Case File
efta-efta00796563DOJ Data Set 9OtherWork Order:
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00796563
Pages
29
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Discrepancy
Resoludon
1
1.1
',WAN
al:OrOY4
1.2
In
FrotYrds
1.2.1
Completed
1.2.2
Open
1.3
Waiting
approval
a.)
1.4
Completed
1.4.1
Completed
1.4.2
Completed
1.5
Waiting
alnroyal
0.1
1.6
Completed
1.7
Completed
Id
Completed
1.9
Completed
1.10
Completed
1.11
Completed
1.12
Completed
1.13
Completed
1.14
Completed
airfnmeGuirstreeas GSSO
Complied with Intoundrivellminary Inspection as per RSQCT 57 rev 24
Complied with creflight impectlon as outlined in RSQCT-113 Rev. 23
Complied with Debrief drecklaL
Part 91.409 f(3). No other spe0al ckaimentation requests.
Provided tod clearer= per SOP 1028, all teals eanunted for
Covered and PIOteCted as required
Told serviced JAW the ground Fending and servicing handbock 14-00-00
00mPlete WM interior Inbotrel InSPeCtianGA 3564 (CG) 5/17 and oleo
Compiled with Sample Myra-al/lc Ru105
Secured by customer icon arrival
Complied with Service Team Manager Chectist
Informalfon Cnly.
Compiled wile SIN Quality review 0l work order and tobook entry griOr to decorate
Tonto as required
N/A no hatmdt to be loaded.
For NUM purposes on,F.
Return To Service
IntoundfOutbaurd Impectnn
IntOundtPrellminary IIMDECti3n
Outbound IngoteU0n
Preflight Inspection
CoraPN with Petrie( Oncklat
ArriyaVDebref 90 Day De List Review ACCCOWielle
List Cs:orator's Airworthiness Requirements &Simnel
Documentadon RequeStS
Tool Clearance
Cover & Protect
Service Channel Toilet/0ton Galley
AfrivaVDeParkre ASSISI & ,Ade0 Mot
Sample RIO-attic Fluids
Remote Valuables & Secure.
Comply with Service Team Manager CheckIst
Fluids Used (011s/9wdroll • (Materials OrrY)
STM Quality review 0l work order and ke/b00k entry CriOr
to departure
Towing (Does not include Hangar Mores)
1.15
Completed Hazmat - Identey &provide a manifest, and a SritnerS
Declaration for Darger0us GOOCIS for all bawdous materials
that are loaded aboard any airaaR.
FAR Fin 1210r 135 gaeratOrs x111 piovile a hazardous
material notinatein letter reputed by FAR 135.505 (e) pax
to mantereree at Ohs Repair Station kw FAR 145.206 (a)
(b).
If there b to be loading of hazardous matelots t shall be
complied with by llama trained autheized GAC cern:noel
only.
1.16
YMOn9
alnroval
(L)
1.16.1
Open
1.17
Completed
Moan Donn)
[VICTIM NAME REDACTED]
ConsumaNes & Shop Staples
LIE
Waiting
approval
0.1
Major Alterations regulatory comp/ante requirements to be
completed by instaler ea imitated on FM tam 8100-9.
Copy and paste from attached statements as needed and
ern as required.
[VICTIM NAME REDACTED] 25.1301 (a) (0).
25.1353(a) and 25.1431(c) (d).
COMFUED WITH THE REQUIREMENTS OF FAR 251301(a)
(P). 25.1353(a) and 25.1431(0) (d), via [VICTIM NAME REDACTED]ORT Ho. CEJO(x%g0f% REV. ), ( IN SUPPORT
CS STC )3COCCOM ) and GR4R216.4 REPAIR STATION
INTERFERENCE TESTING REQUIREMENTS F057 MAJOR
ALTERATIONS COMPUANCE FORM.
COMPLY WITH REQUIREMENTS OF FAR 25.1529,
INSTRUCTIONS FOR CONTINUED AIRWORTHINESS
REF X/C00( MANUAL, P/N %/OW= REV. X, FOR
INSTRUCTIONS FOR CONTINUED AIRWORTHINESSAHD
EILOCX 8 CC FM FORM 337, DATED )0(/XXIXXXX
COMPLY WITH THE WIRE ROUTING REQUIREMENTS OF
FM POLICY MM-01-04 MO FAR 25.1353 (8)
COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF
FM POLICY MM-01-04 AND FM 25.1353 (13) By
ENSURING ROUTING WAS IN ACCORDANCE AC43.13-11,
OIMGE 1 CHAPTER 11, SECTION 8.
