCare aceram mll be the Custemsoz rammibilty and %Mast to Gulfs-Cream's standard Terms and Conditons with regard to payment. Sutirressen dl the mote 6 Fecicated on the CorparateCare maintenance program tang in (Dice at the doe a service. "'CANCEL"' 04P G550 880466 Alert 58 68700.73• A101981R3 - Irecductico of a New EEC Firebox Assembly nab a Revised Pant System. Resolution Cannot convey with at this time due to Darts avalabley. $6 emplane due by 31 /AN 2021 (38 rnos remairing). Customer Ssanatuie: Date: ENGINE SA700-71001-11 Rearm NI crane ncee cent and replace with Rots Rate Pavided enchange tot. Reference RR Newsflast NF2013.02. Removed NH Eng. Ceres inlet awl RY:060001-020 SN:GY5P171 and Inetall&I cuRorra offered Inlet cowl PN: 040:031420 SN: 6139 per CMP 711002 Item I I.2 CMP G5.50 893131 Men SB BR[SSN REDACTED]383R1 - nepiaonnent of NanConromMts Parts of the EEC Pae%x Assembly Labor 61,652 MatenalS No Charge (RolisitOyce Warranty) (M Operates) The intent of this Non-Modification Service BuTetin is to replace One EEC firebox assembles that have an nuttoent thickness or the evanescent pert Effecbvity: Reference Rolls.Rome Service &ikon 80.700-73- /ROCOCO far effectivity Notes: Parts are theckPol and procured thrown, ROI/Re/CO Pease place your order with Rob-Royce Spares six (6) months in advance arty provide yaw need date so they an enSure parts avaladlty. CapOrateCare Customers affstrearn vin invoice Rolls- Royce Camera-Gore for the cherges above on the Gusts:rods behalf. Determination what is or is not covered or theym nce ortgram will be detamnol Si RedivRace. M dorms not covered by the CorpaateCare pagan nil be the Custard:es rapcnsibilty and Subject tO Guttman standard rerms and conoloons rah regard to Pareent. Subrnssien of the mode is pralcated on the CorporateCare maintenance pager Ming in force at the bine of scake. Cannbalize Y. duct P/N 0480402-005 from NC 5173 la NC 671, Ref: W.O. 50521837. 49.3.1 Rowed to cannibalize 1- duct P/N 04F0402:035 sin /0459801. from NC 5173 for irate/label onto A/C 671 per RR ER710 DIM 36-1145 Rev. May 15/16 Install prerbusly renewed cannibalized 1- duct PM 04804024006 from NC 5173 for NC 671, itecieved dl to install and installed pa PREMM 36-11-45 Rev. May 15/16 Removed tannitialeed 1: duct P/N 0480402-035, SM 704598CR rron: NC 671 and rotated into onnianal location on NC 5173 RH engine per RREMM 36-1145 Rev. May 15/16 TWA 558135, Due- 6/18 Leak Med( required. Complied with leak check of Y- Ott P/N 0486932-005 on R/II engine with no leas detected per G550 MM 36-11-6 August 31/03. "'CANCEL"' CMP 4550 890466 Mert 58 68700.73• Ali/1981R3 - Irooductico of a New EEC Firebox Assembly with a Revised Pant System. APU RE220 Tochnkal Bulletins (ASC, CB, SB, AD, ACB) "•CAUCEL• • 'CsIc Cs550 9/1162 ASC 1168 Nose Landing Gear (MS) Karnes InstalLtico Summary: Removed Rill Eng. boner inlet tea 68040001-020 SN:GYSP171 and installed Rolls Royce provided exchange Wet cowl PH: 04C0031-020 SN: G139 Der 04P 711002. See steps below for detailed work portent& COMPLIED WITH CMP e3550 890131 Net 58 BR700-736.900003R1 - Replacement of Nan-Confo-miog Pens of the EEC F9.103x Amend& Nat Applicable due to engine 5./N: effectivity Engine SM: 15449 ?nth ccroduratico standard 7100i-11 engraved on data plate. strnmann Removed to cannibalize 7- duct P/N 04F0402•CCG sin 045513CR, from NC 5173 for installation onto NC 671 Der RR Eft710 EMM 36-1145 Rev. May 15/16 Removed annbaltred1- Ott P/N 04F0402-005, SM XY4598CR Nam A/C 671 and installed kilo aigianal location an NC 5173 FUH engine per RREMM 36-11-45 Rae. May 15/16 /WA 558135, Due- 6/18. See Stet below. See Item 3.3.3 for reinstallation Cannot convey with at this time due to Darts avalabley. 56 a:sentence due by 31 /AN 2021 (38 rnOS remairing). Cogent, Signature: Date: Customer elects ro alien at this bme. Customer Signature' Date: tdrisrzoi7 6:19:01Am Gulfstream Proprietary Information Pat I of29 EFTA00796565 Work Order: 5C521661 AC: 5173 ST/4: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status 6 /Monks 6.1 Completed Customer request to comp/y nth Registration change to Ref Rein 20.1 fa no* performed 112121E. Notes: Need 05< update for restrawn3 transponder etc. Pete Rawsen has ordered the wife Sri. 6.2 Watbng Customer request custom &midst be 'staled on DU. aooroval (l) Pease hold watt receipt ol Me custom ACL. 6.3 Completed Plight GLadarce Panel backichong does not Muir/rote for Sinewy: nicht 00s. Confirm NW Carved Item Discrepancy Resolution 6.3.1 Completed Removed night gullance panel (on: 7021852.901 sn: %030509) and replaced WM repaired Pr guidance panel (pn: 7021852401 en: 08080720) with no defects noted. NI work dad per GSSO CMP 221001. Ref tern 11.8 for CMP RIM. Renewed flight pub:lance panel (on: 7021852.901 sn: 06030509) and replaced wen repaired flight pub:lance Panel (on: 7021852.901 sn: 080130720) and performed Autopla operatenal deck with no defects noted. Ahnork done ref CMP G550 221002 item 11.10 and GSSO CMP 22100 kern 11.8. See steps baby/ fa work performed. 6.3.2 Completed Performed Auteibt operational ONNk with nodefects noted. Al work done ref CMP G550 221002 item 11.10. 6.4 Completed DU 24 mop. Swapped with DU 23 and problem (phoned. Removed defative DU and repliced nth notified DU (p.: 7028140-905 sn: 09125363) aid performed operation:1 deck with no defects noted. All work done Per 6550 CND 316024 and CMP 316030. Rel Items 11.7 and 11.9. 6.5 In Custard request to update ROAS settings. Progress 6.5.1 Completed Created one Settings and Riggrhas Der GER 5767 6.6 WAIN Customer requests to update the anhow 4000 aircraft zoomed photo wth the new blue paint sdierre and to add the (L) company logo. Logo to be worded by the Catania. Ref tern 20 1.16 7 Interior 7.1 Completed •••CANCEL•• 'Customer request to remove and replace or- Customs elects no action at this brae. SOW NW. YAM customer Selected Nees: Demon has samples for customer Customer Signature: Date: 7.2 WAN Fwd oxket door hande loose and Orals door operation. aooroval (L) 7.3 'Hsiang Lent hande for on pressure S scotching varier on as approval treSSure 000r (C8528041000) (L) Nathaniel 8.1 Completed "'VOID—Customer request to replace nose and man Otoicate Entry. REF ITEM 25.1 FOR TIRE REPLACEMENT des 8.2 Completed Replace Lil & RH Engem Cows ( to be supplied by Rots- Ref dens 2.1 & 3.1 foe wok performed Royce). Notes: Comorate Care item 8.3 In Customer request full dewing arid operatimal checks of the Progress Lavatory tank end sistan. 8.3.1 Completed Removed, cleaned, nspecte0, and reinstalled tftradOok sensors P61:7700395-001 LM SN:07.G-170]. and R/H 511:07- G-167 per CMP 380015/383024, and CMP 38(031/380032. Ref. Warns. 11.44,11.45,11.46,11.98. 8.4 Completed Customer request to irooect all exterior sense° door latches Sunny: Installed New latch P/N 145000-2•102-142 per BP 1159851110 Rev G to the external MED switch seroce for seryirstality end replace one discrepant latch en the door. Completed inspection of di sense door Latches per G550 MM 53-00-00 )une 15/16 and found no father external MED snatch prvire door diserepanes. (See steps below for a detail of work performed) 8.4.1 Completed Remtreed discrepant latch On the eternal MED switch Senkerlar Per ED 1159651110 Rev G. 8.4.2 Completed Installed New latch P/N 16000-2-102-142 per OP 1159851110 Rev G to the eternal MED swath service doer. Competed inspecdonol al exterior seroce door latches per 6550 MM 530000 Acne 15/16 and 6550 MM 5240.00 October 30/06 irking no further discrepsioes. 8.4.3 Completed Request paint onexternal MED switch Nate door die to The aircraft is getting fill Trap/paint (ref kern 13.1). The MED service {low latch wil be painted at this time. new latch Installation 8.5 Open Customer request to Cheek water system IndtatROS 8.5.1 Completed Complied with potable water tank soNix per G550 AlO4 38-1401 March 31/17. No indication on external pond noted throughout entire service. 8.6 Completed CMP G550 275019 Flap Actuator Travel Nut (Left) - COMPLIED WITH CMP G550 275019 Flap Actuator Travel Not (Left) - Lubrisabco Lubrication 8.7 Completed 04P G550275020 Rio Actuator Travel Nut (Right)- COMPLIED WITH CMP G550275020 Flap Actuator Travel NUt (Right) • tteaca0on Lubrication 8.8 Completed •••V011)•••CMP 6550 274202 Ilarnotal Stabnzer Vod - Cupleate of item 23.11. Actuator - Lubication 8.9 Completed 04P 6550 491005 PAl Embus:0 FS 767 • P5 797. Zonal COMPLIED WITH CMP G550 491005 APIA Enclosure FS 767 FS 797: Zonal InSPeCtian Inspection 8.10 Waibng Customer requests 12 spare aircraft keys. 12.15.2017 6 :ILO AN Gel/stream Proprietary Information Nrc 4N:9 EFTA00796566 Work Order: SCS21661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AD Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc stews i approwi (L) 611 Completed 8.12 Completed 8.12.1 Completed 8.122 Completed 8.12.3 Completed 8.12.4 Completed 6.12.5 Completed 6.12.6 Completed 8.13 Waiting Marmot (1.) 8.13.1 Ccepleted 8.10 COS 8.14.1 Completed 8.14.1.1 Completed 8.15 Completed 8.16 Completed 8.17 COS 8.18 COS 8.18.1 Completed 8.18.2 Completed 8.19 Waiting approval (L) 8.19.1 Completed 8.20 Completed DIsexpanot addedduring debrief Blue 'R FUEL RETURN FAIL' CAS message appeared One tour min eight. Crew Aso toted dilettante oil temperature was 100 degrees Mous and the left al temeerature was 80 degrees eel:M. Added Oaring (letrk4 Apu endceure has several corroded fasteners bated on encloare base loner access panels Fou4 wile COmPlying with ChIP 491085 * 8.9 Removed APU asserrbg (Cr access to beer enclosure ps.eb. Ref. GSSO AMM 49e0-00 Rev. 2/15/15 Removed FWD base rower panel 31282F and AFT base lower panel 312A2F. Removed COrnged hardware and began cleaning panels per Dossing //59851419 Rey. L. Finished cleanng PhD base lower pond 31282E and MT base lower panel 312A2F Pawing 1159851019 Rev. L. Installed new hardware on FWD base lower panel 31285 and AFT base lower ps.el 312A2F per Doming /159851419 Rev. L Installed AM assembly FR • WE38007001 5N • P.500 per 6550 AMM 490060 Rev. 2/15/15. Thies 567921 due O%18 and 562027 due 06/18 Leak died required on MU per 6550 AMM 494300 Feb 15/15. Complied nets leak check of MO per G550 AMM 49-0043 Feb 15/15. Received OK to dose APU panels and completed foal dome. FWD bullet faring (knee panel) ha evidence of erasion at fwd edge around fwd looking camera and a puncbse reside of fairing. Areas marked with OW grease Pence Ref. Item 15.1 removed bullet farm camera for faring repair LAW GC515050250 Rev - Ape Enclosure has large area of distaded coating on fwd bh sde of ape endosure. Request engineering dmosition for APU canpartment has large area 01 fire retardare misprg. Engineern.g dsposton: The coatng it net repairable. Remove any loose or mumbling sections of coahng. If applicable remove the ARemate Melva oil Complence authonzaton horn the aircraft records. Reinstate the krnorthiness Orectiye AD 2009-17-01 and op* MM Supplement GS50-2009-03 in accordance with the State Of registry reduirernerts. "NOID"IL/Il intgaid roriz.stab. leadre edge has tan rubber sat Rel. Paint Traveler " 'VOIDwIrdhl irtgard heriz.stab. Wog edge has torn rubber seal. Ref. Paint Traveler OIP 6550 992902 PD 2009-17-01 InsPeChan For Sealant Applied To The Exterior Of The Auxthiry loner Out (APU) ErsCIOSure Ref 8.14.1 erg dspo for remstabng AD 2009.17-1 Wing body faking grew SOWN in dome nut pate at panel 196.48 an 01 wing as marked with tape. REF 13.1.1 Removed discrepant dome r ate PN: NASMINIA3 from Malec PN: 1159852017-11 pa GAC DWG 1159852017 Rey 6. Install% dome netPlate Par liA514703 On doubler PH: 1159852017.41 and Entailed doubler. Bads Seale/0000er and nu/plate. Week clone per GAC DWG 1159852017 Rev B. Cytn 'AEU Mane Rennet Cm message on APU start. CMC fault code 4922222APU (MU ROw Ceeklet SP Short) Ref tens 112 Gained access to 181A1P1 (oh APU Celina). Disconnected pito, inspected and cleaned cannon plug with nO defects noted. Returned Mat to wird confgurabon. MI reverters:me performed tang V/C61 4940-00 June 15/16. during panel 196AB nstatation noticed glen spmirg freely. MarkedWM tape ReeokidOn Performed heated fuel return memorial check with no defects noted. Al work done per 6550 AMM 28.16-00 dated August 30. 2009. Decade resistor box IDe 569366 cal due date 11/18 Sunurvey: Removed and cleaned areas mond FWD base lave panel 31282F and MT base lower panel 312A2F. Replaced screws PN:MS27039.0609 and washers PN:M1960.108 per Drawing 1159851419 Rev.L See steps below tor full details. Removed at Rose and crumtling sections ct COOtlna per eng dep. Ref item 8.17 for PD 2009.17-01 Ref item 8.14.1.1 for eng dope MRS 891 Ref 506238.2022.1.1 "'VOID"' Entered In wrong MC wOrkOrcler "'VOID"' Entered In wrong A/C wOrkOrcler COMPLIED WITH ChiP G550 992902 AD 2039.1741 IrciPeCtiOn Per Sealant Applied To The Exterior Cf The Auxhary Ironer Unt (APU) Enclosure previougy compiled with in Log Book Entry dated 08/18/09. Veiled KM Sumkment G550-2009-03 was incorportated etc the MM Removed and mowed discrepant dome nutdate Ph' NA51474A3 on dottier Phi: 115965201741 and installed doubler per GAC DWG 115%52017 Rev B. Installed nub:gate PH: ILASI47413 per GAC DWG 1159652017 Rev B. IVISROI7 6:2I:01AM Gal/stream Proprietary InformatIon Nee < of 29 EFTA00796567 Work Order: 5C521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status I Diserepaney ReerWiliOn Ref kern 8.18 821 Compiete1 R/H elevator trim tab upper surface nas 3 areas of possible deaamnWon. Rd. Item 13.1 8.21.1 Completed Removed R/H elevator trim tab FIN: 1159C582095-423 S/N: 373 per OW4550 273024. Ref. Item 11.56 8.212 Completed NOT Inspection mowed on marked SPOt 8.213 Completed Engineerng Cispouton for three surface discrepanoes: Refer to Steps 1 thna 6. I. Solent dean the three areas using dean cheesecloth weer, wet wen HoproPil Alcohol. Continue until rapers 'then dean. Do not use synthetc or shop toted wiper ~torah. 2. $4 all wee locations sand ON surroundng paint using tamde paper anti a solid paint base exist. 3. At the two locations next to the grandrog jumpers carefully sand off the dry fit cloth to expose the carbon pir. Do not Leger art nto carton Alms. TraOSS« Claret remaining wein the rattle snail be acceptable. 