1.19
1.20
WalOn9
approval
(1)
Waiting
approval
Update WCi
a Seance
faience Pant and Were & Etakree Requirements.
II 500)' 6.21.01AM
Gulfstream Proprietary Information
Part I N:o
EFTA00796563
Work Order:
5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown &pawls All
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays)
Assoc
Stalin
1.21
1.22
1.23
(1)
Waiting
approval
(L)
Completed
Completed
1.29
Completed
1.25
In
Progress
1.25.1
Completed
1.252
Completed
1.25.3
Open
1.25.4
1.26
Open
WaiOng
aPPrOval
1.27
WaiOng
appal
(1)
2.1
2.1.1
2.2
Completed
Completed
Completed
Discrepant/
Reveal scope or aircraft sealer pant totehspftepars, and
dtin reptxements reviling in paint reappliatios, and
determine area on stir and batanCe.
For surfaces :Akre pant is stripped and reapplied or added
co top of existing pant on an area greater than 36 square
feet the thickness values AO be documented before and
after painting . If average oldness %glues remain the
seam wore and baba reeincri b net required.
For surfaces painted wed an area greater than 36 square
feet and before and alter cent thickness average vanes. QC
review for pasoble weight end ttlance revision will be
regAred.
• Thames wit be plottedon an aircraft droning denved
from AMM chapter 6 a-other subtle Mach, attached to
the week Order and meaStrensantS taken on a two equate
foal god.
• Reference GAMS 4000, paragraph 3.5.1 for paint
restnclicns to fight wird surfaces and RVSM certified
aircraft
• Reference CAMPS 4000, total average tNduias shed not
exceed 6 mils.
• Per GAC Mass Properties Engineering, pant thickness of
mis equSs .055 pounds per squre foot.
Varear QC review, weight change is greater than 2
pounds or .05% of IIAC, the weight and balance report
repine rearnaitaton.
&exert Ready for Renato Service. At reamed
inspectsans, to in64e preflirt ropectoss, maintenance
tasks, operational & leak checks, related doraimercaocet
and deanna activeescompl0te.
Contact Realm to Service group when tNs swank is
complied with.
Advise customer of preservation requirements per ATA
Chapter 10 01 the releant maintenance manuals fa
Arframe, Engines, ad MU; review requirements in
relation to schedUal Date Po:rimed and later pctental Date
Completed; and perform maintenarce or pesovato+
actions as directed by the CuStOmer and documented as a
Work Order Squant.
Pre-Compliance cabn refurbeshment nspecten
NOTE: SEE APPENDIX
04P GSSO 010010-Serree Cater Maintenance !tam
Oleddig
Comply with lot Codot and Hoe Cabin
Carroty with intend Hat Cockpit LAW RSQCT-26S 0.er-I
cow, with MOWN Hot Caton JAW RSQCT-219 Rawl
cow, with outbound Hot Oxkplt LAW RSQCT-265 Rent
Comply with citbeund Hot Cabin LAW fISQCT-219 Rev-2
Remand aircraft laps and bag and scared in Seen
9tranSOWS office.
Sales Concesocn
MODE DR700..7100F31
Remove LH engne nose cowl and replace with Rots Royce
provided exchange trat. Reference RR Newstts6h:
tiF2013.02.
Removed VII Eng. lamer inlet cowl PN:0K0081-019
SMGV5P159 and installed customer repated Inlet cowl PP:
04(0001-019514: GVSP134SV per 04P 711002 Ilan 11.1.
Reference Rerrowi and Instdletsen Wok page IC.
CMP GSSO 893131 Alert 5B1311703-73-A9C0383R1 -
Replawnent d ilInCOnlomeng Part of the EEC Rebox
Assembly
Taber
Only
$1,652
Motet
No Charge (Rolls-Royce Warranty) (All
Cperatas)
The intent of this haorbiecclification Service Buletin Is to
replace ben EEC firebox assembles that have an inefficient
thickness of the retroescent psnt.
Effectivity: Reference Rolls.Royce Serra Butetin 80.700-73-
x988883 fa effeCtMty
Notes:
Advised customer of °ogre and API) preservation requirements.
Complied with Pre-Compliance Sin regsbishment ropecton per 14 CFR part 25.
Complied with CMP GSSO 010010-know Center Maintenance DIMS= Cheddist
Complied with inbound Hat Cockpit LAW RSQCT-265 Rev-I
Complied With In0Xeld HOt Cabin JAW PSIZCf:219 Rev-2
Summary: Removed VII Eng. loaner inlet ant PH:09C0301-019 SN:GYSPIS9 ard instated Rolls Royce provided
exchange Wet cowl PH: 040/00/019 SN: GVSP13e5V per CW 711002.
See steps below for detailed week prformed.
COMPLIED WITH CMP G550880131 Nat 58 8R700-734.900383R1 Replacement of Non-Conkrmng Parts of the EEC
Firebox ASSeMtly.
Not Applicable due to engine SSI: effecthey
Engine S/N: 15998 with carEguraban standard 7100111 engrawd en data plate.
12/11,011 6:11:03AM
Gutfstream Proprietary Information
No:
EFTA00796564
Work Order:
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: Au
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Stalsas
2.3
hi
3.1
Carp kt ed
3.1.1
Canpleted
3.2
Canalised
3.3
Competed
3.3.1
Convicted
3.3.2
Convicted
3.3.3
Competed
3.3.4
Competed
3.4
Competed
5.1
COMMete0
Completed
Discrepancy
Pans are &heckled arid procured theeurob Reff Royce.
Reese place your crow with Ret-Rote Spares sa (6)
months m advance and ROMP 'MO need date SO they Can
endure parts at:0406:m.
CameatcCem Detentes: Cuirstrern viii rrerace Rao.
Royce CaparateCare for the three abate en the
Custom's behalf. Determination
wnat is of is not
covered under the mentenzae program will be detenratO
by RaluRcyce. My charge, net coated by the
CorpoiateCare aceram mll be the Custemsoz rammibilty
and %Mast to Gulfs-Cream's standard Terms and Conditons
with regard to payment. Sutirressen dl the mote 6
Fecicated on the CorparateCare maintenance program
tang in (Dice at the doe a service.
"'CANCEL"' 04P G550 880466 Alert 58 68700.73•
A101981R3 - Irecductico of a New EEC Firebox Assembly
nab a Revised Pant System.
Resolution
Cannot convey with at this time due to Darts avalabley. $6 emplane due by 31 /AN 2021 (38 rnos remairing).
Customer Ssanatuie:
ENGINE SA700-71001-11
Rearm NI crane ncee cent and replace with Rots Rate
Pavided enchange tot. Reference RR Newsflast
NF2013.02.
Removed NH Eng. Ceres inlet awl RY:060001-020
SN:GY5P171 and Inetall&I cuRorra offered Inlet cowl PN:
040:031420 SN: 6139 per CMP 711002 Item I I.2
CMP G5.50 893131 Men SB BR[SSN REDACTED]383R1 -
nepiaonnent of NanConromMts Parts of the EEC Pae%x
Assembly
Labor
61,652
MatenalS
No Charge (RolisitOyce Warranty) (M
Operates)
The intent of this Non-Modification Service BuTetin is to
replace One EEC firebox assembles that have an nuttoent
thickness or the evanescent pert
Effecbvity: Reference Rolls.Rome Service &ikon 80.700-73-
/ROCOCO far effectivity
Notes:
Parts are theckPol and procured thrown, ROI/Re/CO
Pease place your order with Rob-Royce Spares six (6)
months in advance arty provide yaw need date so they an
enSure parts avaladlty.
CapOrateCare Customers affstrearn vin invoice Rolls-
Royce Camera-Gore for the cherges above on the
Gusts:rods behalf. Determination
what is or is not
covered
or
theym
nce ortgram will be detamnol
Si RedivRace. M dorms not covered by the
CorpaateCare pagan nil be the Custard:es rapcnsibilty
and Subject tO Guttman standard rerms and conoloons
rah regard to Pareent. Subrnssien of the mode is
pralcated on the CorporateCare maintenance pager
Ming in force at the bine of scake.
Cannbalize Y. duct P/N 0480402-005 from NC 5173 la NC
671, Ref: W.O. 50521837. 49.3.1
Rowed to cannibalize 1- duct P/N 04F0402:035 sin
/0459801. from NC 5173 for irate/label onto A/C 671 per
RR ER710 DIM 36-1145 Rev. May 15/16
Install prerbusly renewed cannibalized 1- duct PM
04804024006 from NC 5173 for NC 671, itecieved dl to
install and installed pa PREMM 36-11-45 Rev. May 15/16
Removed tannitialeed 1: duct P/N 0480402-035, SM
704598CR rron: NC 671 and rotated into onnianal location
on NC 5173 RH engine per RREMM 36-1145 Rev. May
15/16
TWA 558135, Due- 6/18
Leak Med( required.