1. Heat areas sp to 120 to 140F for at least 20 minutes. After reacting this lolo time and while heat is WI berg apeled, surface wet areas wen Epon 828/ DTA (GAC I ISAA2 GAC117G1 respectlx<v). S. Renacne heat source and :plow surface ta air mol to room temperature. Phalan at 70 to 95F trail the attache gels MaKII slop take dace after 4 hr,. 6. Na other action required shoe NC mil be undergoing repaint. This is inn, repay. MR8 NO. E064 8.21.4 Completed Rhea cleaned tie tree discrepant areas. At all three locations sailed off surrounding paint. At the two batons reed to the mounting jumpers carefuly sanded off the dry 821.5 Completed 8.22 ritteg aP)rosel (L) 8.23 Completed 8.24 Completed 8.24.1 Completed 8.242 Completed 8.243 Completed 825 Completed 826 In Progress 8.26.1 Completed 6262 Open 8.26.2.1 Completed F/G Mtn to expose the carbon ply. Heated areas to 120 to 140F tor at least 20 minutes Solace coated areas with Epan 828 / DTA (GAC11SAA2 / GAC117G1 respectively). Reference ergineerrg dsposstion in step 8.213 Installed R/H elevator blm tab P/N: 115%552095423 S/N: 373 per RIP 6550 273024. Ref. IS 11.561W 560348 Cal 12/2017 Horizontal stabiles R/II hoist plug stopped. Ref. 13.1 ull Flap Traded 1/8 Roller is worn beyond lints per 6550 MIM 273000 Rev. march 31117 Ref. 13.2 MI flap Track Aft I/O Roller is worn beyond Imes per 6550 AMM 27.5000 Rev. MarCh 31/17 Ref. 13.2 RemOved R/H Rart TraCk Mt outboard bracket Replaced WH Nap Traded 1/8 Wier with nor role, P/N 80233012Ft per DIP GSSO 275038 and Drawing 11591354220 Rev G Redved ok to Install and Instated R/H Flap Track "V AFT OM roller ntting. Bolts Still require torque and fang rewires sealant per 1159C554220 Rev G. Oct require torque and fang requires sealant per 1159(554220 Rev G. R/H Hap track 0/8 roller bracket for track has shipped out tolts. bot roles/nutplates may require clearing out. Ref/ism 8.24 While conveying wit paint strip lund dar in right fuselage at GYPS 694.000, skin P/N 115%51316. Impression is approximately C wide by r high and .012' deep. Rel 13.1.2 Request NDT to Chetk for cracks at discrepant area. Request engineering dive for repar of dent In the right fuselage. Preliminary Engneerng Csspastten: I. Gain access to the Wen« Side of the dented skin Visually inspect the dscrepant area for any additional d iamaten to surroundng structure 2. Cold work the dxrcpart area per the procedures in SR 1077 to restore the skn to surrouncing contour 4/..005 irs Strnmarr. Removed CI Omar urn tab PM: 1159C552095-423 5/Il: 373. Cleaned. pepped and repaired all Wee surface discrepancies. Reference Engineering *%O. in SOW 8.21.3. Installed Fuls eievator ten tab Pitt 1159352095-423 S/N: 373 Ref. DIP GSSO 273024 Items 11.56 See correspondrg steps for detals of work performed. 1W 560349 Cal 12/2017 NOT performed Tap test inspection on R/H elevator trim tab upper surface per GAC AIDTP 2.1 rev 7 09/16/2015 No relevant incicabons noted at MS tele Replaced NI %pi? Triads Mt I/B Roller with new roller, P/N KRF233012FT, LAW CIP G550275037 and Drawing 1159055420 Rev G Sirrimay: Removed Rill Flap 'V Traded outboard bracket Replaced NH Flap 11' Track AR 1/B it with new roller, FIN XRF233012FT. Installed R/H Flap 'Er Track Mt aboard bracket. Work performed per ChIP 6550 275038 and Draning 1159C554220 Reg G. See steps below far detakd week performed. Torpred toOltS On fitting and sealed per 1159C5524220 Rev. G Torque Wrench* 558039 CAL: 08/18 Upon further imestigaton round R/H Flap Track B' 0/8 ROter Bracket hardware to be stepped and ~rates are functioning property_ Instated and torqued NEW hardware per 2741-05 Rev. November 15117. POttrmed Eddy Current Insp.:than per GAC NOW 3.0 (REV 7 SEP 2015). No <redo noted at the bele. Equprnere Used: Hartet 5005 GACD 555039 (cal due 12/17) and SID. 560706 (no cal reg.) Christa Kerby, MR81E742 12/151011 6:21:03AM Gulfstream Proprietary Information port 6 of 29 EFTA00796568 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown squawky Ail Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays) Assoc Stows 102 10.3 11 11.1 WalOn0 cfMrowd (1) Waltin) 407001 (L) Waiting aP0rovai a.) Carpleted 11.2 Completed 11.3 Waiting 400001 0.1 11.4 Waiting Motored (1) 11.5 Waling Motored (1) 11.6 Competed 117 11.8 CO 0101 e t e0 Cc n I et ed 11.9 Competed 11.10 Completed 11.11 Wang approval (L) 11.12 Wafting 40004 (L) 11.13 Waiting 400001 (l) 11.14 intiano Wowed (1) !Lis Waiting approval (1) 11.16 Wang a— (L) 11.17 Waiting 400(04 (L) 11.18 Waiting a00Nval 0.1 11.19 Waiting Wowed (1) 12.M2017 6':2103 AM Dbcrepano, COO a Isle .1285-.133$ in. do. per GQIIIAL1)35G at the mare, center part of the depressen to rebore the metered and laelltatecolO 8oritMg. 3 HOT the cob oorked area for cracks (eddy current) anti rernaring materiel tidiness (t Heinle). 4. Inspect the cold worked wee for al caring. 5. Reo.bmIt results to ergamerno for evaluation. mResE742 Paint Outsesnelkm Parts, Materials, and / or Services enineern.3 later Back Ordered Parts Pats Return Follow on CMP Codes / Maintenance Tasks CMP 6550 711001 Inlet Coal (Left) Removal / Installation Ref. 2.1 04P 6550 711002 Inlet Cowl (Right) Removal / Ins0lU9on Ref. 3.1 CMP G550 711019 Coral Door, Engine Lower (Left) Rel. 'tern 2.1 CMP G550 711020 fore Loner Carl Door (RIM) - Removal f Instalation Ref. 'tern 3.1 04P 6550 711021 Upper Cowl Door (Left) Removal/ Installation Ref. item 2.1 CMP 6550 711022 Upper Cowl Door (Right) • RefrOYN Installation Ref. item 3.1 OW G550 316024 DISPLAY UNIT, x4 Ref 64 CMP G550 221001 PANEL, (LIGHT GUIDANCE(GP-500) Rd 63 CMP G550 316030 CENTRAL DISPLAY SYS - AM/TEST Ref 11.7 04P G550 221002 AUTOPILOT-OPERATIONAL TEST Rd 11,8 OW G550 330901 SWITCH PANEL x1 (46251) (VEST. SW PM) CMP G550 330930 SWITCH PANEL x30 (60157) (t/H DIVAN AFT ARM SW PNL) CMP GSSO 330935 SWITCH PANEL 13S (601510) (WH SEAT ET) 04P G5S0 330924 SWITCH PANEL 124 (601511) (t/H SEAT 915V MIL) OW G550 330904 SWITCH EMEI. T4 (59651) (FWD LAY SW PNL) CMP G550 330925 SWITCH PAM% :25 (60153) (VII SEAT *3 SW PNL) CMP 6550 330942 SWITCH PANEL x42 (69652) (AFT LAY SW PNL) 04P G550 330938 SWITCH PANEL 138 (601512) (RAI DIVAN LEDGE FWD 51Y PM) 04P 6550 330936 SWITCH PANEL 136 (601511) (RAI DIVAN FWD ARM SW PRO Resokidon COMPLIED WITH CMP 6550 711001 Inlet anti (Left) - Remard / Installation TW 558064 Cal: 08/18 COMPLIED WITH CMP 6550 711002 Inlet Or A1 (Right) - Removal f Instalation TW:557274 Cal Cue: 06/18 1V(:557259 Cal Cue: 03/18 COMPLIED WITH CMP G550 711022 Upper Cowl Door (Right) - RECAMMI Installation Torque Wrenches used: 557274 Cal die 06/18 557259Cal due 03/18 COMPLIED WITH ChIP G550 316024 DISPLAY LIMIT, et on off: 7028140-901 pn on: 7028140-905 sn oft 07092716 sn on: 09125363 COMPLIED win' CMP GSSO 221001 PANEL, FLIGHT GUIGVICE(GP500) pn Ott/00: 7021852-901 sn off. 06030509 sn on: 08080720 COMPLIED WITH CMP G550 316030 CEIGRAI. DISPLAY SYS - ADJ/TEST COMPLIED WITH CMP 6550 221002 AUTOPILOT- OPERATICNA1 TEST COMPLIED WITH CMP G550 330901 SWITCH PANEL xl COMPLIED WITH CMP G550 330930 SWITCH PANEL x30 COMPLIED Willi CMP 6550 330935 SWITCH PANEL 135 COMPLIED WITH CMP 6550 330924 SWITCH PANEL 124 COMPLIED WITH CMP G550 330904 SWITCH PANEL xs COMPLIED WITH CMP G550 330925 SWITCH PANEL :25 COMPLIED WITH CMP 6550 330942 SWITCH PANEL TAT COMPLIED WITH CMP 6550 330938 SWITCH PANEL 138 COMPLIED WITH CMP 6550 330936 SWITCH PANEL 136 Gulfstream Proprietary Information Pays 0129 EFTA00796569 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from prevtous day (or since Friday on Mondays) Assoc Status ( DIsaapancy Raolutlon 11.20 Waiting alowerral CMP 6550 330905 SWITCH PANEL xS (59652) COMPLIED WITH CMP GSSO 330905 SWITCH PANEL #5 0.) (FWD IAV SW PAL) 11.21 Wan) 04P G550 330940 SWITCH PANEL 440 (57153) COMPLIED WITH CMP 6550 330940 SWITCH PANEL 440 Wowed (L) (ENT CABINET SW PML) 11.22 KAMAN a00rOvy 04P 6550 330928 SWITCH PANEL 425 (60155) COMPLIED WITH CMP 6550 330926 SWITCH PANEL 428 (L) (UV DIVAN LEDGE FWD SW Ptti.) 11.23 WalOrg a00rovy CMP 6550 330927 SWITCH PANB. 427 (60154) COMPLIED WITH CMP 6550 330927 SWITCH PANEL 427 (L) (Ull DIVAN FWD MM SW PHL) 11.24 Waiting a00rovy CMP GSSO 330943 SWITCH PANEL x43 (69653) COMPLIED WITH CMP 6550 330943 SWITCH PANEL x43 (l) (AFT LAP SW PAL) 11.25 Waiting CMP G5S0 330933 SWITCH RANA. e33 (60159) COMPLIED WITH CMP 6550 330913 SWITCH PANEL x33 Wowed (l) (WH SEAT x 1 SW PAL) 11.26 WalOn9 04P 6550 330939 SWITCH PANEL 439 (601514) COMPLIED WITH CMP G550 330939 SWITCH PANEL 439 Wowed (L) (Rill DIVAN AFT MM SW PHL) 1117 IMAM a00rOvy 04P G550 330941 SWITCH PANEL 441 (50251) COMPLIED WITH CMP G550 330941 SWITCH PANEL T4I (L) (CREDENZA SW Pta.) 11.28 WalOrg a00rOvy 04P G550 330929 SWITCH PANEL x29 (60156) COMPLIED WITH CMP G550 330929 SWITCH PANEL 429 (L) (UV DIVAN LEDGE AFT SW PtiL) 11.29 Wilting a00rOvy CMP G5S0 330932 SWITCH PANEL x32 (57152) COMPLIED WITH CMP 6550 330932 SWITCH PANEL x32 0.) (LM WINDOW x 7 SW PM.) 11.30 Waiting 04P G550 330937 SWITCH PANE. x37 (601513) COMPLIED WITH CMP 6550 330937 SWITCH PANEL x37 Wowed (l) (R(H DIVAN LEDGE AT SW PNL) 11.31 %Y910ng 04P G550 330903 SWITCH PANEL X3 (57352) COMPLIED WITH CMP G550 3309W SWITCH PANEL 43 Wowed (1) (GALLEY SW PtiL) 11.32 waltin9 a00rovy 04P G550 330934 SWITCH PANEL 434 (57151) COMPLIED WITH CMP G550 330934 SWITCH PANEL 434 (L) (Rill SEAT *2 SW PttL) 11.33 Waiting a00,0 94 CMP G5S0 330902 SWITCH RAND. e2 (57351) COMPLIED WITH CMP GSSO 330902 SWITCH PANEL #2 (L) (GALLEY SW PttL) 11.34 Waiting agliOral CMP G5S0 330931 SWITCH RANO. e31 (60158) COMPLIED WITH CMP 6550 330931 SWITCH PANEL x31 (I.) (VH WINDOW • 6 SW PM.) 11.35 Waiting 04P GSSO 330926 SWITCH PANEL x26 (60152) COMPLIED WITH CMP 6550 330926 SWITCH PANEL x26 Wowed (l) (IA SEAT x 2 SW PNL) 11.36 WalOn9 04P 6550 233084 Dgtal Video Dsc Player (No. 1) • Anal COMPLIED WITH CMP G550 233084 Digital Wee Disc Player (Na. I). Final Phase Removal InRyla0on Wowed (L) Phase Removal / Installation 11.37 %Yang aPorgral CMP 6550 233089 Dgtal Video Du Play. (No. 2). Final Mese Removal/ Installation COMPLIED WITH CMP G550 233069 Dgrtal Video D8O Play. (Na. 2). Final Phase Removal InstarlaBon (L) 11.36 Waiting a00rOvy CMP G550 233061 Canoed Dec Player (1b. 1)- Anal Mose Removal/ Installation COMPLIED WIT' CMP 6550 233061 Canpact Disc Player (No. 1) - And Phase Removal! ireddlaticn (L) 11.39 Waiting aegrOral CMP 6550 383001 TOILET, AFT LAY 0.) 11.90 Ccmpleted CMP 6550 323011 Lending Gear Emergency Extemion COMPLIED WIT' CMP 6550 323011 Landirg Gear Emergency Extension Netogen Bemedawn Borne (Right) - Nitrogen Bkromieren Bottle (Art) - Amoral! Irate/Ian:0 Removal/ Instalatem 1W: 568539 Cal. Due: 02/18 IW: 562027 Cal. Due: 06/18 11.41 Completed CMP G550 351023 Crew Ongen Mask and Regulator Box COMPLIED WITH CMP G550 351023 Crew Ceygen Mask and Regulator Box (COsetver) Removal! Instigation (anerver) Removal! Irntalation Ref. 23.22 11.42 Completed CMP 6550 351036 Observer Oxman Mask Removal! COMPLIED WITH CMP G550 351036 Ctisemer Oxygen Mask Removal F Installagan Installation Rel. 2122 Mkt page: I2C 11.93 Waiting CIO 6550 381001 WATER TANK, el Motored (l) Ref. 15.1 11.44 fY910ng CMP 6550 380015 Waste Tank UltrasonIC Level Sensor COMPLIED WITH CMP G550 380015 Waste Tank Ultrasonic Level Sensor (Let) Removal 1 Ingailathri Wormed (L) (Left) - Removal / Instalteko IW: 567921 Cal Due: 09/18 11.45 Completed CMP G550 303031 Waste Tank Leta Level Sensor left. COMPLIED WITH CMP G550 380031 Waste Tank Ube Level Sensor left., Deanna I2'lS2017 6.2i.taAm Gulfstreem Proprietary Information Pad sof 29 EFTA00796570 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Disawanet Resolution Ocianrg TW:567921 Cal Cue:09/18 11.46 ComMeted 04P 6550 380032 Waste Tank Ultra Level Sensor Right, COMPLIED WITH CMP 6550 380032 Waste Tank Ultra Level Sensor Right Oearing 11.47 Waibng 003nlig CIO GSSO 393025 Logs Gritrol MOtb.ne System-bps Ck TW:567921 Cal Due:09/18 (I.) al 0 11.48 Waiting al CIO 6550 383024 Waste Tank Ultrasonic Level Sena (RV% Removal / Insolation COMPLIED mni OW 6550 383024 Waste Tank Ukrasonic Level Sensor (Right) -Removal/ Installation 0.) 1W: 567921 Cal Due: 09/18 11.49 Completed CMP 6550 283006 FUEL SYS-Aux POWER UNIT BLEED COMPLIED WITH OW 6550 280006 FUEL SYDAUX POWER UNIT BLEED Ref tern 8.12 11.50 Comokted 04P 6550 4%001 Audign Power Unit (AIM Ftwaonal COMPLIED WITH CMP G550 490001 AlWilify Power Unit (ARV) • Funanal TeSt Test Ref tern 8.12 Ref. squznkk 8.19 11.51 Walen9 approval 04P 6550 342650 Reward tcolong InfraredWin:10w Assembly - Removal / Installation (L) 11.52 Walen0 CMP 6550 352009 PAX OXY SYS (AUTOIMMI)-FUNC CX %NOW 0.) 11.53 Comokted 04P 6550 491101 OM • Removal 2 InstalaUon COMPLIED WITH CMP G550 491101 AP IS • Renxival / Installation Ref tern 8.12 11.54 Waiting CMP 6550 275001 Ftnp Swami* (Left) - Renewal f OW (I. .) Installation Ref.13.1 1 11.55 Waiting onward, (L) CMP 6550 275002 Flap Swami* (Rght)- Removal! Installation RE113.1.1 11.56 Comokted CMP 6550 273024 Trim Tab, Elevator (Right) Rel. Item 8.21 COMPLIED WITH CMP 6550 273024 Trim Talx Elevator (R301) 1W 560348 Cal 12/2017 11.57 Completed 04P 6550 273306 EVL TRIM TAB CONTROL SYS • F/T COMPLIED WITH CMP 6550 2733% EVL TRIM TAB CONTROL SYS - Fp 11.58 WAN approval 04P 6550 324003 Main Wheel Assembly (Left Outlwald) • Removal f Instalation ref 25.1 (1) 11.59 WAN approval 04P 6550 324004 Main Wheel Assembly (Left Irtgard) • Removal f Instalation ref 25.1 (1) 11.60 Wall1n9 04P 6550 324005 Main Wheel Assembly (Right Inboard) • 11.61 NOW, (L) Waiting ReM041 t Insta? Aim CMP 6550 324006 Man Wheel Assembly (Right Outboard) - %NOW, 0.) Removal t Instafatban ref 25.1 11.62 Waiting CMP GSSO 324009 Msn Landing Gear Wheel Iliearrg (Left Wowed (L) Outboard) - Inspection / Ow& ref 25.1 11.63 Wall1n9 04P 6550 324010 main Lancing Gear Wiled Beath) (Left Worm's, (L) Inboard) - Inspection !Check ref 25.1 11.64 Wall1n9 CMP 6550 324011 Main Landing Gear Wheel Bearing (light Wowed (L) Inboard). Inspection /Check ref 25.1 11.65 Walen9 04P 6550 324012 Main Landing Gear Wheel Bearing (Right 11.66 (1) Waiting aPINOYal Outtgard). InWettian / Oka* ref 25.1 OW GSSO 324015 Msn ire Assently (Left Outboard) - InWeCtian ref 251 0.) 11.67 Waiting CMP 6550 324016 Mein lire Assembly (Right Outboard) - 'onward, 0.) Inspection ref 25.1 11.68 Wall1n9 04P 6550 324034 main lire Assembly (Right Inboard) • 'onward, (1) Inspection ref 25.1 11.69 Walen0 onward, (L) 04P 6550 324033 Main lire Assembly (Left Irtgard) • Inspection ref 25.1 11.70 Walen0 CMP G550 324020 WHEEL. L MG OBD(s1)-NDT IN5P ref 11.71 (L )al (L) Waiting aPINOYal 25.1 CMP 6550 394021 lIMEEL, L MG Itt8D(E2)-NOT INSP ref 25.1 0.) 