Complied with leak check of Y- Ott P/N 0486932-005 on
R/II engine with no leas detected per G550 MM 36-11-6
August 31/03.
"'CANCEL"' CMP 4550 890466 Mert 58 68700.73•
Ali/1981R3 - Irooductico of a New EEC Firebox Assembly
with a Revised Pant System.
APU RE220
Tochnkal Bulletins (ASC, CB, SB, AD, ACB)
"•CAUCEL• • 'CsIc Cs550 9/1162 ASC 1168 Nose Landing
Gear (MS) Karnes InstalLtico
Summary: Removed Rill Eng. boner inlet tea 68040001-020 SN:GYSP171 and installed Rolls Royce provided
exchange Wet cowl PH: 04C0031-020 SN: G139 Der 04P 711002.
See steps below for detailed work portent&
COMPLIED WITH CMP e3550 890131 Net 58 BR700-736.900003R1 - Replacement of Nan-Confo-miog Pens of the EEC
F9.103x Amend&
Nat Applicable due to engine 5./N: effectivity
Engine SM: 15449 ?nth ccroduratico standard 7100i-11 engraved on data plate.
strnmann
Removed to cannibalize 7- duct P/N 04F0402•CCG sin 045513CR, from NC 5173 for installation onto NC 671 Der RR
Eft710 EMM 36-1145 Rev. May 15/16 Removed annbaltred1- Ott P/N 04F0402-005, SM XY4598CR Nam A/C 671
and installed kilo aigianal location an NC 5173 FUH engine per RREMM 36-11-45 Rae. May 15/16
/WA 558135, Due- 6/18. See Stet below.
See Item 3.3.3 for reinstallation
Cannot convey with at this time due to Darts avalabley. 56 a:sentence due by 31 /AN 2021 (38 rnOS remairing).
Cogent, Signature:
Customer elects ro alien at this bme.
Customer
Signature'
tdrisrzoi7 6:19:01Am
Gulfstream Proprietary Information
Pat I of29
EFTA00796565
Work Order:
5C521661 AC: 5173 ST/4: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
6
/Monks
6.1
Completed Customer request to comp/y nth Registration change to
Ref Rein 20.1 fa no* performed
112121E.
Notes: Need 05< update for restrawn3 transponder etc.
Pete Rawsen has ordered the wife Sri.
6.2
Watbng
Customer request custom &midst be 'staled on DU.
aooroval
(l)
Pease hold watt receipt ol Me custom ACL.
6.3
Completed Plight GLadarce Panel backichong does not Muir/rote for
Sinewy:
nicht 00s.
Confirm NW Carved Item
Discrepancy
Resolution
6.3.1
Completed Removed night gullance panel (on: 7021852.901 sn:
%030509) and replaced WM repaired Pr guidance panel
(pn: 7021852401 en: 08080720) with no defects noted. NI
work dad per GSSO CMP 221001. Ref tern 11.8 for CMP
RIM.
Renewed flight pub:lance panel (on: 7021852.901 sn: 06030509) and replaced wen repaired flight pub:lance Panel (on:
7021852.901 sn: 080130720) and performed Autopla operatenal deck with no defects noted. Ahnork done ref CMP
G550 221002 item 11.10 and GSSO CMP 22100 kern 11.8. See steps baby/ fa work performed.
6.3.2
Completed Performed Auteibt operational ONNk with nodefects
noted. Al work done ref CMP G550 221002 item 11.10.
6.4
Completed DU 24 mop. Swapped with DU 23 and problem (phoned.
Removed defative DU and repliced nth notified DU (p.: 7028140-905 sn: 09125363) aid performed operation:1
deck with no defects noted. All work done Per 6550 CND 316024 and CMP 316030. Rel Items 11.7 and 11.9.
6.5
In
Custard request to update ROAS settings.
Progress
6.5.1
Completed Created one Settings and Riggrhas Der GER 5767
6.6
WAIN
Customer requests to update the anhow 4000 aircraft
zoomed
photo wth the new blue paint sdierre and to add the
(L)
company logo. Logo to be worded by the Catania.
Ref tern 20 1.16
7
Interior
7.1
Completed •••CANCEL•• 'Customer request to remove and replace or- Customs elects no action at this brae.
SOW NW. YAM customer Selected
Nees:
Demon has samples for customer
Customer
Signature:
7.2
WAN
Fwd oxket door hande loose and Orals door operation.
aooroval
(L)
7.3
'Hsiang
Lent hande for on pressure S scotching varier on as
approval
treSSure 000r (C8528041000)
(L)
Nathaniel
8.1
Completed "'VOID—Customer request to replace nose and man
Otoicate Entry. REF ITEM 25.1 FOR TIRE REPLACEMENT
des
8.2
Completed Replace Lil & RH Engem Cows ( to be supplied by Rots-
Ref dens 2.1 & 3.1 foe wok performed
Royce).
Notes:
Comorate Care item
8.3
In
Customer request full dewing arid operatimal checks of the
Progress
Lavatory tank end sistan.
8.3.1
Completed Removed, cleaned, nspecte0, and reinstalled tftradOok
sensors P61:7700395-001 LM SN:07.G-170]. and R/H 511:07-
G-167 per CMP 380015/383024, and CMP 38(031/380032.
Ref. Warns. 11.44,11.45,11.46,11.98.
8.4
Completed Customer request to irooect all exterior sense° door latches Sunny: Installed New latch P/N 145000-2•102-142 per BP 1159851110 Rev G to the external MED switch seroce
for seryirstality end replace one discrepant latch en the
door. Completed inspection of di sense door Latches per G550 MM 53-00-00 )une 15/16 and found no father
external MED snatch prvire door
diserepanes. (See steps below for a detail of work performed)
8.4.1
Completed Remtreed discrepant latch On the eternal MED switch
Senkerlar Per ED 1159651110 Rev G.
8.4.2
Completed Installed New latch P/N 16000-2-102-142 per OP
1159851110 Rev G to the eternal MED swath service doer.
Competed inspecdonol al exterior seroce door latches per
6550 MM 530000 Acne 15/16 and 6550 MM 5240.00
October 30/06 irking no further discrepsioes.
8.4.3
Completed Request paint onexternal MED switch Nate door die to
The aircraft is getting fill Trap/paint (ref kern 13.1). The MED service {low latch wil be painted at this time.
new latch Installation
8.5
Open
Customer request to Cheek water system IndtatROS
8.5.1
Completed Complied with potable water tank soNix per G550 AlO4
38-1401 March 31/17. No indication on external pond
noted throughout entire service.
8.6
Completed CMP G550 275019 Flap Actuator Travel Nut (Left) -
COMPLIED WITH CMP G550 275019 Flap Actuator Travel Not (Left) - Lubrisabco
Lubrication
8.7
Completed 04P G550275020 Rio Actuator Travel Nut (Right)-
COMPLIED WITH CMP G550275020 Flap Actuator Travel NUt (Right) • tteaca0on
Lubrication
8.8
Completed •••V011)•••CMP 6550 274202 Ilarnotal Stabnzer
Vod - Cupleate of item 23.11.
Actuator - Lubication
8.9
Completed 04P 6550 491005 PAl Embus:0 FS 767 • P5 797. Zonal
COMPLIED WITH CMP G550 491005 APIA Enclosure FS 767 FS 797: Zonal InSPeCtian
Inspection
8.10
Waibng
Customer requests 12 spare aircraft keys.
12.15.2017
6 :ILO AN
Gel/stream Proprietary Information
Nrc 4N:9
EFTA00796566
Work Order:
SCS21661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AD
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
stews i
approwi
(L)
611
Completed
8.12
Completed
8.12.1
Completed
8.122
Completed
8.12.3
Completed
8.12.4
Completed
6.12.5
Completed
6.12.6
Completed
8.13
Waiting
Marmot
(1.)
8.13.1
Ccepleted
8.10
COS
8.14.1
Completed
8.14.1.1
Completed
8.15
Completed
8.16
Completed
8.17
COS
8.18
COS
8.18.1
Completed
8.18.2
Completed
8.19
Waiting
approval
(L)
8.19.1
Completed
8.20
Completed
DIsexpanot
addedduring debrief
Blue 'R FUEL RETURN FAIL' CAS message appeared One
tour min eight. Crew Aso toted dilettante oil
temperature was 100 degrees Mous and the left al
temeerature was 80 degrees eel:M.
Added Oaring (letrk4
Apu endceure has several corroded fasteners bated on
encloare base loner access panels
Fou4 wile COmPlying with ChIP 491085 * 8.9
Removed APU asserrbg (Cr access to beer enclosure
ps.eb. Ref. GSSO AMM 49e0-00 Rev. 2/15/15
Removed FWD base rower panel 31282F and AFT base
lower panel 312A2F. Removed COrnged hardware and
began cleaning panels per Dossing //59851419 Rey. L.