11.72 Waiting 'onward, CMP GSSO 394022 lIMEEL, R MG ItifiD(e3)4407 INSP ref 25.1 1.11:‘,2017 6:21:01AM Gulfstream Proprietary Infermatlen Paw 0 of 19 EFTA00796571 Work Order: SC521661 AC: 5173 STM: Charts Thomas SCC: Julian Brown Squawks: MI Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Discrepancy RawAudon (L) 11.73 Wean? aPPrOWI CMP 6550 324023 WHEEL, R MG O00(M)-NDT INSP rel 25.1 11.71 %Wen; aeprovd CMP 6559 123301 Min The Assembly - Senicng rá25.1 (L) 11.75 COmPkted CMP 6550 314030 Modular AmOnKS Unit s1 - Remaal! COMPLIED WITH CMP 6550 314030 Module. nocrucs Unit II • Removal / Instalation Installation Torque Wreed, C/N: 553002 Due: My 2018 11.76 Competed 0.1P 6550 314030 MCdular Amoncs Unit r2 - Removal? COMPLIED WITH CMP G550 314034 Mockler Avows Unit 42 • Removal! Inealation Installation Torque Word C/N: 553002 Due July 2018 11.77 Wailing a00ronal CMP 6550 314120 ASC8 Tenn Sweep COMPLIED WITH 09P G550 314120 A503 Take. Sneep 11.78 Cu Waiting a00nOW1 CMP GSSO 314025 CENTRal /89515OP 01E0( (L) 11.79 Waiting approwl CMP G550 344207 Enhanced Ground Pm:dinky ~hear Warning System - Rerun to Service Test COMPLIED WITTI CMP GS50 399207 Erhanced Greed Proximity Weideled Warrig Sporn - Relent to Service Test (L) 11.80 Wailing approwl CMP 6550 344201 MODULE a1, EGPW5 COMPLIED~ 09P 6550 344201 MDCULE s1, EGPWS (L) 11.61 Wailing approval CMP 6550 345810 GPS • OpteatKnal Chedi COMPLIED~ 09P G550 345'310 GPS • Operational Cheek 0.1 11.82 Carpeted CMP 6550 314309 inadular AmOnKS Unit 43 - Remaal! COMPLIED WITH 09P G550 319309 Module. avioncs Unit 43 Renwal! Ingalatgn Installation Torque WrenchC/N: 553002 Due July 2018 11.83 Wien? aPPrOYal CMP GSSO 314320 MAU Operational Ole& COMPLIED WITH CMP GS50 319320 mau Operational Ole& (L) 11.81 Waibro approval CMP 6550 275037 IS Track flap Raters (Left Inbed Upper Aft) - Renwal! Installation COMPLIED WITH 09P 6550 275037 B Trod, Flap Rollers (Left Inboard Upper Mt) - Removal / Instalbbon (L) Rel 8.23 TW: 558064 a due: OB/18 11.85 Wean; approval CMp GSSO 275038 IS Trod flap Raters (Right Inboard Upper AA). Removal! Iretdlabcri COMPLIED WITH CMP GS50 275038 B Trod, Flap Rollers (bold Inboard Upper AR) - Rernmal / Installation 0.) Ref 8.24 TW: 558064 a due: OB/18 11.86 Completed •••PERMMANT REMOVAL*** 04P G550232150 Cabin naPERMENANT REMOVAL" n COMPLIED WITH Gla GSSO 232150 Cabin Nelwak Accderdor. REF: SOR INSTALL Network AcoderatOr 15.15 Plat. 5/N: 669 FS: 632.000 WT: 10.12 LB5 12 Wat's - Work Orange Requests 12.1 ~Ong aPPrOYal WCR 1- APPROVED: Custc.ner request the Entrance Doer. Arstali Door Jamb, Insole tanong Gear Daiii'S and Inskle Cl.) Surfaces of me ha Crakes oe panted "mite as existed color. This WCR is witten to commulate chance horn proposal 7037536, and customer drecoon Information Only Item 12.2 Ward «Prol WCR 2- EXCUSED: Customer request to replace al Cam closet Inn; material we. OJSIOMet selected grossOnt. 22.3 (L) Open WCR 3- APPROVED: Customer request to renvox the two 12.3.1 Open (2) console tables and Ws Irom me wan sae ledges. Wood Later Only 12.3.2 Open INT Stpport (PAR) Labor OW 12.3.3 Open Inspeedon tabor Qty 1ZA Ogen VCR 4- APPROVED: Customer request to remove al cabin dual cuprielders and replace with single cwh016N, No cuplidders wal be required at the diven or the area 'Mere the two cols* tees are rerncned. 12.4.1 Open INT Shea meal Labor Only 12.9.2 Open Wood Labor Only 12.9.3 Open Inspection labor 0* 12.5 ViDiOng arofovai WCR S. DECUNED: Customer request to replace the allStak vinyl with new customer seeded 12.6 (L) Open WCR 6- APPROVED: Customer request to replace the galley and galley annex counter top nouns mtt. narcinood. The current nosngs vilt be removed. The new noungs wil be fabricated of hardnood and veneer. 12/11,2o17 6:2I.03AM Gulfstream Proprietary Information Pen IO of 29 EFTA00796572 Work Order: 5C521661 AC: 5173 STA: Charles Thomas SCC: Julian Brown &pawl= MI Yellow = Newly Added 163,174 Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Ain Stalin I WiCreglancy Resolution 12.6.1 Open Wood Labor Only 12.6-2 Open INT Finish sal Paint Leber Onty 12.6.3 Open Inspection Labor Ortv 12.7 Waiting approval (L) WCR 7. DC-CUNED: Customer requests t0 add MO (2) each 110 VAC and two (2) each USE <hissing ports in the codpt 12.8 Waiting awroval ViCR 8. CeCURED: Customer leaves% instaltgron of LED Wester lights. 12.9 (L) Waiting approval note: Mrstar light bezel plating Is not Included. Sbautl the light bezels realm plating. the Rem wll be worked as a line and material effort ova 9- DECLINED: Customer requests to replete allcalm hardware. 12.10 (1) Waiting aPPriwal Due to fluctuations in plating costs, cis WCR a berg presaged as a bidgetary effort. Al cann hardware wit be removed anti plate(' to the customer selected finish. the plated terra wit be reinstalled and operatenaty inspected for proper fit and funCtiOn. Notes: My repairs found nerwvwxy ere not included end wet be addressed on a brie and inaterul basis. VCR 10- CeCUNIEO: Customer request t0 recover the baggage compartment with new grosspoinl matted. 12.11 (1) WaiOn9 aPProval Tee baggage compartment will be disassembled as required t0 remove al misting grosspoint from the subsoate and omen. Specified grossoont will be notated on panels and all areas of baggage gm:sport. Al applKable hardware and hardwood Ifni val be repainted to match the new macro,. PrepOSal based on reuse a all applicable gOstrate and componentry n exhort° COndtlOn. Repairs to substrate pats are not ncluded and wzl be quoted on a tine and material bags. VCR 11. CC-CLINEO: Customer reqUints to replace the curse-it chna and flatware trawer inserts with new. (L) 13 Option 1• Full Pant • (Ref. Item D 1.1 of Prommel 13.1 Open ID* 7037336, ROD) °Mien 1. NI Pant The preparation and applcation of the exterior pant wll De apole0 n accordarxe with the orocethres are specifications waned is the Gulistream Aerospace Material and Process Specification (GAMPS 4000) and will Include tee Wiener.) Customer 'peened elements: 13.1.1 In The enSh09 Paint roll Pre removed from the Swart. Compoote surfaces wil be self sanded to 'ww.e the Voss from the excang paint. The main entrance Antall- door. Altair doorjamb, and baggage &or Arne wit De parted to mach the Primary fuselage Woe. The nude of the landing gear doers rill be painted with the same base color as the outstie surface. The Landing gear wet Pre deaned. Ynng wales wll be applied n madame with approved A new radon DOOt wll De acoleci. An antenna leadna edges wll have erosion tape applied. Preciously polished metal wrier: wil be buffed. The aside surfaces of the aimrakes wet be painted. After completion of the erter cir paint, a weight and balance wll be performed on the eboeft. Any terns not listed above wil be quoted map:retain basis by the GlifStrtem locates Para Operatlens manager, inducing labor and materials on a Won Ovnge Realest (MR). "' SEE APPENDIX FOR ADDITICOM IAPO •" MechaNcai Pare Traveler 13.1.1.1 Progress Completed Temperately install of panel 32SAT, and panel 337CT fee part traveler Pet 6550 ANN 55.30.00 Rer.ftw 15/17. 13.1.1.2 Open Rel.13.1.1 Remove panel 32SAT, and panel 337CT after completion of pant traveler per GSSO Anal SS-30-00 Rev.Nov 15/17. Rel.17.1 13.1.2 Waiting 2rea Aircraft Sopped aircraft per GAPS -0300 rev. G. 13.13 Imp In PrepPM:rart Pre9reSS I2.05,20I7 6,2113AM Gulfstream Proprietary Information Past I I of 19 EFTA00796573 Work Order: SC521661 AC: 5173 STM: CharIM Thomas SCC: Julian Brown Squawks: M Yelblv = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC i Stalt181 I Disamsancy 13.1.1 Open 13.15 Open 13.1.6 Open 13.1.7 Open 13.18 Open 13.1.9 In Progress 13.2 Completed 13.3 Open 13.3.1 Open 13.3.1.1 Completed S Waibng approval (1) In Progress Layout ArcreA Part Aircraft DetallNrcraft Weight and Waite customer support ergneenng supped Inspect di flap rollers prior to pent. Radome to Snare perimeter steps. detail Insprxtion R/H Se negative step of .053 out of links, malted with rmskng tape with mows per G550 AMM 53-02-01 Rev. Nay 15417. Ref Plant bavekx 1 le. Request engineering Oimosnon to cared rt/H Sate negative step on radorne that is out of limits. Engreeerng Dspezton: It IS acceptacie to repar the outol.toluance radcrne sten In accordance with Gurstream %nice Letter GSL035300301 Rey. .*Aerodinarnic filer Sweep- Fair Procedure - Radcme Steps". This Gullstrearn Seneca It (a) a Ct3S9Aed as a Man& acturers Service Document and IS gleeMed by ArIMPXy Circulars 20.176A and AC 120.77. Completing a repair per a Gullstream Serwce Letter is Slmfar to tOrnMeting a repair per the Sincere Meer Manual (SRM); No sepal number SPEC.% FM Form 8103-9 is required and vell not be mended n support of a GSL repair. The Engneenng (Scarce) Data for this Service Letter has been shown to comply AIM the soot* FM'S artIls FM Approved. &sinew.° source data is retained by Gulfstrearn as propietary data. Photographic Documentation • (Rat. Rem Ei 2.1 Of Proposal IDS 7037536, ROO) Priptourare- Whimcreation a no dupe to Customer may be taken n act:rant nth the folbmng agreement between the Custoter and Gullsveam. Should the Customer like to ParVegate in this PhotograpNc Documentation, please renew the folkmirg agreement and authorize by accepting this item on the proposal summary Page Agreement: airstream reserves the right to photographicallydocument the outetting process and the refurbshe0 arcraft. Al Photographic DOCuMentifign Is accompli9ed at Gfistresen% dsueton. GI-Ostrom reserves the right to use in advertising, as the OA fah./ Internet sites GullereamsAde0S. promoting or othenstse supporta° the business of Cunneen\ Inciudre wakes imeaoca copYng, ram:duct/a% ph1shing in a Before and After coffee table beck, n hole or in pal. Indvdually a In conjunction AIM other matcrials. The aircraft and oanosimp information ...al Mt be included in any pubic Nblicabch Buyer is prended with the falowng photography after aircraft delivery: One (I) electronic copy et areran FeCteg-arwe 3st Oxman (Ka-hand) Nigh-Speed Data installation - (Ref. Item 5 2.2 of Proposal me 7035248R03) xt Convex (ca-band) Mgh.Speed Data Sr-tern Instaltsban Ca-Ostrom kyr' instal this latest swum of high-speed firoadeand aata SyStetn. Ore (I) Modem Manager (MCOMNI) will be installed in Me aft baggage compartment Mance. cabinet. If Sat TV a installed, the exating cabnet will be modged and reused unless the cost exceeds the new canon instalaten. AS the overall manager for the system, the MOCNAN IS responsible for providing the user interfaces to the aircraft/Passeurn One (1)Aerefgutlai Personalty Module (AFM) wit be loaned in Me baggage comparonent eritirent cabinet and hems the configuration data For he system One (1) Ka-bend IkorrA Nehmrk Data Unt (KANOU) will be installed In the boiler room. The Keirei receives commands from tie HOOMPI Trough an Ethernet Interface to merging the antennall(REU and reports status oar this Ethernet interface One (I) sa.band Frequency Unt (KRIV) will be neater:1n the prnornty of me MIA assembly on toe of the tal empennage. The KRA) contains a Nod-Goan Gornerter (BOC) to convert the received Ka-band frequencies to IF fretruendeS and also is made up of a rods-up Comae. (WC) to convert the If frecoenoes to Ka-band frequencies. A High poner *molter (HPA) :sways me send strength for trans:visual by the antema. One (1) Tail Mounted Antema (TIM) wil be mounted on Reeoludon Pertained. Rap Rote Inspection pox to paint per 6550 AMM 27-50-00 Rev. March 31/17. See terns 8.23 6. 8.24 tor gasames Ben Ridgdll GAC MRB 01680 12115i017 6:2803AM Gulfstream Proprietary Information hoc 12 a /9 EFTA00796574 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Disaapanet Resolution top of the tail arpennage underneath the radcme. The arterna system is to amore and establsh communications wth SatellteS In WOWS atitS t0 enable beyond lintel- richt orimusicatan between Strome, ground foal, end gaud transportable terminals. The Radome yin be renXrced and replaced by a new Ka- band capable radorne. Certification: The Jet Cana (Ka-bard) High-Speed Data System along with the Sakern Direct Router wit be Installed ea Waster STC: meted. of STC, 4th Quarter 2017. ••• SEE AP9f-NDIX ••• 15.1 .1 In miores &retro) tape Avionics Progress 15.1.2 In latch Engr Later MOM= Progress 15.1 .3 In AV1 Systems Test Lagar Cn)y Progress 15.1.4 In MI /Electrical Labor Only Progress 15.1 .5 In Mei Sheet Med La00r OM/ Progress 15.1.6 In INT Swoon (RSA) Labor Olt Progress 15.1 .7 In SC MaIntenante/Hargar / Primary Codes / Touch Labor Only Progress 15.1.8 Open SC Pant Labor Cily 15.1 .9 In Inspection La00r Ccry Progress 15.1.10 Open Weight and Bake= Labor Only 15.2 Venting COMPLY WITH DRAWING CPE303000090 REV. B (KA- 400rOulli P:0) 0.1 15.3 Open Comply with GfX303001004-501 Rev B 15.7.1 Completed Removed existing antenna structure bracket parts GC544030069-13, • It • 15, and -16 at P15993.60, renewed weight is .45 lbs , one 115901152050-001 and -002 .25 lbs each, one each 1159GS52014-067, 068 end 059 removed weight is .10 lbs end, one 11594352014-059 remxrred weght is .05 lbs per 01YGe GPX303001084-S01 Rev F (kA BAND - GSSO INSTALL) 15.3.2 Completed Vented parts from stock; GPM304001379-301 Tray Saw, CP4468001411.301 GAS Fan Duct Any. GPM304001379.101, CP14304001408-101. GPM30400t409.101, GPH304001407-101, GPM304001380-301, GM904001381.331, GPM304001383.301, CP14304001382-301. GPM304001405•101, CP14304001405-101 Brackets. LOCate0 and driled noted parts at Vat Stab PS. 1033.1 Eq. 0.0 per GPX3030010134-501 Rev. tog TO INSTALL) 15.3 .3 Open Installed GP/4304001379-301 Tray 065Y, GPM468001411-301 Guided Fen Dust Any, GM4304001379.101, GPH304001408-101, GPM304001409.101, CP14304001407-101. GM43D4001380.301, CP14304001381-301. G44304001383-301, GPH304001382-301, tea GPM3D4001405.101, CP14304001359-101 BratketS. MI work performed per GPX303001084-501 Rev. F 15.3.4 Completed Request Engineering Disposition: On the Engneering Dspositen: GPX303001084-501 &airing, malty Flog Noe 7 as diens. The mu:steel Mange to flag note 7 are acceptabe to eryneang and are a Myer change. Rep 2 mould reed: QOM Pltell and roll measurements In the nose landing gear bay using a maolevet on production installed levelng brackets. Set pitch of antenna tray to MREP7356 Jason Grardban -1.00 degrees withn +1-.25 degree Fran readings taken from production installed leveling brackets. 15.4 Completed Comply WIN CP04160001469.301 Rev.--. Cabinet bought Iron, stock. Reference step 15.4 a1 15.5 Waiting Carla with GPX4680001547-301Rev.A. (Mery rent Amy.- Complied with GPX4680001547-301Rev.A. (Pcnurrent Assy.- EttggageCabnet APH, MCOMAN G450/ 6550) See aPProval a.) Ettggage Cabnet APf4, MCOSVUI - 0450 / G550) steps tam for work pertained. 15.5.1 Open VOIDS" Ref Step 15.18 For seek Performed. 15.6 Waiting Comely with CPX468031549-501Rev.B (KANDU instl.) Complied with GPX468001549-501Rev.B (URDU irritt.) See steps below for work adorned. Imp 15.6.1 Completed Yenned parts from stock. Located, and dnlled GPM30400t349.30l Hountrg Plate Assembly, (1) GPM304001351-301Kancki attadaent angle assembly and (1) GPM304001351 KarOu attachment ange assembly to the areas at FS 890--905 VA 115. --OK TO INSTALL-- 15.6.2 Completed Installed (1)GPM304001349-301 Moulting Plate Assembly, (1) GPM304001351-301 Kandu attachment angle assembly. and (I) GP/4304001351 taros attachment angle to the 12152017 62110AM Cul/stream Proprietary Information Pap< O,42V EFTA00796575 Work Order: 5O521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AP Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or same Friday on Mondays) ASSOC SIMMS I Resolution IS.? Ye/slang Wormed (L) 15.8 WAND Wormed (1) 15.9 WAND Wormed (L) 15.10 15.11 MOM 40(04 (L) Waibng aPPrOyal (L) 15.12 Ye/slang Wormed (L) 15.13 Waltirg Wormed (L) 15.14 Waltirg Wormed (L) 15.14.1 15.14.2 COmOleted GPM 15.15 Waiang Wormed (L) 15.16 WAND Wormed (L) 15.17 Waltirg Wormed (L) 15.18 15.18.1 15.18.2 Waltirg aL0,04 (L) Waibng Insp GPM 15.19 Waibng aPPrOyal (1) 16 KA BAND HARNESS PAIIIIICATION 16.1 In Progress 16.2 in Pr (Kir., 17 ASC 085A XM Weather Installation - (Ref. Item 8 2.3 of PrOpOSal IDs 7038248 R02) 17.1 Discusser/ aircraft at FS 890-905 WL 115 rang Bkieprot sellout ha-Orme. Al hodi performed in accordancexiM Map GPX468001549-501 Rev B COCTOV ?AIR GPX468031557-501 Rev B ( BAGGAGE CABINET - APM, MODMM INSTL GSSO) COmptv with GP% 303001139-501 Rev - (RadOrne COMPLY WITH DRAWING GPE3030C0393 REV. A (KA-BANO TAIL WIRE HARNESS) COMPLY WITH DRAWING GPE303000092 REVA (KA-BAND BAGGAGE WIRE HARNESS) COMPLY WITH DRAWING GPE303000091 REVA (KA-BAND WIRE ROUTING) COMPLY WITH DRAWING CEE370C00013 REV.— (CCCIG'IT SWITCH PANEL MOO KA.BAND) COMPLY WITH DRAWING CEE394C00014 REV. A (AUX C.B. PANEL MOD) COMPLY WITH DRAWING GPE370300026 REV. A (COCKPIT SWITCH PANEL MOD. SDK) RenXwed obsencees seat Ini; 11595C7501•1 St4:201-1425. from aircraft tor avionics Install per 6550 ARAM 25-11-02 Rev.31/17. Reinstall observers seat Ftl: 1159SCFS01-1 SN: 281-1425, after avionics install Is compacted per 6550 ARAM 25-11-02 Rev.Mar 31/17. COMPLY WITH DRAWING GPE429000032 REV.F (SCR) COMPLY WITH DRAWING CEE4290)050 REV. A (CABIN LAN ROUTER MCC) COMPLY WITH DRAWING GPE429000037 REV. A (SCR WIRE ROOTING) COMPLY WITH CE5430X063 Rev ( 415C MODS- KA BAND INSTL) Vented locations and petted (2)a/451836-3 Inserts fa 644806002351.101 Ao3le, (2)7143)836-3 Inserts ra 644805001267.101 Ao3le, (6)7143)836-3 Inserts ra GPM004001496-101 and GPM004001492.101 angles. (2) KAS1836-3 Inserts fa CE444290002-103 Maranon= Panel Asw, (2) NA51836-3 515015 for CE444290002.101 Relay Rail, aid (4) NAS1836-3 1R5015 for 1233-F-2191-10 SattOm direct Router. All work performed per CES43030053 Rev -. Located and rotated (13) CB4019G3N7SPOITe Down Any IO Cabinet for electrical wring installation. All work done per *awing CE54303C053 Rev •. COMPLY WITH DRAWING CES1 4290267 Rev -. CABIN LAN (1400) COMPLY WITH GPE303000093 COMPLY WITH GPE30300e097 In Progress ASC 065A XM Weather Installation This Service Change instals an antenna, receher, too (2) data ports and assodated wing fa the *1 satelite weather SyStem. ether a tore or an aft instatation may be selected based on aircraft cooteurabon. AMYL Mat are Provisioned for AM Installation may recmire an °mimeos review 10 compete toe 'rotation. Pnwhiccis may rod** wring, &razor*, recover, data ports or any combination of these components and are typically installed poring competition. PrereRtigteS: ASC 908 - PkneVIew Mager Operating Software System SORWare Upitite (Cart Fox) Prior tot or at the time Ms A5C is ordered, operators villi be reot'red to semi., a configuration report Or toe Complied with GPX468001557-501 Rev B ( BArtrars CABINET APM, MCOMAN INSTL - GSSO) Ref Step 15.18 for work perfcemed. 12'15,7017 6:21:01AM Gel/stream Proprietary Information Pay la of 29 EFTA00796576 Work Order: SC521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawkn au Yellow = Newly Added Items Green = Changed Rems (Ready for inspection or completed) from previous day (or since Friday on Mondays) Anor Sat% I Dbwepanw 17.2 Waiting aPeroved (l) 17.3 ridt.% approval (L) 17.4 riattlna <dermed (L) 17.5 Waløn9 aPProval (A) 17.5.1 Completed 17.52 Completed 17.6 Compkterl 18.1 Central Hantenarce Computer (CMC). The C% report an be stored cn me aircraft PC laptop men Wc-L/0mm suirnitted to Gulfweam at /Son rorte (3) to fem (5) dyrs le me OIC rapar! review and up to Mutrene (21) days (or the~ danen ODI1Ord Data disk. EttedMhe Trill SeMoa Mange a apoicable to alraalt Serial Msnbers 5001- ~ert Notes: Internt aocess toreform this installatIOn 15 ret inclocied me kil trace. Airport md.:jurati install ion Iscatai d the system ard avaitaomy ot spare yrinng "ly milan year hours, an/Juni Ce at (ESS reDueel end coud necesstate aootcnal eng neenng. ThisASC 5 a managed Frogn:in. Incorporatcn rust be COOMInated InrOu% CUNtrearn Artrast Scneouring at 800.810-61As (4853) M 912-965-4178- If not scheduled, armraft ~rene codd moane egrifpardy. II% Stryke Cnancre may only te nstateo at a atfstream Aerospace CMP GSSO 970051 ASC 85A »I ~Na Iratallaben COMPLY WITH DRAWING 11595557976 REV. A (»I MATER) COMPLY WITH DRAVANG 11595557977 REV. A ( XM MATER WIRE ROUTING) COMPLY WITH 11555547%5.15 REV.0 DIM ANTEN% INSTL.) Located and driled 11595847985 -19 dahle and tRo 1159584795-25 nralatra Omtalen . Ce to «tall per 11595541985 Rev C <kamre . Ret Red p9 18 C. InstaBed 11595847986 -19 doubler and Mo 1159584790525 notpote datters per 11595847985 Rev C bana% . Ret RM prj IB C. CMP 6550 316705 XM ~Mer Antenna - Renoval Installaticn Ase 912 and ASC 123 Pbnerfew MOS Upgrede - (Ref. Item 8 Le of Proppsal ID* 7038248 R02) In Pregress 18.2 ConaSeterl 18.3 Completed ASC 9:2 ned ASC 123 Plsr.new MOS ASC 912: ibis Senke Mange (ASC 912) InStall5 tis maneYen master oDataene System (m05) software Mella Part (Omner (1%) MM7031235-024. AMC 123: na Service Range (45C 123) bads a combinaton of new ant ending software basedon <urent alioart configuratian. Prerepietep Sutene an APM Seteres 8 %anes lotto ASC 910 . eDneVien, MOS Software Update or later; er ved-vinn equivdent is Ne rnnmum cert levd required. Pnce to, er at the urne ms A% a ceOrred, apsatars vrii be tepured to suneD a eorth9aratson report of the Centra Maintenante Computer (CMC). The CMC repal em be stored on me drent PC leptcp Nen electrencal sulanutted to Gulfstream at Operators utaana CuRem ETertrOniC CneedISt (Ea) mist aen new %ethvert. Pnet to, or at the time tNsASC Nanna. satsvare may ce ordered from em~ EO. page on vnGulfstreamcorn tonearret Requirements: MC 912 and ASC 123 we complkd niro in ccmunction. eneavity: rna Service Cnamje K apoicable to antatt &dal Nulte!, 5001 - 5549. ThiS. Of a såmoe denge, MI be installed clunng insal phase ~ur/letemg on arma Send momsas 5550 and nesecuent Notes: Aka% that do not med the prerecubite minimum levd (or mcdificatian may utast dumma 11595857083 to n»at te bets regulrerne Of MC 107 and ASC 910. TI% nen) near ona eused coocumently vil MC 123 and MC 9:2. Abc:art te m drøning 11595857010 to nettene pereouste namn" reaultements or ASC 107 ard MC 910 Support et a managed ecegeam condisted by Product Support Program Management (PSPM). CMP 6550 979120ASC 912 PuneVietr Mager Coeraeng System Scarrere Update CMP 6550 9712304SC 123 Pta-idem AL‘erres Roodudon COMPUED WITH 11595547985.15 REV.0 (X4 ANTENNA D1511..) SEE STIPS BELOW FOR WORK PERFORMED. REFERENCE CMP 316705 (STEP 17.6) COMPUED WITH CMP (550 316706101 Yromner Antenn Removal i Instalation COMPUED %VIN CMP 6550 979120 A5C 912 mannnew Master °matine System Software Utelate COMPUED Orrfil CMP 6550 971230 ASC 123 PlerieNew Arenes Enhancement 1245..2017 6:2153AM Gulfslreaen Propriet/sy Infnation Pace IS EFTA00796577 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks•. MI Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC Stades 18.4 Completed 18.5 Completed 18.6 Completed 18.7 Can: Pete] 18.8 Completed 18.9 COmp/MCI 18.10 Competed 18.11 Carpeted 18.12 Completed 18.13 Completed If 19.1 Open Discrepant/ Enhancemert OW G550 319010 lbneywel Ptaneview Operational Software master OPerardr9 System Top Level System (VMite Disk) •••VOID• • • CMP GSSO 319015 Honeywell Planeview, Conigiratix (Piraaft Opbons) Software Top Level System (Yellow Disk) CMP G550 319017 Honeovel Planeview, Aircraft Optons Data Software Weds, (White Disk) 04P 6550 319020 Gulfarearn, Electronic Dedlist Seetware (Pa* Disk) CMP 6550 319025 Gulfstrearn. Setang / Rigging Software (Grey Cask) OAP 6.550 319040 GUINtrearn, CommunIcadanS Management rtmcmn Amine modinable Informatics, (AMI) Software (Orange Disk) OW 0550 319044 GuIrStream, Programmed° CAS Messages Software (Turquoise Disk) 01P G550 319030 Gulfstrearn. Central Maintenance Computer Loadable Diagnostic Irionnation Software (Black Disk) CMP 6550 319110 ATC Data Base du Vpdate Comdy vain GvSP.GE.R.7 32 RTS Chtdwix Prccedcre Rowena Woodwork • (Rd. Want A Li of Proposal 20* 7039407 R00) Reveneer WcCdAt.S. The exl≤trol'ovrieer COMM COT 00001,3 MI be removed km the arcraft and stowed of all veneer surfaces, Katmai caps. and nosng. Al subsbate mill De Cleaned and pepped for aPPliCanan o new selected ‘treer (III 170718.2 QM Slyer Brai)wth correspordng AsOnccd caps and nadng. Modficaticns a repars to any substrate material or %wawa, hard/are will De evaluated and addressed on a time and material bass. Al the exatng Latches mill be deaned and retained, New hrdware, d requested, MI be addressed on a tine and meteriaN basis. New Customer Selected Veneer MITI be aDDled to the existing substrates. The new veneer will be finished with Gulfstream standard 141411 Clear coat finish and poisbed to a Predetermined luster. Al applicable eternal surfaces Mill be cleaned and retaned In edging COniltien Paining a recoQem) fie the internal SWIMS yin be addressed on a tine and materials basis. Inlays of any type uach as wood, metal• car gone inlays are not included in this proposal. Exlgrg relays MI be evaluated on a case by case basis and addressed onetime and materids bass. Burn certificate° a indebted upon the costing substrates meeting al the FM flammablity requirements. Gulfstream is not responsb* for any existing materials meeting pars reotoenents. The recovered dons, prods, and cabinetry will be reassembled and mutts it aircraft. MI adjustmentsMI be made to ensure Cones Mt aid function. ECNIPMent relOCa000 k net Part Of ttiS proposal and wit be addressed metro and inseends base. In SEE APPENDIX FOR ADDITIONAL INFO ••' 19.1.1 In AI fEleCtilcal La0or OW Progress 19.12 Open INT Sheet metal Labor Only 19.13 In Wood Labor Only (270 ) Progress Deducted 270 ban from the original 1897 hours for vendor supplied lobo- (SAPS) 19.1.4 Open INT Finish and Paint tabor Onrir Total Mors 405 OutSde tabs fa 11/27 W 12/6 197 hrs RellOkidOn COMPLIED WITH 04P GSM 319010 Ilawywell Maneview Op:rat/nal Software Master Operating System -Top Level Waal White Disk) Pfl OFF: 037031236-00323 Pfl ON: 837031236-0032S SN OFF: 35582318 SN ON: 356269E2 •••VOID•••ENTERED IN ERROR SEE ITEM 18.6 COMPLIED WITH 04P G550 3190171bnewiell Dian NI OFF: DM60002648-50047 Pti ON: DV 60002648.50078 SN OFF: 5173 Sit ON: 5173 COMPLIED WITH OW 6550 319020 GullStreany Electronic Crieddist Software (Node Disk) COMPLIED WITH 04P G550 319025 Gulfstrearn, Seftirg / Piecing Software (Grey Cask) COMPLIED WITH CMP G550 319040 Gullstrearry Communications Management Flatten Aldine modeia0e Information (Awl) Software (Orange Disk) Aram Options Data Software - Reda (MX DSc) Pf4 OFF: 69001791.503 PN ON: 69001791.505 Sri OFF: GM 20AUG2013 SN ON: CDC O41UL2017 COMPLIED WITH CMP 6550 319044 GultMedrn, Progammade CAS messages Scrtwart (TURIU0Se Disk) COMPLIED WITI CMP G550 319030 Gulfstream, Central Mart/nonce Computer Lendable Diagnostic Information Software (81mk Disk) PM OFF: GY_911 00323 01_022714 Pti ON: GY_912_003:5 03_052317 SN OFF: 5173 SN ON: 5173 COMPLIED WITH CMP G550 319110 ATC Data Base Dec • Update Complied with GYSP-GSR-7132 RTS Checker/ Precedire Reference papa'copy (rdee 9A) line signs for Mork Performed. IIIISROI7 6:21.01AM Gulfdreom Proprietary Infonnetlan Pate 16 0'29 EFTA00796578 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status -Cl Resolution Outside Labor for 12/4 to 12/10 208 In 19.1.S In 'HT Sapped (R8A) Labs. Cnly Progress 19.1.6 In Inspection Labor Orgy Progress 19.1.7 Open ElarornabiltT / Muted, Labor Orly 19.1.8 In Wood ShOP Labor to Stelp Fuser., Veneer. Progress 19.1.8.1 In Strip Veneer - Rll and LH 680 &Alma& and Door. Complied with Labor to striprenew kern the RH and LH 680 bulkheads and doze. Progress 19.1.8.2 In St® Veneer • AFT LAY WOW and SOME Progress 19.1.8.3 In Sins Yenta - AFT Lay Varety Progress 19.1 8.4 In StrO Veneer • AFT Ul C1OSet. Progress 19.18.5 In Strip Veneer - Art RH acad. Progress 19.1.8.6 In WO Veneer • AFT LH Gal/W. Progress 19.1.8.7 In Sire Veneer - AFT RH Galky Annex. Progress 19.1.8.8 In Sin Veneer - 4 Dian End Cabinets. Progress 19.1 8.9 In Strip Veneer • Cabin LOOK. Progress 19.1.8.10 Open Sin Veneer - Console Tables. 19.1.8.11 Open Sin Veneer - FWD Fodcet Door. 19.1 8.12 In Stro Veneer • FWD 814 and LH Cabin Bulkheads. Progress 19.1.8.13 Open Sin Veneer - PSU Hardrals. 19.1.8.14 Open Sin Veneer - FWD Crew Refresh Cabinet. 19.1 8.15 Open Aro Veneer • FWD RH Law. 19.1.8.16 Open Sire Veneer - REIM and LEER paneb. 