Finished cleanng PhD base lower pond 31282E and MT
base lower panel 312A2F Pawing 1159851019 Rev. L.
Installed new hardware on FWD base lower panel 31285
and AFT base lower ps.el 312A2F per Doming /159851419
Rev. L
Installed AM assembly FR • WE38007001 5N • P.500 per
6550 AMM 490060 Rev. 2/15/15.
Thies 567921 due O%18 and 562027 due 06/18
Leak died required on MU per 6550 AMM 494300 Feb
15/15.
Complied nets leak check of MO per G550 AMM 49-0043
Feb 15/15. Received OK to dose APU panels and completed
foal dome.
FWD bullet faring (knee panel) ha evidence of erasion at
fwd edge around fwd looking camera and a puncbse reside
of fairing. Areas marked with OW grease Pence
Ref. Item 15.1
removed bullet farm camera for faring repair LAW
GC515050250 Rev -
Ape Enclosure has large area of distaded coating
on fwd bh sde of ape endosure.
Request engineering dmosition for APU canpartment has
large area 01 fire retardare misprg.
Engineern.g dsposton:
The coatng it net repairable. Remove any loose or
mumbling sections of coahng. If applicable remove the
ARemate Melva oil Complence authonzaton horn the
aircraft records. Reinstate the krnorthiness Orectiye AD
2009-17-01 and op* MM Supplement GS50-2009-03 in
accordance with the State Of registry reduirernerts.
"NOID"IL/Il intgaid roriz.stab. leadre edge has tan
rubber sat
Rel. Paint Traveler
" 'VOIDwIrdhl irtgard heriz.stab. Wog edge has torn
rubber seal.
Ref. Paint Traveler
OIP 6550 992902 PD 2009-17-01 InsPeChan For Sealant
Applied To The Exterior Of The Auxthiry loner Out (APU)
ErsCIOSure
Ref 8.14.1 erg dspo for remstabng AD 2009.17-1
Wing body faking grew SOWN in dome nut pate at panel
196.48 an 01 wing as marked with tape.
REF 13.1.1
Removed discrepant dome r
ate PN: NASMINIA3 from
Malec PN: 1159852017-11 pa GAC DWG 1159852017 Rey
6.
Install% dome netPlate Par liA514703 On doubler PH:
1159852017.41 and Entailed doubler. Bads Seale/0000er
and nu/plate. Week clone per GAC DWG 1159852017 Rev B.
Cytn 'AEU Mane Rennet Cm message on APU start. CMC
fault code 4922222APU (MU ROw Ceeklet SP Short)
Ref tens 112
Gained access to 181A1P1 (oh APU Celina). Disconnected
pito, inspected and cleaned cannon plug with nO defects
noted. Returned Mat to wird confgurabon. MI
reverters:me performed tang V/C61 4940-00 June 15/16.
during panel 196AB nstatation noticed glen spmirg
freely. MarkedWM tape
ReeokidOn
Performed heated fuel return memorial check with no defects noted. Al work done per 6550 AMM 28.16-00 dated
August 30. 2009.
Decade resistor box IDe 569366 cal due date 11/18
Sunurvey: Removed and cleaned areas mond FWD base lave panel 31282F and MT base lower panel 312A2F.
Replaced screws PN:MS27039.0609 and washers PN:M1960.108 per Drawing 1159851419 Rev.L
See steps below tor full details.
Removed at Rose and crumtling sections ct COOtlna per eng dep. Ref item 8.17 for PD 2009.17-01
Ref item 8.14.1.1 for eng dope
MRS 891
Ref 506238.2022.1.1
"'VOID"' Entered In wrong MC wOrkOrcler
"'VOID"' Entered In wrong A/C wOrkOrcler
COMPLIED WITH ChiP G550 992902 AD 2039.1741 IrciPeCtiOn Per Sealant Applied To The Exterior Cf The Auxhary
Ironer Unt (APU) Enclosure
previougy compiled with in Log Book Entry dated 08/18/09.
Veiled KM Sumkment G550-2009-03 was incorportated etc the MM
Removed and mowed discrepant dome nutdate Ph' NA51474A3 on dottier Phi: 115965201741 and installed doubler
per GAC DWG 115%52017 Rev B.
Installed nub:gate PH: ILASI47413 per GAC DWG 1159652017 Rev B.