19.1.8.17 In Sire Veneer - ACOSX Door. Progress 19.1 8.18 In Stro Veneer • EnIn Panels (2) Progress 19.1.8.19 In Strip Veneer - AFT LAV Door. Progress 19.1.8.20 Open Stro Veneer • FWD Lae Door. 19.1.8.21 In Strip Veneer - !lawns Rads. Progress 19.1 .9 Open W000 Shop Labor to Reveneer Minas. 19.1.9.1 In Law to Veneer LH and RH 680 Bulkheads and Door. Progress 19.1 9.2 In Law t0 Vereer LAV Niche and Synod. Progress 19.1.9.3 In Lace to Veneer -OFT Lay Vanity. Progimss 19.1.9.4 In Labor to Veneer AFT LH Closet Progress 19.1.9.5 In Lady to Veneer -AFT RH Closet. Progren 19.1.9.6 In Labor to Veneer -OFT LH Gate,. Progress 19.1.9.7 In Lace to Veneer -OFT RH Galley Anna. Progress 19.1.9.8 In Labor to Veneer 4 Coen End Ca0nets. Progress 19.1.9.9 In Lace to Veneer Cabn Ledges. Progress 19.1 9.10 In LOW tO Veneer - FWD Pocket 000r. Progress 19.1.9.11 Open Labor to Veneer FWD UI and RH Bdkheads. 19.1.9.12 Open Labor to Veneer PSU Hand Rads 19.1.9.13 Open Labor to Veneer FWD Crew Regresh °dna 19.1.9.14 Open Leto- to Veneer FWD RH Lay. 19.1.9.15 Open Leto- to Veneer LEER and liter Panels. 19.1 9.16 Open Labe/ tO Veneer - ACOuStle 000r1, 19.1.9.17 Open Labor to Veneer - Entry &Ahead, (2) 12IS.2017 42lb, AM Gulfstream Proprietary Information Pape 17012'0 EFTA00796579 Work Order: 5C521661 AC: 5173 STPI: Charles Thomas SCC: Julian Brown Squawks: Ali Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Discrepancy Resolution 19.1.9.18 19.1.9.19 19.1.9.20 19.1.9.21 19.1.10 19.1.10.1 19.1.10.2 19.1.10.3 19.1.10.4 19.1.10.5 19.1.10.6 19.1.10.7 19.1.10.8 19.1.10.9 19.1.10.10 19.1.10.11 19.1.10.12 19.1.10.13 19.1.10.14 19.1.10.15 19.1.10.16 19.1.10.17 19.1.10.18 19.1.11 19.2 19.3 Open Open Open Open Open Open Open Open Open Open Onen Open Open Open Open Open Open Open Open Open Open Open Open Waibng Into WAN aPprowd (1) Walen9 aPprowd (1) Labe- to Veneer AEI' Lav Door. Labor to Veneer FWD Lav Door. Labor to Veneer Cceisole Tables. Lass tO Veneer Madeline RaCkS- Wocd Shop Labor to Assemble Labatt. Labe- to Assemble Ul ard RH 680 Bulkheads and Dear. Labor to assent* tav tiple and Wroud Labor to Assemble AF7 Lav Vanity. Labor to Assemble AF7 W Upset Labor to assent» - AFT PH 009it. Labor to assent» - AFT UI Gatey. Late- to Assemble AF7 AH Galey Amex. Late- to Assemble 4 Divan End Cabinets. WØ tO Anemia* - Can Ledges. WØ tO Anemia* - COnSede tatieS. Labor to Assemble FWD Podiet Door. Lat t0 Assemble - FWD UI and PH Cahn Bulkheads. Wt tO Assemble - FWD Crew Region Cabinet Labe- to Assemble - FWD PH Lev. Labe- to Assemble - Leet and Reef Panels. Wt tO Anent,* ACOuSIJC DOGS. Wt te, Assemble - AFT t.av Doer. Labor to Assemble - FWD Lav Door. •••Entered in Ester FlanYnablIty Data. arid Rewneer LH and RH 450 Bulkheads and Door. Sao and Revmeer AFT tav NChe and Shroud. 19.4 19.5 WMOng a— (L) Waibng a— g.) WO and Revmeer arr tav Vanity. Stnp ard Rovmoer AFT W Omet 19.6 19.7 19.8 Waibng aPProval D.) Waltn9 aPProval (1) Waltn9 aPProval (L) Strip ard Kameer AFT RH Closet Sao and Revmeer AFT tu Galley Assy. Stao at Revmeer AFT RH Gate, Amex ASSY. 19.9 19.10 Wale% a— (1) Waibng awaws (l) WO and Re«neer 4 DWan End Cabinets. Strip and Ramer Cabe, Ledges. 19.11 19.12 19.13 Waibng aPProwd (l.) Water., aPProval (L) Water., aPProval (L) Stnp and Ramer Pocket Door. StM and Re•eneer FWD UI and WI Buldvarls. WO and Reoeneer PSJ Hanealls. 19.14 19.15 waiting a— (L) Waibng a— (L) Stro and Re«neer RIM Clew Refresh Cabinet Strip ard Rmeneer FWD RH Lav Assy. 19.16 19.17 19.18 Waibng aPProval (l.) Walen9 aPProwd (1) Walen9 Sim and Rmawer LEER and PEER Panels. SD° and Re•eneer acoustic Doors. SD° and Re•eneer Entry %kneads 12, M2017 6;21:03 AM Gulfstream Proprietary Information l'am Igor EFTA00796580 Work Order: 50521661 AC: 5173 SIN: Chart Thomas SCC: Julian Broym Squat: Ali yellow = Newly Allied Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Nam I SIAM 19.19 19.20 annoyer (L) alt g agOroval Waibng a00ronal (1) 19.21 Waibng a00ronal 0-) 19.22 Wailing etyma (U 19.23 Waiting ran (-) 20 20.1 OPen 20.1.1 20.12 20.1.3 20.1.4 Open Open Open Open 20.1.5 Open 20.1.6 Open 20.1.7 Open 20.1)3 Open 20.1.9 Open 20.1.10 Open 20.1.11 Open 20.1.12 Open 20.1.13 Open 20.1.19 Open 20.1.15 open 20.1.16 Open 20.1.17 Open 20.1.19 Open 20.1.19 Open 20.1.20 open 20.121 Open Disalpanor Stop and ReKneer 3 Console Tables Strp and Renmeer AFT lay Door. Dap and Reasneer FWD Lay Door. Srop and Reasneer Magaare racks Sett one rev wth closet, credenza and Mt ow, rehash cabinet to SAPS fa strip and revenea. Pictures taken for documentation. Re94ba0ae Change a COrrfifir with registratiOn Change as calmed In RECCT*115 Rev. 12. Registration charge to 14212X. Customer requests that the Guirstream ODA issue a replacement standard atm.:ahem= certifieate Are to registrathin crave. Provide t0 the ODA the f011FrAng items: A. A cepf of the Ai:Mader cover Meet with current haws and IP-dings. 8. Standard AhvartinessCertnate, FM Form 8100-2. C. Ceroncate of MOM Regstraticn, AC Fern 80563. Requre a written onprol statement signed by the registered awe or certficate °Fedor to requat a redaoement afrnortniness certMcate. The request Shall include the resist:awn number. Serial nunDer, make and model d the aircraft as well as the reason for the request. Renew the arcreA reostes and nspect the aircraft to ensure me request Is Justine, and the await is eligible for me cerdicanon requested. Records review consists ventmauan that there are r preen inareenance due aCbCetS or amorthmens drectives.Arcraft meatus coasts of a data date and registration marking marrination, wen a visual rose./ or me aircraft for 01,4005 COntlitens impacting aircraft safety. Verily current arro-aft re0stra00n, reference 14 CFR 07: Nara copy Regabation AC fpm 8050.3 for new registration rumba or Assignment of Spxial Registration Nuirbs AC tom 8050-64 drid heed airy of old Aerobia° AC ram 8050.3 8050.3 or Deaier Rept:eaten AC Form 8050-6. leafy new registration number is treatedon the await. Rd: 14CFR 45. 23, 45.25, 45.29 & 45.33. Verify aircraft ID Mee instdlabcn. Rd: 19 CFR Part 45. FM form 81C0-2 Mote for new regstranon number by arfsvean ODA. If the winner defers Gulfstream COA issuance of a replacement aims:Rhine= certificate, a Cants- mu/ink will be Signed as deemed by the Cugemar. Rrel : 14 CFR 91.203 (a) (1)1. Re-strap/ Re-program transponders to new registration. (Transprorelers with Mode 5) Reibipfite Program SELCAL CO new code F Own011117 changes. Cornmenn SATCOM for new moat., ce Re•Strap SDU foe new registration number Change. Reconnect° Magnastar, Nrcell. & Kir systems. Centime MIS. Now tnstdlatices or regstrabon nunba change. Re-strop via Laptop. Install new regstraton minter daardS in cockpit. Insoles' new) SEI.CAl. number in cockpit. Change logo on Amboy. f Catinview, if ownership changes. Re-strap or re-program ELT's (90614112)n aircraft (As rectired to new registration and I or county Cede). Reconfigwe highS Data Units or 8Mi Rearing-re Display Controlers Tail number f SELCAL Vainly Paper regStraDOn of ELT's (406191-12) ( If Instated In life molt). Rearing-re the Erhanced Flight Identifialson Code to the current rept:Paten 20.122 Open Wain a copy of me feart Certricate of aawarthiness. Foreign ArnatIlifteSS Certificates, all Foreign ROSIISbatkin Documents and archive with the walcader. ReedudOn 17/110017 6:11:01AM Cul/stream Proprietary Informalion Palo ION 29 EFTA00796581 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC Shuts Discrepancy Resolution 21 12 Month OSP Tasks (Exhibit]) - (Rat Stan C 1.1 of Proponent.* 7039702 ROO) 21.1 waiting aPProyal AcconAIM 12 Month CMP TaSkS (Exhibit 1) Notes: (L) Cerrection of decrepancies a rot included in the quoted oce. matenais/ Outside Services will be tilled as rectired. 21.2 Open CMP 6550 237004 COMM Voice Reterder Operational 21.3 Open Test CMP 6550 240121 Emergency Battery Power System (Left) • OPerational Test 21.4 Open CMP G550 240122 Emergency Battery Power System (Right) - Operabond Test 21.5 Open 04P 6550 240123 Emergency Battery Power System (Forward). OPerational Test 21.6 Open CMP G550 240124 Emergency Battery Power System (4/1)- OperatioeS Test 21.7 Convicted 04P 6550 243011 L Man Battery - CapacityOw* COMPLIED WITH CMP G550 243011 L Main Battery • CapaOty Dyck 21.8 Completed 04P 6550 243012 R man SOAPY 00acRY Check COMPLIED WITH CMP G550 243012 R Main Battery • CapaOty Check 21.9 In CMP 6550 256043 Few Aid Kit (No. 1) - Details Inspection Progress 21.10 ComOkted 04P 6550 256071 flashlight (Ho. 1) - OpealionalOyck COMPLIED WITH 04P G550 256071 Fiashliga (No. I) - Operational Crreck 21.11 Completed CMP G550 256072 FtoshIght (No. 2) -Operational Test COMPLIED Willi 04P G5S0 256072 RasNight (No. 2) -Operational Test 21.12 Completed CMP G550 256073 RashIght (Ho. 3) -Operational Test COMPLIED WISH 04P 6550 256073 RasNight (No. 3) - Operatimal Test 21.13 Completed "'DELETE"' OW 6550 256161 mutual/at • Detailed Medical kit not installed on this aro* per ncombn drawing 60528000312 Rev 8. Inspection Customer Signature: Date: (Oaten:: signature on File) 21.14 Completed •••DELETE••• Ceelo GS50 256162 ftedeal itst lime Limited Medical kit not instdled on this aircraft per Iboe0br droving 60528000312 Rev B. Supplies- Discard Customer Signature: Date: (customer signature on File) 21.15 Open CMP 6550 256201 Life Vest(s) - Detailed Inspection 21.16 Completed CMP 6550 256202 Lire Raft(s) (No. I) - Detaled Inspection COMPLIED WITH CMP G550 256202 Lire Raft(s) (NO. 1)- Detailed Inspection 21.17 Completed CMP G550 256203 Lire Raft(s) (No. 2) - Deleted Inspection COMPLIED WITH CMP G550 256203 Lire Raft(s) (NO. 2)- Detailed Inspeaion 21.18 Completed CMP GSSO 256282 Perscrol Ikeethro Equipment (1b. 1) - COMPLIED WTI CMP G5S0 256282 Personal Breathing Equipment (No. 1) - Detailed Inspection Details Inspection 21.19 Completed 04P 6550 256306 EnkeyawV Locates' TranstaRter • coetwoogi Test (FAR 91.207) COMPLIED WITH CMP G550 2563% Erna yaws, Locator Transmitter - Operational Test (FAR 91.207) 21.20 Completed CMP GSSO 262560 Trash Receptacle Enclosure (Mt COMPLIED WITH 04P G5S0 262560 Trash Receptacle Enclostre (Mt Lavatory). Detaied Inspection Lavatory) - Detailed Impaction 21.21 Completed 04P 6550 262561 TraSh Receptade Enclosure (Forward COMPLIED WITH CMP G550 262561 Train Reavtacie Enclosue (Forward Lavatory) Cleated Inspection Lavatory) Detailed IrepeCtiOn 21.22 Completed CMP GSSO 262562 Trash Receptacle Enclosure (Mt Galley COMPLIED WIT( CMP 6550 262562 Trash Receptacle Erobstre (Mt Gales, 1 Arrtex) - Detailed Inspection Annex) - Detailed Impection 21.23 Completed 04P G550 262583 TOM Receptade Fre Extinguisher COMPLIED WITH 04P G550 262583 Trash Receptacle Fire Extinguisher NOMM (Mt Lavatory) - Detailed Inspection Nozzles (Mt Lavatory) - Detailed Inspection 21.24 Completed CMP G550 262584 Trash Receptacle Fre Extinguisher COMPLIED WTI CMP G5S0 262584 Trash Receptacle Fire Extinguisher Nozzles (Ponverd Lavatory) - Details NOVI% (FOnsard Lavatory) - Detaled Inspection Inspection 21.25 Compieted 04P G550 262585 TraSh Receptacle Fre Extinguisher COMPLIED WITH 04P G550 262585 Trash Receptacle Fire Extinguisher NOMM (AR Galley / Annex) Detaled Nozzles (Aft Galley/ Annex) - Detailed Ireprction Inspect:3n 21.26 Completed CMP G550 262601 Portable Haim Are Extingusher COMPLIED WTI CMP 6550 262601 Portable Ibbn Fre Extinguisher (CoMpt) - Inspection (COMPIO • Inseecebn 21.27 Completed 04P 6550 262602 Ported° Haim Fire Extinguisher COMPLIED WITH 04P G550 262602 Portable Haion Fre Extinguisher (Cockpit) • Weight Check (Coduot) - Weight Check Scab: 566768 Cal. Due: 04/18 21.28 corona 04P 6550 262621 Portable Haien Fire Extinguisher (Nt COMPLIED \VIM 04P G550 262621 Portable Haion Fre Extinguisher (AR Ca0in) • Inspection Cabin) - Inspection 21.29 Completed 04P 6550 262622 Portable Haien Fire Extinguisher (Art COMPLIED 1VITH 04P G550 262622 Portable Haion Fre Extinguisher (AR Ca0in) • Weight Check Cabin) - Weir Check Seale: 566768 Cat. Dom: 09/18 21.30 Completed 04P G550 262631 Portable Hakin Fire Extinguisher (Aq COMPLIED WITH 04P G550 262631 Portable Haim Fre Extinguisher (AR Lavatory) • Ir6pecbon Lovett(?) InefeCtIOD 21.31 Completed CMP G550 262632 Portable Halm Are Extingusher (Mt COMPLIED WIT( CMP 6550 262632 Portable Hobo Fre Extinguitlier (AR Lavatom) - Weight Check Lambe?) - We5Mt Deck Scale: 566768 Cal. Due: 04/18 21.32 Completed CMP G550 312003 BAITER?, PILOT 000( COMPLIED WITH CMP G5S0 312003 BATTERY, PILOT CLOCK 21.33 Completed CMP G550 312004 BAITER?, COPILOT 000( COMPLIED WTI CMP G5S0 31200E BATTERY, COPILOT CLOCK 12102011 6.71.0, AM Gulfstream Proprietary Information Puy Oo(20 EFTA00796582 Work Order: SC521661 AC: 5173 STM: Chart Thomas BCC: Julian BrOwn Squawks: MI Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from pmylous day (or since Friday on Mondays) &Hoc Stains Dlearpancy Resolution 21.39 Compkted CMP G550 321803 Mein Landing Gear and Doors (IS) - COMPLIED WITH CIP G550 321003 Man Lancing Gar and Doors (LeR) - lanai lrapection Zonal Inspection 21.35 COmPleted OAP '5550 321804 Mn Landing Gear and Dovs (ROM) • COMPLIED WITH ChIP 6550 321804 Man lancing Gear and Doors (Right) • Zonal Impaction Zola' Insprxdon 21.36 Completed CMP 6550 322802 Nose Lending Gear and Doers - 2enal COMPLIED WITH CIP GSSO 322002 Nose Landing Gear and Doors - Zonal Inspection Inspectian 21.37 Open CMP 6550 335020 Ca EmerginCYUSerbng Operational Test 21.38 Completed CMP GSSO 353002 Portable Oxygen Bottle and Mask COMPLIED WITH CMP GSSO 353012 Portable Oxygen Bottle and Mask Assembly (No. 1) - Detakd Inspection Assembly (No. 1) Defiled Inspection 2139 Completed CMP 6550 382003 Water St eillzer Mbar Discard COMPLIED WITH CMP G550 382003 Water Stoker Filer • Discard 21.90 Completed CMP GSSO 521010 Mn Entrance Doe Lulmeitian COMPLIED WITH CMP GSSO 521010 Man Entrance Door - Lubrication 21.91 Completed CMP GSSO MOOS Baggage Compartment Door - COMPLIED WITH CMP 6550 523005 Baggage Compartment Door Lubrcaben Lutdcation 21.42 Completed CMV 6550 525001 Ata PreSSure BUTOMO Dad Seal • COMPLIED WITH CMP 6550 525001 Ater MOM.