IVISROI7 6:2I:01AM
Gal/stream Proprietary InformatIon
Nee < of 29
EFTA00796567
Work Order:
5C521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status I
Diserepaney
ReerWiliOn
Ref kern 8.18
821
Compiete1 R/H elevator trim tab upper surface nas 3 areas of possible
deaamnWon. Rd. Item 13.1
8.21.1
Completed Removed R/H elevator trim tab FIN: 1159C582095-423 S/N:
373 per OW4550 273024.
Ref. Item 11.56
8.212
Completed
NOT Inspection mowed on marked SPOt
8.213
Completed Engineerng Cispouton for three surface discrepanoes:
Refer to Steps 1 thna 6.
I. Solent dean the three areas using dean cheesecloth
weer, wet wen HoproPil Alcohol. Continue until rapers
'then dean. Do not use synthetc or shop toted wiper
~torah.
2. $4 all wee locations sand ON surroundng paint using
•
tamde paper anti a solid paint base exist.
3. At the two locations next to the grandrog jumpers
carefully sand off the dry fit cloth to expose the carbon
pir. Do not Leger art nto carton Alms. TraOSS« Claret
remaining wein the rattle snail be acceptable.
1. Heat areas sp to 120 to 140F for at least 20 minutes.
After reacting this lolo time and while heat is WI berg
apeled, surface wet areas wen Epon 828/ DTA
(GAC I ISAA2
GAC117G1 respectlx<v).
S. Renacne heat source and :plow surface ta air mol to
room temperature. Phalan at 70 to 95F trail the
attache gels MaKII slop take dace after 4 hr,.
6. Na other action required shoe NC mil be undergoing
repaint.
This is inn, repay. MR8 NO. E064
8.21.4
Completed Rhea cleaned tie tree discrepant areas. At all three
locations sailed off surrounding paint. At the two batons
reed to the mounting jumpers carefuly sanded off the dry
821.5
Completed
8.22
ritteg
aP)rosel
(L)
8.23
Completed
8.24
Completed
8.24.1
Completed
8.242
Completed
8.243
Completed
825
Completed
826
In
Progress
8.26.1
Completed
6262
Open
8.26.2.1
Completed
F/G Mtn to expose the carbon ply. Heated areas to 120 to
140F tor at least 20 minutes Solace coated areas with
Epan 828 / DTA (GAC11SAA2 / GAC117G1 respectively).
Reference ergineerrg dsposstion in step 8.213
Installed R/H elevator blm tab P/N: 115%552095423 S/N:
373 per RIP 6550 273024.
Ref. IS 11.561W 560348 Cal 12/2017
Horizontal stabiles R/II hoist plug stopped.
Ref. 13.1
ull Flap
Traded 1/8 Roller is worn beyond lints per
6550 MIM 273000 Rev. march 31117
Ref. 13.2
MI flap
Track Aft I/O Roller is worn beyond Imes per
6550 AMM 27.5000 Rev. MarCh 31/17
Ref. 13.2
RemOved R/H Rart TraCk Mt outboard bracket Replaced
WH Nap
Traded 1/8 Wier with nor role, P/N
80233012Ft per DIP GSSO 275038 and Drawing
11591354220 Rev G
Redved ok to Install and Instated R/H Flap Track "V AFT
OM roller ntting. Bolts Still require torque and fang
rewires sealant per 1159C554220 Rev G.
Oct require torque and fang requires sealant per
1159(554220 Rev G.
R/H Hap track 0/8 roller bracket for track
has shipped
out tolts. bot roles/nutplates may require clearing out.
Ref/ism 8.24
While conveying wit paint strip lund dar in right fuselage
at GYPS 694.000, skin P/N 115%51316. Impression is
approximately C wide by r high and .012' deep.
Rel 13.1.2
Request NDT to Chetk for cracks at discrepant area.
Request engineering dive for repar of dent In the right
fuselage.
Preliminary Engneerng Csspastten:
I. Gain access to the Wen« Side of the dented skin
Visually inspect the dscrepant area for any additional
d iamaten to surroundng structure
2. Cold work the dxrcpart area per the procedures in SR
1077 to restore the skn to surrouncing contour 4/..005 irs
Strnmarr. Removed CI Omar urn tab PM: 1159C552095-423 5/Il: 373. Cleaned. pepped and repaired all Wee
surface discrepancies. Reference Engineering *%O. in SOW 8.21.3. Installed Fuls eievator ten tab Pitt
1159352095-423 S/N: 373 Ref. DIP GSSO 273024 Items 11.56 See correspondrg steps for detals of work performed.