° BUlaTeati Mr Seal - Detailed Imp Cooled Imp 21.93 Completed CMP GSSO 531015 Nase Gear Wheel Well FS 99 - F5119 - anal Inspection COMPLIED WITH CMP GSSO 531015 Nose Gear Wheel Well FS 91- FS 119 -Zonal Inspection 21.44 Completed 04P 6550 531045 Main Gear Vircei weds FS 576 • FS 632 COMPLIED WITH CMP G550 531045 Mari Gear Wheel Wets FS 576 - FS 632 (Left) • Zonal Inspection (Lea) - Zonal Inspection 2165 Completed CMP GSSO 531096 Mein Gear Wheel Wells FS 576 - FS 632 COMPLIED WITH CMP GSSO 531016 Man Gear Wheel Wets FS 576 - FS 632 (Right) - Za.al Inspection (Right) • bail Inspection 21.96 Completed CMP GSSO 531097 Mein Gear Wit Wells FS 576 - FS 632 COMPLIED WITH CMP GSSO 531047 May. Gear Vibes Wets FS 576 - FS 632 (Cam Panel Drain Holes) - (Enhanced) (Care Panel Drain Holes) - (Enhanced) Za'S Inspection Za'S Inspecban 21.47 COM/eted OAP 6550 531098 Main Gear Wit WON FS 576 • FS 632 COMPLIED WITH CMP 6550 531048 Man Gear Wheel Wets FS 576 - FS 632 (Wiring Harness) (Enhanted)20nal (VMng Harness) • (Enhanced) Poni InSpeCOOn Insp.:bon 2168 Mgr; angora ••• RELATED CODES • Complied WM related codes (1) 21.49 Completed CMP 6550 243001 Main Battery (Left) • Removal COMPLIED WITH CMP 6550 243001 Man Battery (Lett) - Removal/ Instalation Installation Pfd OFF & ON: 1159SCAVS19-1 SN OFF: 090520C069DCF SN ON: 0905200106783 21.50 Compkted CMP G550 243015 Man Battery - Operaticnal Mack COMPLIED WITH OAP GSSI) 293015 Man Battery- Operational Oiedc 21.51 Completed 04P 6550 243002 Main Battery (Right) • Removal/ COMPLIED WITH CMP 6550 243002 Man Battery (ROO Removal l imitation Installation Pfd OFF & ON: 1159S W/519-1 SN OFF: 09352001067W SN ON: 090520006900E 21.52 Open 004 6550 256041 Fret M KR (N3. I) • Removal Installation 21.53 Caraileted i•CMP G550 256061 Fkahlight (No. 1) 44,./01C04• Not Removed Ran AkcraR 21.54 Completed iVOID•"CAP 6550 256062 FaShlight (NO. 2) •n1/DID"' Not Removed Ren AkcraR 21.55 COrrerkted i'n/OID"'04P G550 256063 FaShIght (NO. 3) InVOID"' Not Removed Ren AkcraR 21.56 Wotan? approval CMP GSSO 256160 Heckel Kit (I) 21.57 Waitng approval PIP G550 256260 Ufe Raft (No. I) (1) 21.513 Waitng approval CMP G550 256261 Ufe Rail (NO, 2) 21.59 Caro/ate] CMP G550 256281 PrOteCtive Bleating Equipment (No. 1) ' COMPLIED WITH OW CZ50 256281 Protecthe Breathrg Equipment (No. 1). RemOval Install/ten RefrOčal Vista/anon 21.60 Completed alp GS-S0 256301 Emergency tacata Trarernitter - COMPLIED WITH CMP 6550 256301 Ernergency Locator Transmitter - Removal! Installation Removal InitaTation 21.61 Completed 04P G550 256311 Emergency Locate Transmitter • COMPLIED WITH CMP G550 256311 Emergency Locator Transmitter • Operational Clock Ocerational Check 21.62 Completed CMP GSSO 262600 Portable Helen Are Cilinmisher COMPLIED WITH CMP 6550 262600 Portable Helen Fie Eitinglaher (Cadge) - Rend / Installation (Gagpit) - Removal / Instalation 21.63 Completed CMP 6550 262630 Portable Makin Rie EnIngtssner (Aft COMPLIED WITH CMP G550 262630 Portable Haan Flee EilinSuiSher (Mt Lavatory) • Removal / Installation Lavatory) • Removal/ Installation 21.61 Completed CMP GSSO 353001 Bottle, Portable Oxygen (No 1) COMPLIED WITH CMP GSM 353001 Borne, Portable Oxygen (No. 1) 21.65 Completed 04P 6550 38)039 WATER STERIUZER COMPLIED WITH CMP t3550 381039 WATER STERILIZER 21.66 Open 04P 6550 381029 POTABLE WATER TEST 2167 Cerrosce CMP G559 I 82002 W.Y.tt Sterling H4• Remcnal t COMPLIED WITH CMP 6550 382002 Water Stu Ozer Filter - Removal Installation 22 Discrepancies related to 12 Month CMP Tasks t- (Exhibit 1) - (Ref. Item C 1.1 of Proposal 10a 7039702 ROO) Miscellaneous CMP Tags (Exhibit 3) - (Ref. Item C 1.30f Proposal 100 7039702 ROO) 23.1 Wallkg Mcomoisn Miscefarwods CMP Tasks (Eg.6. agprove/ Notes: 12115,2017 6:21:01 AM Gulfstroam Proprietary Information Peg 21,429 EFTA00796583 Work Order: SC521661 AC: 5173 STA: Chart Thomas SCC: Julian PrOvin Squawks: All Yelloiv = Newly Added 163,174. Green = Charged Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Sis Tims Dbaipancy ResoMion 04 Ocrectkm e1 diereparcies is not included in the quoted price. MattilalSiOutelde 5eMeaS WI be tilled as rebtared. 23.2 COmPleted CMP 6550 256019 EVAS SyStem (Left) PerOdle IMpeChOn COMPLIED WITH OW 6550 256019 EVAS System (Left) • Periodic [lisped*, 23.3 Completed CMP G550 256020 EVAS System (Right) -Periodic COMPLIED WITH 04P GSSO 256020 EVAS System (R4st) - Periodic Inspection Inspection 23.4 OAS CMP 6550 256404 Delltdrator Battery towel Cheek COMPLIED WITH 01P 6550 256404 DelltrIllatOr Battery • !Med / Check 23.5 COmiSeted CMP 6550 256407 De8tdlator Electrode Pads • Inspection COMPLIED WITH CMP G550 256407 DelltrilgtOr Settee PUN • Inspection 23.6 Completed CMP G550 261419 Baggage Compartment Below Floor COMPLIED WITH CMP 6550 261419 Baggage Compartment Below Flow Overheat Thennti Svitch - ruts:nal Test Pretreat Thermal Serial - Functional Test 23.7 COmpletel CMP 6550 262624 Portable Hake Fire Extinguisher Wt COMPLIED WITH 04P G550 262624 Portable Halms Fre Estingubrier (Aft Ca0in) • Final Pease ReStOre Cabin) • Ara Pear Restore 23.8 Completed CMP 6550 262626 Portable Hake Fire Extingusher (AA COMPLIED WITH OW 6550 262626 Portable Ibbn Fre Extinwoher (AR Cabin) - Yeus Inspecbcn Ca0in) • VisuP Inspection 23.9 COS CMP 6550 262605 Portable Hokin Fire Extingtisher COMPLIED WITH 04P G550 262605 Portable Nolan Fre Ekinguisher (Cockpit) r Visual Inspection (Co pit) -lintel Inspection 23.10 CorrWeted CMP G550 262646 Portable Hake Foe Eslingusher (Aft lavatery) VIPS Inaptt0on COMPLIED WITH 04P 6550 262646 Portable Ibbn Fre Cetinje's:ler (Aft Lavatory) - Vaud !roped= 23.11 CON:AM 04P 6550 274202 HOreastat Roblin, Actuator - COMPLIED WITH 04P G550 274202 NoltOrtal Sobloer Actuator • Lubrication Lubicatron 23.12 Complete CMP 6550 282651 Mon Fuel Boost Pump (Left) Fuel Leak COMPLIED WITH 04P G550282651 Man Fuel Boost Pump (LA) - Fuel Leak Check Cheek rn 558064 Dee Cue 013/18 23.13 Completed 01P 6550 282652 Stan Fuel Boost Pump (Right) - Fuel Leak COMPLIED WITH OW 6550 282652 Man Fuel 800St Pump (Mont) • Fuel Le* Check Peck TY/ 558064 Date Cue 013/18 23.14 Completed 04P 6550 282653 Alternate Fuel Boost Pump (Left) Fuel COMPLIED WITH 04P G550 282653 Ntemate Fuel Boost Pump (Let) • Fuel Leak Check Leak Cried( 1W 558064 Date Cue 06/18 23.15 Completed 01P 6550 282654 Alternate Fuel Boost Reno (Right) Fuel COMPLIED WITH 04P G550 282654 Memate Fuel Boost Pump (rodit) - Fuel Leak Ole* Leak Cheek TY/ 558064 Date Cue 013/18 23.16 Open 04P 6550 322004 Nose Landing Gear. lubrication 23.17 Completed CMP 6550 323012 Landing Gear Emergency &tate COMPLIED WITH 04P GS50 323012 Landing Gear Emergency Extrusion Ntrogen Now-clown Bottle (Right) - Nitrogen Blenv-dorin Bonk (Right) - (INdrostatic) Functional Test (11ydrostabc) Functional Test 23.113 Completed 01P 6550 323911 Larding Gear EnteigenCy Catenate,' COMPLIED WITH 04P G550 323911 Lancing Gear Emergency Extension (Hoedown Bottle • General MRsal Inspector Bain:elm Beetle - General Visual Inspection 23.19 Completed CMP G550 335006 Ernergemy flocepath taring Battery COMPLIED WITH 04P G550 335006 Emergency /towpath Lighting Battery Peck (Deep Cycle) No. 1 - Functional Test Padc (Deep we) NO. 1 Functional Test (Brute) (Duce) 23.20 Completed 04P Gm 335007 EmergeneY MOO(Parn 1•10 009 Battery COMPLIED WITH CMP G550 335007 EmergenCYROWPMh DOWN Battery Pack (Deep WO NO. 2 • Functional Test Pack (DmP Cycle) No. 2 -Functional Test (13nme) (Bruce) 23.21 Completed CMP G550 335008 Emergency Horvath Lightng Battery COMPLIED WITH 04P GSSO 335003 Errergascy Flocrpath Lighting Battery Pack (Deep 000 Na 3 - Functional Test Pad( (Deep CYckg Ho. 3 Functional TeSt (Bruce) (Ouse) 23.22 Completed 04P 6550 351013 Oxygen Mask! Regulator (Omens) • COMPLIED WITH CMP 6550 351013 Oxygen Mask! Regulator (Observer) • Restore Restore 23.23 Completed CMP GSSO 351112 Crew Oxygen Mask and ReputIct COMPLIED WITH 04P GS50 351112 Crew Oxygen Mask and Regulate (Observer) - Detailed Inspection (Posner) Detaled Inspector 23.24 Completed 04P 6550 351212 Passenger Oxygen Bottle (No. 2) - COMPLIED WITH OW GSSO 351212 Passenger Oxygen Bottle (No. 2) (Ilydrostabc) Functional Test (Hvdrostatx) Finch :nal Ted 23.25 Completed 04P 6550 353004 Portable Ongen Bade NO. 1 • COMPLIED WITH PIP 6550 353004 Portable Oxygen Bottle Pin. I • Operatlonal Test Operational Test 23.26 Completed CMP G5S0 521007 Men Cebn Door Locks - Inspection COMPLIED MITI 04P 6550 521007 Stan Cabin Door Locks - Inspection 23.27 Completed CMP 6550 551109 Ibroontal StabiSzer Rub Blocks - General COMPLIED WITH 04P GSSO 5511091brierreal Stailikeer Rub Blocks - Genera Maki Inspection Visual Inspection 23.26 Completed 04P 6550 551110 Margate' RN/112er Rub BROS • COMPLIED WITH OW G550 551110 Horizon al stataaer Rub Doha • Fused:nal Test Fin:tonal Tat 23.29 Completed CMP GSSO 551111 Elevator Upper Swam- Deeded COMPLIED WITH CMP GSSO 551111 Elevate Upper Surface - Deleted inspection InSprittbn 23.30 Completed 04P 6550 783013 Thus Reverser Ground Relay (Left) - COMPLIED WITH 04P 6550 783013 ThrUSt RM.'S., Ground ROW (Left) • Operational Test Operational Test 23.31 Completed 04P 6550 783014 TNUP ReeerSer Ground Relay (Right) • COMPLIED WITH CMP 6550 783014 Thus( Reverser Giourcl ROW (I0500 • Operaticnal Test Operational Test 23.32 Waibng amoral CMP GSSO 920001 opereaben check package 12 month chedt 23.33 Wailing approval "" RELATED CODES "' Compiled will related cedes 0.1 23.34 Completed 04P 6550 262620 Fortatie Hobo Pre Extinguisher (Mt COMPLIED WITH CMP G550 262620 Port ale Koko Fre Extinguisher (Aft Cabin) • Removal / Installation Cabin) • Removal/ Installation 23.35 Completed CMP G550 335016 Emergency Flocepath Lighting Battery COMPLIED WITH 04F 6550 335016 Emergency /towpath Lighting Battery Pack No. 1- Removal / Instalation Pack Ho. 1 - Removal! Iretellabon 12013017 6:21:01 AM Gulfstream Proprietary Inbonnation Pate 23 of 210 EFTA00796584 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawky PP Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalin Elhaepanof RinokitIon Pet OFF & ON: 2013-BR St* OFF: 88662 SN ON: 012142 23.36 COm01Re0 09P G550 335017 En‘fgenCY ROOrpath Uctiting BatterY COMPLIED WITH CMP G550 335017 Emerpercymocepath UstiOng Battery Pack NO. 2 • Removal 11'194140M Pack No. 2 - Removal! Installabcn 23.37 Completed CMP G550 335018 Emergency flocepath Lighting Battery COMPLIED WITH CMP GSS0 335018 Emergency Flocepath Lighting Battery Pads No. 3 - Reeved / Instalatan Pack No. 3 Removal / Installation P14 OFF & 2013-BR St* OFF: 88660 St* Ott: 812143 23.38 Comokted 04P G550 235303 Oxygen mask Microchane (Observer) • COMPLIED WITH CMP G550 235303 Oxygen Mask Microcevone (Observer) • OPeraPOnal TeSt Operational Test 23.39 Completed CMP G550 351003 Oxygen Meek / Regulator (Costner) - COMPLIED WITH CMP GSS0 351003 Oxygen Mask / Regulator (Observer) - Fut.:nal Test FtrcUonal Test 23.40 Open 04P G550 351023 Crew Oxygen MaSk and Regulator Box 23.91 Open (Observer) Removal/ Iretalaten CMP G550 350001 Oxygen System Operabcnal Test 23.42 Completed CMP G550 351207 Passenger Oxygen Low•PleSSure Swtch • COMPLIED WITH CMP G550 351207 PPSSenger Ors9an Low•Pressure %Rea OPerdtlOnal TER Operational Test 23.93 Completed CMP GSSO 351222 Passenger Oxygen Cylrder (No. 2) - COMPLIED WITH CMP GSS0 351222 Passenger Oxygen Cylnder (No. 2) - Removal/ Installation Removal F Instalaticn 23.44 Open CAP G550 352003 PAX Orr SYS (ALITONAN; CPS CK MP Discrepancies related to Miscellaneous CMP Tasks (Exhibit 3) - (Ref. Item C 1.3 of Proposal 10. 7039702 R00) 24.1 Completed 24.2 Completed 24.3 Completed R/H EVAS aft Kixr moult screw spins freely. Ref 23.3 'rivet tad rtsciat. stab I/El rgii leading edge 2 Bruce Bads saiArl cap check and require rePlarment. Refer us terns 3).1 sy.1 33.1. 2S Raplaoa all Main ara NOP OM • (Ret Item C IS ot Proposal 1O$ 7039702 ROO) 25.1 In Progress 25.1.1 Completed Remo.r and ReclaCC all mon and nose landng gear tires. Rernmed man wriee (4) and Muted t0 back PraP . Rel items 11.58 Uru 11.61 it CUSTOMER PROPERTY OUT TO VENDOR 26.1 26.2 263 26.9 Completed Competed Completed Waiting 40(04 (1.1 SEND BLOW DOWN BOTTLE TO SUPPLIER FOR HYDROSTATIC TEST AND RETURN TO AIRCRAFT CUSTOMER PRCPERTY AC 5173 TN - N415L)1 REQUESTED RETURN DATE • 11/9 SEND 02 BOTTLE TO SUPPLIER TO COMPLY WITH HYDROSTATIC TEST AND RETURN TO AIRCRAFT CUSTOMER PROPERTY AC 5173 - N415LM REQUESTED RETURN DATE - 11/11 SEND 02 MASK TO SIAPPUER FOR RIESTORE/RECIERMY AND RETURN TO AIRCRAFT CUSTOMER PROPERTY AC 5173 1N - N415119 REQUESTED RETURN DATE 11/24 COMPLY WITH DRAWING 11595857976 REV. A (KM WEATHER) MODIFY PANEL PER SWG 11595157976 REV A. DRAWING ATTACHED CUSTOMER PROPERTY AC 5173 IN - N415LM REQUESTED RETURN DATE - 12/11 27 AIRCRAFT BATTERY (FR MA BATTERY I MAIN SHIP BATTERY) Competed 27.1 .1 Completed 27.1.2 Competed 27.1.3 Completed THE a 1 (RAH) MAIN AIRCRAFT BATTERY DUE CAPACITY CHECK / DEEP CYCLE. REF: 21.7 Inbound InSpeCtiOn Hidden Dermot Compete FM fans 8130-3 or equivalent. Verify Repair Upon further .mest.gation Nord P/H EVAS att upper manning screw to be Installed per recommended (swim° EVAS 107STC ORG Ph. 6064 Ret. E. Tighten nut as requred per ORG installation. No (other membrane required. Replaced twee nutplateS on UBleiOng edge per pint log:sum rev AQ. Ordered and seCleved New &We Batts. Ref Items 23.35 end 23.37 secieved 810w Down Battle Redeved 02 Bottle. Redeved 02 Mask PERFORMED CELL TO CASE LEAK CHEQC TORQUED UPPER HARDY/ARE. ( 113 IN. 185) COMPLIED WITH TIC CAPACITY CHECK! DEEP CYCLE PROCEDURES. BATTERY PASSEDCAPACITY CHECK. STROPPED BATTERY OUT OVERNIGHT (DEEP CYCLE). REMOVED SIICRTING SWAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES. CHECKED WATER LEVEL. SAFT CHM 24.3481 R/R•1 At/GI/ST 30. 1996 TORQUE WRENCH C/N 550298 CAL . DUE 09/2018 OHM CM 562947 a 562948 CAL. WE 04-Z018 inbound unperson envied non. N/A Issued appropriate fain and vs-ified certificate mother. 1205.2017 e11 Al AM Gulfstream Proprietary Inhumation Pape 2s of 210 EFTA00796585 Work Order: 5C521661 AC: 5173 STN: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Oiscespancv Resoludon Static., or kreign Authonty [edit:sten *enter. 27.1.4 Completed PERFORMED CELL TO CASE LEW CHECK TORQUED UPPER HARDWARE (113 Inch lbs). COMPLIED WITH CAPACTIY OIECX / DEEP CYCLE PROCEDURES. BATTERY FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT OVERSIGHT (DEEP CYCLE). SAFT 04M 24-34-01 R/R-1 AUG 30/96 TORQUE WRENCH C/N 550293 DUE CAL 09/2018 ooei C/N 562947 DUE CAL 0412018 CMM C/N 562948 DUE CAL 04/2018 27.1.5 Completed REMOVED SKATING SWAPS. SERVICED BATTERY. COMPLIED WITH THE 2ND CAPACITY 01E0(. BATTERY PASSED YNDCAMOTY CHECK. STRAPPED BATTERY OUT OVEItNIQO(DEFP CYCLE). sAIT Emit 24.34-01 R/13.1 AUGUST 30, 1596 28 AVIATION BATTERY TYPE - CORE (PCS nit& BATTERY B MAIN SNIP BATTERY) 28.1 Completed THE 2 MAIN AIRCRAFT BATTERY DUE CAPACITY CHECK / PERFORMED CELL TO CASE LEAX O4ECK. TORQUED UPPER HARDWARE. ( 113 IN. L85) COMPIJED WTTH THE DEEP CYCLE. CAPACITY 0180( 1 DEEP CYCE PROCEDURES. BATTERY PASSED CAPACITY CHECK. STRAPPED BATTERY OUT OVERNIGHT (DEEP CYCLE). REMOVED SHORTING STRAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES. REF: 21.8 CHECKED WATER LEVEL. SAFT CMM 24.3481 R/R•I AUGUST 30. 1996 TORQUE WRENCH C/N 550298 CAL DUE 09/2018 OHM C/N 562947 & 562948 CAL. WE 042018 28.1.1 Completed Inbound Inspect= Inbound Inspector. complied with. 28.1 .2 Completed mdden Damage N/A 28.1.3 COMPkted Complete FM Tam 8130.3 or eoPealent. Verify Repair !Med a0prOpra0e form and %verified <Mika° ',anger. Stabcw or Fenian Authonty Certilkstion *ants. 28.1.4 Completed PERFORMED CELL TO CASE LUX CHECK TORQUED UPPER HARDWARE (113 Inch lOs). COMPLIED WITH CAPACTIY 01E0( / DEEP CYCLE PROCEDURES. BATTERY FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT OVERNIGHT (DEEP CYCLE). SAFT 04M 24-34-01 R/R-1 AUG 30/96 TORQUE WRENCH C/N 550293 DUE CAL 0912018 OMIT C/N 562947 DUE CAL 0412018 CMM CAN 562948 DUE CAL 04/2018 28.1.5 Completed REMOVED SKIRTING SWAPS. SERVICED BATTERY. COMPLIED WITH THE 2ND CAPACITY 01E0(. BATTERY PASSED 2%0CAPACITY CHECK. SWAPPED BATTERY OUT OVERNIGHT(DEEP CYCLE). SAFT 0114 24.34-01 R/R.L AUGUST 30, 1996 29 PAIRING ASSY, BULLET, PWD 29.1 Ccrrpkted FwD BULLET FAIRING (KNEE PANEL) HAS EVIDENCE CF Repaired satcom raOome. Reference: Enfneedng also In step 29.2.1.1 Ord B>9 1159CSH52024 1/17/06 EROSIOII AT FWD EDGE AROUND FV/D EDGE AROUND Ergineerirg Osp05 in steps 29.3.8 plat 29.3.10. FY/0 LOOKING CAMERA AND A PUNCTURE INSIDE CS FAIRING. AREAS MAILED WIN BLUE GREASE PENCIL FWD BULLET FAIRING Part; ->1155C5H52024-405 IRAN PAD RETURN TO AIRCRAFT Sere .>N/A Final finish nil apply at Parvire cue,. CUSTOMER PROPERTY AC 5173 TN - N4ISLM REQUESTED RETURN DATE • 11117 29.1.1 Completed !nearing Inspecten Complied with Incoming Inspect:an. Part, ->1159C9452024-405 Sera ->N/A Mass/Mance Status >N/A Foreign Authaity Status —>N/A 29.1 .2 Completed Tearciorm N/A 29.1 .3 Completed Inspection Performed Usual nspecoon of sworn. reference B/P 1159C9152024 Rev. D Released 1/17/06. 29.1.4 Completed Rework Repaired satcom radome. Reference: Engneeing dace in step 29.2.1.1 and BAs 1159051152024 1/17/06 Engneenng dspos in steps 21.3.8 and 29.3.10. 29.1 .5 Complete0 ASSErnMy N/A 29.1 .6 Complete0 Test N/A 29.1.7 Completed Refir,sh Refinished as required. See steps beau. 29.1.7.1 Completed Made 14,Iar Made mykr for sate= for dnisco of gray aM white ccias (had no seen sealer separating cans) 29.1 7.2 Completed Apply 10P2.3 antistatic coating Prepped and sdvert washed. ReCGAMPS4122 Rev.B (06/29/17) appied 10P2.3 ana-stasc coating to repair areas only, batch a (8476182W2/8476154019)Rer:CAMPS3113 Rev.8 (10/17114), Expres 04/18 Mb-stabc test-N/A, (area to small to perform anti-static resistance died0 29.1.7.3 Completed sup-sand and prime with 3012 / D-8CO3 HI•Eksld ARP/ >Strip-SanSed old finish. Ref. GAMPSI000 Rev:GX04/13/17). 1092-3 Anti-Stabc,Re-pnme with 3012. >Malted for 3012 primer. Rd. B/P 1159CSH52024 Rev.V(01/17/06). >Apoled 3012 prrner. Rd. GAMPS3116 Rev:C(05/18/16). Br 115104/115105. Exp. Date 0431/2018 >Fooled D4003 Ref.GAMP53103 Rev.D109/17ton. D-8003 Base Bata* TE3887UF Exp. Date 05/31/2020. D-9001 Converter Bata* TC2224UF Exp.Date 03/3112019. >Sanded D8003 smooth. Ref. GAMPS4000 Rev.'G(O4/13/17). >Rooted 10P2-3 MU•SUtic al tner.Ref. GAMES3113 Rev.'B(1O/07/14). lon.3 Mb-State base Batdvt 84770320S8ExpiNste 03/30/2018. 1.115,2017 4;21:0, AM Gulfstream Proprietary Information het 24,429 EFTA00796586 Work Order: SC521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown Squawks: Yeiblu = Newly Added Rens Green = Changed Items (Ready for inspection or completed) from previous day (or slice Friday on Mondays) Assoc Stalin I Discrepancy EC-110 Owing Solution Bath* 8477032055 Es p. Date 03130/20/8 (See step 29.1.7.4 for test) >Re-Prkned with 3012. Ref. GAMPS3116 Revr(05/18/16). Batelle 115100/115105. Op. Date04/31/2018. 29.1.7.0 Competed POPE 10P2.3 MU-State, Perram rEStievIty test. >noosed 1%2.3 Prellatk. Ref. GA1,53303 Rev.W(03/18/09). >Performed resistivity diack.All readings ,we acceptabk. Meter* 563023 Wert Date 05/18. 29.1.8 Completed Oulgerg Imagery Compiled with Ortgong Imagery requirements fart will return to service center. 29.2 Completed Erosion along the leadng edge and dherter strips. Repaired erosion along the leading edge end replaced all overt strips. Reference: Engineering dspo in step 29.2.1.1 and Bole 1159CS-I52074 Rev. D.I.f17/06 29.2.1 Completed Request engineering evaluation for repair of erosion. SEE ENGINEERING DISPO STEP 29.2.1.1 29.2.1.1 Completed Engineerro dsposten: MRS E391 Remove lartring dverter end breast ea mond. Said eroded areas SmtOth. With covarrence from T. Sutherland, Daiwa Scuff sand minimum 1.50in sound seas to be repaired, reinceing allglossy surfaces, to prepse For wet layup. Fabricate two pies using dies of 161/181COle dv fiberglass cloth. Sue plies to ensure coverage of eroded and sanded region. Ply al *mold extend at least 1.03n teysd the reworked area and Ply #2 Snead edend at least .50In beyond Ply PI, except pries may end at edge of part where arsecalate. Saturate Plies! and 2 tee, 9104Epon 828/DTA Or HySial EA.956A/8 mixed per manufacture's insbudism. lay to rework and with Ply t I and Ply *2 ensuring adequate overlap as toedlien above. Cure plies under vacuum tog a 75-9,F for at least 12 hairs, or under vacuum bag at 7S-9PP for a 2-3 houn Mowed by 3 NYS at 130-140'F. Remove vacuum bag ard said smooth. Visudly inspect reworked area; if reputed, fill and far using land EA960F and sand to contour. If required, imtdl belting dhorter as desabed babe,. Touch tp was pruner and paint to match customer tOPCOat. as required. Lightning {limner . instaltation: Prepare surface to be bonded Per GAWPS 8210: scuff Sand Men solvent woe web MK or aortore fellorectl by IsoPoPTI alcohol. Apply GMIOOBDI0 Or GAA1008D03 Weser° and posi00n ovens per 1159CS1r52024. Cure under vacuum bag for days at room temperature, or 2.3 hays at room temperature motored by 2 hours at 130-140'F. 29.22 Oxrpeted REMOVED PAINT/PRIMER Real DISCREPANT FV/D MEM EFON 828 AND SOLVENT CLEANED. THEN FABRICATED MO BATCH* DP7C1613/1737GG Om 3f31/18 INSTALLED 2 PLIES OF STYLE 181 FIBERGLASS WET USING DTA EPON 8281DTA VACUUM BAGGED AND CURED. PEE LOTS /78530026 W 2/16/18 ENGDNEERING DISPO STEP 29.2.1.1 29.2-3 Coiredered Removed and replaceda don stma(PM PR1436-G BATCM*1043011 0717 SIP:10 APR 2016. LSSQW00-0460). Reference: 8/P 1159all52024 Rev. 0 Released 1/17/06. 29.3 Canpreted Rinehart on Ullirner steam Repaired puncture on UH inner steface. Reference: Engineering dispas in steps 29.38 and 29.3.10. 29.3.1 Ccmpleted Request engineering evaluation for reper of inner gin See step 29.3.3 for engineering deposition. Pundure. 29.32 Completed Request NOT to oaken tap test of inner sten puncture. NDT pa-formed tap test nspectico on inner skin puncture per GC RDTP 2.1 No distend feted outside Me puncture area visibly seen/noted See files tab for pit and location of puncture 29.33 Ccmpleted Preliminary Err :erne Capasiten: Refer to pie n the lies" tab for mewed location d contact area. Place a soft eanCreSSible material (day. reporubber, etc -1 mat will mum ICKatien and Merlin t pis is the contact area. Install fwd bullet hums sal attach with EtO had.vare. Remove fairing and take pia a suspect contact area. Resubmit pia via COM*, tO engineering for evaluation. MR8 NO. E064 29.3.4 Completed Per amnionsy engineerng dspostion placed a sat compressible material (repro-rubber) an the contact area. Installed fad tulet laming and math Aim B/P hardware. Rummel fairing and took pics of suspect contact aie). Resubmitted pia to engineering. 29.3 .5 Completed Preliminary &sneering Cisoosition: Refer to plc in the' ales- tat dell a l43. 30 at tne location shown. Take a measurement from the Inner surface of outer son to the cuter surface of inner skn. Rewtont results to ergneering for Final disposition. MRS No. E064 29.35 Completed Resubmit engneenng alter measurement from tee Inner See step 29.3.7 Ice engineering disco. surface of outer Edo to the otter surface of inner sbn I2JI 6:2I:01AM Gulfstream Proprietary Information Pea i .to EFTA00796587 Work Order: SCS21661 AC: 5173 STM: Chart Thomas SCC: Julian Brown &mewls: AP Yellow = Newly Added Items. Green = Changed Items (Ready for inspedion or completed) from previous day (or since Friday on Mondays) j Dawn i Maths 29.3.7 Coritisted 29.3.8 Coapkted 29.3.9 COMOSeted 29.3 10 COmpleted Diserepancy is .210" Preliminary Engineenso Ospasibo-c Refer to attachment in me "Riles" tan: uslro the smallest clean updiameter, represented by me red dash line. Van out the discrepant secten of inner OM and associated =ft clown to the bond surface of outer skin. Do not undo:reit the outer dun or Incorporate core ramp at me time. measure, Oxument. and festival resulting dean to Ole. MRS (064 Final Engineering Deposition: Rework per Steps 1 Oyu 13. NOTE Steps 9 lieu 13 are Fr, 29.3.9. Cutout of the inner gun and cue removal 5 accotable. ProCeed win feif Ming rework: 1. Refer to 'Ttles' Pcwerpoint attadunent Section AMA 29.3.7. Incorporate core ramp that startS *OM edge of cutout extencing 25 t0 35 .nches Word cutout. At me lower CCP it is acceptable for the denier to extend onto the sold laminate. 2. Straighten out Wiled Over COM oils and rernOve 10060 COS. Vacuum Out dtrIS 3. Pot core ramp with Magnctond 68-3. Cured 70 to 95F unit eating Ass a harden surface. DO not touch sanded c.uraces with bare hands wear dean cotton glaRes. 1. Sohrent dean using hen cheesecloth vipers wet with HEX cc Isopeopil Alcor°, an e- ea cuendng at least IS Inches beyond Cutart or to EOP. adacnever Is COW. Contnue until wipers reman dean. Do not use synthetic Or shop towel caper rnsterkis. Also solvent dam a corresponIng a ea On outer stin. 5, Sand off excess potting. Sand Inner tong strface to remove are stubble and any glassy suface finely also =bend sandng aroerd din alert ors an area extending Iron lower EOP or at least 2.0 rches beycod edge cr cutout to expose me outer fiberglass (F/G) pat. Vacuum out debris. Traces ci pent. Primer, etc. remaining within the FIG weave shall be erceptable. 6. Sand Correspond Outer skin surface In tne sang way. 7. On inner skin add two piles of dry Stile 181 (FM). Odertabcn of bath pies is °phenol. It acs acceptable to dot F/G to afar workeg cut winkles. Stagger darts so they do DX overlap onto each other. Saturated pries wain Eon 8281 DTA Or EA956 Aft3. Refer to SRM 51.34.60 Table I and SRM 51078.10 Repel' Technique 7. B. Refers Files tab in 293.7. Ply 1 :Nil crreslap .50 to .80 Inds caste the lore surface. Ply 2 gal overlap PH I by .50 to .80 Inches. Ospasibcn continues in 293.9 MRB No. (061 Final Engineering D6POStien Continued from 29.3.8, 9. On outer surface edd like dies centered met cutout. 10, Distal a breather Pact 000 ‘rd(uum 049, rerer t0 Sel451-78-10 Repair Rehrictie 8. Perform a vacuum leak chedc by piling fUl vacuum Orin 21 inches of Hg) until bag is pulled tight. Disconnect varnarn saute andverify max leakage rate ODes not mewl 5 Indies Of Hg Winn 5 mnutes. II. are at 70 to 95F until adhesive gdsvAik.ls should take at had 4 hours. 12. A/ter cure remove bag and sand off excess agnethe and F/G. Tap test outer and Inner gal within repair area 10 very no voidsand /or &bands edit. Aso visually verify no ply separations exist. 13. On outer striateapply Frnish 3012 (CAMPS 3116) (donee by anti-static paint and customer topcoat Ensure appled anb.static pant overlaps onto the existing anti-state part On ruler surface no finish S reputed triers dry surfaces edst and II so apply Finish 3012 to entire repawed Surface. This is a minor repair. MRS No. E060 Made <cavern? and potted core web Inagnobond 68.3. Cured at 70 ton until potting has a harden surface. Solvent clamed, carded cif ewes potting. Sat freer to-el surface and extend sanded around skin cutout crier an area. On inner and Wet Pun added two plies a cirY Ayle 181 (F/G). Saturated Dies with (pen 828 / DTA. Install vacuum bag, perfumed a vacuum halt check and cured at 70 to 95F. Me, cured remove bag and sand off excess adneshe anti F/G. Tap tested outer and Inner stin wire, repay area to vented no vokls and for Ostenth edit. Also visually verified no ply operatians exist. Work reference:Engineering disco in steps 29.38 and 29.3.10. 30 Addition of a SHADE MASTER at the Right•Hand a2 VIP Seat - (Ref. Item 8 1.1 of Proposal 10e703856S ROO ) 30.1 Open Adeliaon or a SHADE MASTER at the Rgnt.itirtl P2 VIP Seat The existing rigtt-hand *2 forward VIP meth panel will be removed and a new panel Math SHADE MASTER runctionarny Installed. FeitOsling panel replacement, tne Ca0n Management System (04$) software wit be updated and a ReookidOn DISpOSIOOn 013rdnated wtht White (Stress). Repair Is acceptable. Reference 11579. EPON 828: MFG batch0:0P7C1613 UP: 31 MAR 2018 0Tk MFG MON: 550 EW:02/16/2018 1205,2017 0:21:GIAM Gulfs:beam Proprietary ItiormatiOn Par 26ot:9 EFTA00796588 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julen Brown Squat Ali Yellow = Newly Added Items Green = Changed Rem (Ready for inspection or completed) from previous day (or slice Friday on Mondays) Assoc Stains 30.1.1 In Progress 30.1 .2 open 30.1.3 Open 30.1.4 Open 30.1.5 open 31 31.1 Completed 31.1.1 Completed 31.1 .2 Completed 31.1.3 Completed 31.1.4 Completed 33 32.1 COminete0 32.1.1 Completed 32.1 .2 Completed 32.1 .3 Completed 32.1.4 Completed 32.2 Completed 33 33.1 Completed 33.1.1 Completed 33.1 .2 Completed 33.1 .3 Completed 33.1.4 Completed Dkvalpanof system operational died( pertained. New Components: One (1)4Typa Switch Panel 2 x II - ROCA:well COMM Moaned Components: Cabin Management System Software - Rodoyell Conn, Certification: This modficaticre veil be approved as a rnapr alteration, and documented on an FM 337. Notes: The remand panel wil be returned to the creamer for use as a spare at the aft VIP seat location. System repairs are not Included and if required wrotkl be addressed on a tine aid material bags. Muna Engineering Later Re urb Custom Engineering Cert tabor Retort, AVI Systems Test Labor Crily AN fElectncal Labor ClrOy Inspection Labor Criy SATIMY, EMERIMICY Cornell, with y Floorpath lighting Battery Fade (Deep Cycle) No. 1 - Function Test Ref: 23.19 Inbound Inspection Hidden Damage Complete FM fans 8130-3 or equivalent. Verify Repair Stabco or ration Authonty Certification banter. Inspected unit. Performed Deep Cycle/Cap Oncit accordance WIN BRUCE CHM 33.21-70 Rev (5) dated May IC 2036. Krimurn required ctscharge time a 15:00. int FALLS to meet maintenance spec with dadarge tine of 7:57. Ra0ed art on 16 hour slow charge. Sexed copeck), test to be conducted II/10/17. 563440420:8 CN BATTERY, EMERGENCY LIGHTS Comply s•IM Emergency Haan:earn Ughtrg Battery Path (Deep Cycle) No. 2 - Fond:coal Test Ref: 23.20 Inbound Impact= HOC% Damage Convict° FM ionn 8130-3 or %%Patent. Witty Repair Staten or ration Authonty Certification Hinter. Inspected unit. Perfomied Deep 0,de/Cap =beds in ateordaree wiM BRUCE CHM 33.21.70 Rev (5) dated May 16, 2036. NO faults found. harimum required discharge tine is 15:00. Unit oasts maintenance specs wandischarge tine of 18:22. Slated unit an 16 hour Om charge. CM 5634404/2018 •••VOID•••O4P G550 324033 Mon Tire Assembly (Left Inboard) Inspection SATIERY, EMERGENCY LIGHTS Corry with Erntrgcncr noorpslh Lsrtng Battery Pei (Deep Cycle) No. 3 functional Tex Ref: 23.21 Inbound Inspacten Hidden Damage Complete FM form 8130-3 or equNalent. Verify Repair Stnocn or Foreign Authonty Certification banter. Inspected unit. Performed Deep 0,tle/Cap Ole& in accordance with BRUCE CINM 33.21-70 Rev (5) dated May 16, 2036. Marcum required Ostharge Ome is 15:00. Lint FAGS to meet maintenance spec with dadarge tine of 7:54. Hated ant on 16 hem slow charge. Second capaoly test to Oeoaductea 11/10/17. cal 5614404/2018 34 MAIN WHEEL ASSEMBLY 34.1 Completed RaITE TO BACK 940P FOR TIRE 0W4GE, BEAD SEAT AND NOT. INSPECT BEARING AND PACK CUSTOMER PROPERTY AC 5173 1N - N4151.M REQUESTED RETURN DATE 12/4 Remiudon Performed visual inspection. Seep and Performed second capaoty °Ned'. Unit FAILED opacity check withdischarge brie of 5:42. Unit DOES NOT meet marterence specs LAW: Bruce 33-21-70 MAINT MANUAL, REV S, DATED 5/16/2006. Reeternmend Scrapping or to Return to Vendor. CN 563440 4/2018 Inbound InspecOon compiied with. N/A No 8130-3 or equvalent wit be issued. insprsTed unit. Patterned Deeo CycleiCap Deck m accordance with BRUCE CNN 33-21.70 Rev (5) dated May 16, 2005. No faults found. Minirrun roweddischarge time is 15:00. Unt meets maintenance specs with discharge time of 18:22. CN 5634404/2018 Inbound Inure:ten complied with. N/A Hand appropriate loan and rained <stoical° nattier. •••VDID•••DLplate of 11.69 Performed visual nit:attn. Sean and Performed send capacity diedc Unit FAILED capacity deck with discharge brie of 9:57. Unit DOES NOT not mantensce specs LAW: Bruce 33-21-70 MANI ItahUAL, REV S, DATED 5/16/2006. Remnant' Scrapping or to Return to venoce. CN 563440 4/2018 Inbound Inspection complied with. N/A Ito 8130-3 a eotivaient wit be issued REPAIRED! NOT MAIN WHEEL/TIRE ASSEMBLY REF. DunlOp 01414 32-44-02, REY.14, Ca. 28, 2016, TR 3V13 DTD 11/03/17, SAM 3249-99 REV. 3 DTD. 04/28/2015, AND &P 115906003 REV. DTD. 2/202039. P/N 11591.56001-9 5/N 5159FX TSN WA 150 WA CSN WA co Na. MOUNTED NEW TIRE P/N 1159SCIS06-1(390K02-1) SM 72015604 ON YMEEL NUB ASSY. PM 1159503034 S/N 12/1502017 6:21:O1AM Cul/stream Proprietary Information Part 276126 EFTA00796589 Work Order: SC521661 AC: 5173 STM: Charles Thomas BCC: Julian Brown Squawkin au Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalin 34.1.1 Completed 34.1.2 Completed 34.1 .3 Completed 34.1.4 Completed 34.1.5 Como/Bed 34.1.6 Completed 34.1.7 Completed 34.1.8 Completed 34.2 Completed 35 35.1 Completed 35.1.1 Completed 35.12 ComoNted 35.1.3 Completed 35.1.4 COM /KW 35.1.5 Completed 35.1.6 ComoNted 35,1.7 CenDIKW 35.1.8 Completed 35.2 Completed 36 36.1 Competed 36.1.1 Comokted 36.1.2 Completed Micrqsanoir INCOMING INSPECTION 7DACOWN BISECTION NOT ASSEMBLY TEST CLEM/. INSPECT, PACK AND 'ASTMS BEARINGS DEFLATE FOR SHIPPING AND STORAGE REMOVE OLD TIRE S/N 52243136 AND MOUNT HEW TIRE. MAIN WHEEL ASSEMBLY ROUTE TO RACK SHOP FOR TIRE CHAN(E, BEAD SEAT AND NOT. INSPECT BEARING AND PACK CUSTOMER PROPERTY AC 5173 TN • 3/915111 REQUESTED RETURN DATE 12/4 INCOMING INSPECTION MAROON N INSPECTION MDT ASSEMBLY TEST CLEM, INSPECT. PACK MID INSTALL BEARINGS DEFLATE FOR SHIPPING MO STORAGE REMOVE OLD TIRE S/N 60293134 AND MOUNT NEW TIRE. MAIN WHIM. ASSEMBLY ROUTE TO BACK SHOP FOR TIRE CHANGE, BEAD SEAT AND NOT. INSPECT BEARING MD PACK CUSTOMER PRCPERTY AC 5173 TN - N415/14 REQUESTED RETURN DATE 12/4 INCOMING INSPECTION TEARCOWN Resolution SI 59Px. TOTE TO INSTALLER • THIS ASSEMBLY ONLY CONTAINS A STORAGE NITROGEN PRESSURE OF 90 PSI. UPON ITISTALLAIlON OF THISASSEMBLY ENSURE THAT IT IS PROPERLY SERVICED PER THE APPLICABLE AIRCRAFT MAINTENANCE MANUAL Complied with looming Smothen; MAIN VERDI AND TIRE ASSY. Parte a 1159L56003-9 Serials > .. 5159FX Tea-Conn Complied with ref. Dollop CMM 324442, REV.14, OCT. 20, 2016, TR 32-13 DID 11/03/17. TIRE CHANGE AND BEAD SEAT NOT ONLY. Conned with Tel. Dulloo CMM 32.44.42, REV.14, OCT. 28, 2016, IR 32.13 DTD 11/03/17. NDT performed Eddy Current Inspection cn BEAD SEAT Per CAC hOTP 3.0 Rey.] No Credo Noted. EQUOMent UH/O: NO N SODS 561194 Cal Due 12/17, ECM SW. 560706 Assembled N4. Duritip CMM 324442, REV.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17. Complied with re. Combo CMM 3244-42, REV.14, OCT. 29.2016• TR 32-13 DID 11/133/17. N3 LENS NOTED. VERIFIED USING HAND 1ELD GAUGE 565789 CALIBRATION DUE DATE 02/2018. ON TEST 9:00AM ON 12/2/2017 OFF TEST 9.30AM ON 12)3/2017 Complied with ref. Dunlop CMM 3244-42, REV.14, OCT. yty. X116• TR 32-13 DID 11/03/17. SEE STEPS BELOW OERSTED FOR SHIPPINGAND STORAGE MOUNTED NEW TIRE P/N 115950306.1, (350(02.1) SA 72015604 ON MAIN WHEEL P/N 11599:L503-9 SAP 51551FX Complied with ref. Eltetp CMM 3244-42, REV.14, OCT. a 2016, TR 32-13 DID 11/133/17. REPAIRED! NDT MANN WHEEL/TIRE ASSEMBLY REF. Dump OM 324442, REV.14, OCT. 28, 2016,18 32-13 DTI) 1I/03/17, SPM 3249-99 REV. 3 DTD. 09/211/2015, AND 8/P 11592/56003 REV. m." DID. 2/26/2039. P/N 11591.56003.7 5/N 5167FP TSN WA T50 N/A 0N WA 00 WA MOUNTED NEW TIRE P/N 115950.506-1(350K02-1) S/N 7201559B ON WHEEL MN ASSY. P/N 1159SO-503.7 SIN 5167W. NOTE TO INSTALLER - THIS ASSEMBLY OILY 03NTAINS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON INSTALLATION OF THISASSEMBLY cresE THAT IT IS PROPERLY SERVICEDPER THE APPLICABLE AIRCRAFT MAINTENANCE MANUAL. Complied with Incoming Inspectran; MAIN WHEEL NO TIRE ASSY. Pan*------>I1S9LS6003-7 Serial; a 5167W TeaNkrAm Complied with rel. Onto 04/4 32.44-42, REV.14, OCT. 28, 2016. TR 3213 DID 11/03/17. TIRE CHWIGE AND BEAD SEAT NOT ONLY. Complied with ref. Dunlop CMM 3244-42, REV.I4, OCT. 28, 2016, TR 32-13 DID 11/133/17. NOT performed Eddy Current inspecuon an BEAD SEAT per GAG NDTP 3.0 Rev.? NO Dade Noted. 0:Bement Used: Nolte 5005 561194 CS Due 12/17, ECM SW. 560706 Assembled ref. Dunlop CMM 32-99-92, REV.I.4, OCT. 22, 2016,1R 32-13 DID 11/03/17. Complied with re. 00,100 CMM 324442. REVS., OCT. 28, 2016, TR 32.13 DTD 11/03/17. AO LEAKS NOTED. VERIFIED USING HAND HEW GAUGE 565789 CALIBRATION DUE DATE 02/2018. ON TEST 9:00AM ON 12/2/2017 OFF TEST 9:30AM ON 12/3/2017 Conned with rel. Dumloo CMM 32-44-42, REV.14, OCT. 28, 2016, IR 32.13 DTD 11/03/17. SEE STEPS BELOW OERSTED FOR SHIPPING MO STORAGE MOUNTED NEW TIRE P/N 115950306.1, (350012.1) SIN 72015598 ON MAIN WHEEL P/N 1159SCL503-7 S/N 5167W Complied with rel. Onto CMM 3244-42, REV.14, OCT. 28, 2016,18 32.13 DTD 11/03/17. REPAIRED / NDT MAIN WHEEL/TIRE ASSEMBLY REF. Doric, OM 32-99-92, REV.14, OCT. 28, 2016, TR 32-13 DTD 11/03/17. SPM 324949 REV. 3 DM. 04/2B/2015. AND 8/P /159156003 REV. *.' DTD. 2/26/009. P/N 1159L56003-9 S/N 5175GC TSN WA ISO WA ON N/A C93 N/A MOUNTED NEW TIRE P/N 115950.506.1(350K02-1) 5/N 71665589 ON WHEEL BRA ASSY. PM 11556CL5031 SON 517SGC. NOTE TO INSTALLER • THIS ASSEMBLY014Y CONTAINS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON INSTALLATION OF THIS ASSEMBLY ENSURE THAT IT IS PROPERLY SERVICED PER THE APPLICABLE AIRCRAFT MAINTENANCE MANUAL Compiled with Warring Inspeda3n; MAIN WHEEL Alt TIRE ASSY. Perte••-•••>1159L56003-9 Seriele--> 517SGC Teardown Complied with ref. Coto 0414 324442, REV.14, OCT. a 2016, TR 32-13 DID 11/03/17. TIRE CHANGE MID BEAD SEAT NOT ONLY. 12/11.2017 6:21:01AM Gulfstreorn Proprietary Infonaation Par nets EFTA00796590 Work Order: 5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian &Own &wads ail Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from pevious day (or since Friday on Mondays) Ian Shan I 36.13 Cempleted 36.1.1 Completed 36.13 Completed 36.1.6 Completed 36.1.7 Comoh:ted 36.1A Comoh:ted 36.2 Completed 37 37.1 Carolded 37.1.1 Completed 37.1.2 Completed 37.1.3 Comoeted 37.1.4 Complied 37.1.5 Comoeted 37.1.6 Completed 37.1.7 Completed 37.1.8 Completed 37.2 Comoeted Discrepancy INSPECTION NOT ASSEMBLY TEST CLEAN, INSPECT. PACK AND INSTALL BEARINGS DEFLATE FCR SHIPPING AND STORAGE REMOVE OLD TIRE SfN 52543193 AND MOUNT NEW TIRE. MAIN WHEEL ASSEMBLY ROJTE TO SECA Su:bi-:* TRC CMANCS. AND NOT. INSPECT BEARING AND PACK BEAD SEAT REPAIRED f NDT MAIN 11/)3/17, SPM 32-4949 P/N 1159L56003-7 CUSTOMER PROPERTY AC 5173 III 7/4151M 5/N 5188FP TSN WA ISO N/A REQUESTED RETURN DATE 12/4 GSA WA CSO WA MOUNTED NEW TIRE P/N 5188FP. NOTE TO INSTALLER • THIS INSTALLATION OF THIS MARGENANCE MANUAL ateedudon Camp0ed with M. Dist* CNN 32-44-42, PEVA% OCT. 28, 2016, TR 32-13 DID 11/03117. NOT performed Eddy Current Inspection on BEAD SEAT pa GAC NOIR 3.0 Rey.] 110 OROS Wed. Ecuoment MACS 5005 561194 Cal Due 12/17, ECM SW. 560706 Assembled ref. Durlep 0461 324942, REV.14, OCT. 28, 2016, TR 32-13 DTD 11/03/17. Complied with ref. Domlop CMM 32-44-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03117. It LEAPS NOTED. VERIFIED USING HMO HELD GAUGE 565789 CALIBRATICM DUE DATE 02/2018. ON TEST 9:00AM ON 1V7/2017 OFF TEST 9.30AM ON 12/3/2017 Complied with itt. MAW CMM 32-44-42 REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17. SEE STEPS BELOW DEBUTED FCR SHIPPING MO STORAGE MOUNTED NEW TIRE P/N 115950.506-1, (3501(02-1) SIN 71865589 ON MAIN WHEEL P/N 1159SCL503-9 S/N 517SGC comcom nen mi. Da to CMM 3244-42, REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17. INCOMING INSPECTION TEARCOWN INSPECTION NOT ASSEMBLY TEST CLEM. INSPECT, PACK AND INSTALL BEARINGS DEFLATE FCR SHIPPING AND STORAGE REMOVE OLD TIRE S/N 60323055 AND MOUNT NEW TIRE WHEEIJ1IRE ASSEMBLY REF. Dunlop OW 32-99-92, REV.14, OCT. 28, 2016,1R 32-13 DTD REV. 3 DTD. 09/28/2015, MO B/P 11591.56003 REV. DTD. 2/26/2039. 11595CL506-1(350K02-1) 5/N 71925582 ON WHEEL HUB ASSY. P/N 11595CL503.7 SM ASSEMBLY ONLY 03NTABIS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON ASSEMBLY ENSURE DIRT IT 15 PRCRERLY SERVICED PER THE AMICABLE AIRCRAFT Complied wiles Incoming Inspecban; MAIN WHEEL MO TIRE ASSY. Pane 1159L56003-7 Serials a .. 51e8FP TerdoAn Complied with ref. Otrdcp OM 3244-42, REV.14, OUT. 28, 2016, TR 32-13 DID 11/03/17. TIRE OUNCE AND BEAD SEAT NDT ONLY. OXMAN with rel. WINO CMM 324442, REV.14, OCT. 28, 2016,1R 32.13 DID 11/03/17. NOT mrformed Eddy Current Ineped1On 0m BEAD SEAT per GAC NDTP 3.0 Rev.7 No Gees Meted. Ecitgrnet Used: Nortee 5005 561194 Cal Due 12/17, EON Std. 560706 AMMONS ref. Dunlop, 004 324942 REV.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17. Candied with ref. Dtnbp CMM 3244-42, REV.11, OCT.* 2016, TR 32-13 DID 11/03/17. It !EARS NOTED. VERIFIED USING HAND ISO GAUGE 565789 CALIBRATICM DUE DATE 02/2018. ON TEST 9:00N9 ON 12/2/2017 OFF TEST 9.30AM CM 12/3/2017 Complied will, ref. Dollop CMM 3244-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03/17. SEE STEPS BELOW DEMATED FOR SHIPPINGMO STORAGE MOUNTED NEV/ TIRE P/N 115960506.1, (35D(02.I) 5/N 71925582 ON MAIN WHEEL P/N 115950366-7 WV 5181PP Complied with ref. Dunlop CMM 32-44-42, REV.14, OCT. 22, 2016, TR 32-13 DID 11/03117. 12/13)7017 6:21:01AM Gulfstream Proprietary Information Posy 290129 EFTA00796591

Technical Artifacts (140)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Flight #AC120
Flight #AC43
Flight #AC5173
Flight #AF7
Flight #LH680
Phone1 4290267
Phone12013017
Phone1205.2017
Phone12102011
Phone12152017
Phone14304001359
Phone14304001381
Phone14304001382
Phone14304001405
Phone14304001407
Phone14304001408
Phone15050250
Phone15906003
Phone15950306
Phone15950366
Phone15960506
Phone15965201741
Phone16706101
Phone2243136
Phone2543193
Phone281-1425
Phone3000090
Phone3000091
Phone3000092
Phone3000093
Phone3001004
Phone3001084
Phone3001139
Phone3030053
Phone3112019
Phone3440420
Phone4001349
Phone4001351
Phone4001379
Phone4001380
Phone4001381
Phone4001382
Phone4001383
Phone4001405
Phone4001407
Phone4001408
Phone4001409
Phone4001492
Phone4001496
Phone4030069
Phone4290002
Phone4304001351
Phone4304001379
Phone4304001383
Phone4352014
Phone4468001411
Phone4804024006
Phone4805001267
Phone4806002351
Phone506238.2022
Phone5157976
Phone5300301
Phone550 2563
Phone550 2733
Phone550-2009
Phone5524220
Phone5541985
Phone5547985
Phone5557976
Phone5557977
Phone5582318
Phone5614404
Phone5634404
Phone5847985
Phone5847986
Phone5857010
Phone5857083
Phone5857976
Phone6030509
Phone7021852
Phone7028140
Phone7031235
Phone7031236
Phone7037336
Phone7037536
Phone7038248
Phone7039407
Phone7039702
Phone7092716
Phone7100111
Phone7700395
Phone8000312
Phone8001411
Phone8001549
Phone8001557
Phone8007001
Phone8031549
Phone8031557
Phone8040001
Phone8080720
Phone8476154019
Phone8477032055
Phone8528041000
Phone8530026
Phone9000032
Phone9000037
Phone9001791
Phone9055420
Phone912-965-4178
Phone9125363
Phone9152024
Phone9156003
Phone9352095
Phone9452024
Phone9503034
Phone9584790525
Phone9584795
Phone9651110
Phone9652017
Phone9851019
Phone9851110
Phone9851419
Phone9852017
SWIFT/BICCOMPLIED
SWIFT/BICENSURING
Tail #N415
Tail #N4151
Tail #N415L
Tail #N415LM
Wire RefREFERENCE
Wire RefRef 506238
Wire RefReference
Wire RefRefinished
Wire RefWIRE HARNESS
Wire RefWIRE ROOTING
Wire RefWIRE ROUTING
Wire Refreference
Wire Refrefurbeshment
Wire Refrefurbshe0

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.