1W 560349 Cal 12/2017
NOT performed Tap test inspection on R/H elevator trim tab upper surface per GAC AIDTP 2.1 rev 7 09/16/2015
No relevant incicabons noted at MS tele
Replaced NI %pi? Triads Mt I/B Roller with new roller, P/N KRF233012FT, LAW CIP G550275037 and Drawing
1159055420 Rev G
Sirrimay: Removed Rill Flap 'V Traded outboard bracket Replaced NH Flap 11' Track AR 1/B it
with new
roller, FIN XRF233012FT. Installed R/H Flap 'Er Track Mt aboard bracket. Work performed per ChIP 6550 275038
and Draning 1159C554220 Reg G.
See steps below far detakd week performed.
Torpred toOltS On fitting and sealed per 1159C5524220 Rev. G
Torque Wrench* 558039
CAL: 08/18
Upon further imestigaton round R/H Flap Track B' 0/8 ROter Bracket hardware to be stepped and ~rates are
functioning property_ Instated and torqued NEW hardware per 2741-05 Rev. November 15117.
POttrmed Eddy Current Insp.:than per GAC NOW 3.0 (REV 7 SEP 2015).
No <redo noted at the bele.
Equprnere Used: Hartet 5005 GACD 555039 (cal due 12/17) and SID. 560706 (no cal reg.)
Christa Kerby, MR81E742
12/151011 6:21:03AM
Gulfstream Proprietary Information
port 6 of 29
EFTA00796568
Work Order:
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown squawky Ail
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from nylons day (or since Friday on Mondays)
Assoc
Stows
102
10.3
11
11.1
WalOn0
cfMrowd
(1)
Waltin)
407001
(L)
Waiting
aP0rovai
a.)
Carpleted
11.2
Completed
11.3
Waiting
400001
0.1
11.4
Waiting
Motored
(1)
11.5
Waling
Motored
(1)
11.6
Competed
117
11.8
CO 0101 e t e0
Cc n I et ed
11.9
Competed
11.10
Completed
11.11
Wang
approval
(L)
11.12
Wafting
40004
(L)
11.13
Waiting
400001
(l)
11.14
intiano
Wowed
(1)
!Lis
Waiting
approval
(1)
11.16
Wang
a—
(L)
11.17
Waiting
400(04
(L)
11.18
Waiting
a00Nval
0.1
11.19
Waiting
Wowed
(1)
12.M2017 6':2103 AM
Dbcrepano,
COO a Isle .1285-.133$ in. do. per GQIIIAL1)35G at the
mare, center part of the depressen to rebore the metered
and laelltatecolO 8oritMg.
3 HOT the cob oorked area for cracks (eddy current) anti
rernaring materiel tidiness (t Heinle).
4. Inspect the cold worked wee for al caring.
5. Reo.bmIt results to ergamerno for evaluation.
mResE742
Paint
Outsesnelkm Parts, Materials, and / or Services
enineern.3 later
Back Ordered Parts
Pats Return
Follow on CMP Codes / Maintenance Tasks
CMP 6550 711001 Inlet Coal (Left) Removal / Installation
Ref. 2.1
04P 6550 711002 Inlet Cowl (Right) Removal /
Ins0lU9on
Ref. 3.1
CMP G550 711019 Coral Door, Engine Lower (Left)
Rel. 'tern 2.1
CMP G550 711020 fore Loner Carl Door (RIM) -
Removal f Instalation
Ref. 'tern 3.1
04P 6550 711021 Upper Cowl Door (Left) Removal/
Installation
Ref. item 2.1
CMP 6550 711022 Upper Cowl Door (Right) • RefrOYN
Installation
Ref. item 3.1
OW G550 316024 DISPLAY UNIT, x4 Ref 64
CMP G550 221001 PANEL, (LIGHT GUIDANCE(GP-500) Rd
63
CMP G550 316030 CENTRAL DISPLAY SYS - AM/TEST Ref
11.7
04P G550 221002 AUTOPILOT-OPERATIONAL TEST Rd
11,8
OW G550 330901 SWITCH PANEL x1 (46251)
(VEST. SW PM)
CMP G550 330930 SWITCH PANEL x30 (60157)
(t/H DIVAN AFT ARM SW PNL)
CMP GSSO 330935 SWITCH PANEL 13S (601510)
(WH SEAT ET)
04P G5S0 330924 SWITCH PANEL 124 (601511)
(t/H SEAT 915V MIL)
OW G550 330904 SWITCH EMEI. T4 (59651)
(FWD LAY SW PNL)
CMP G550 330925 SWITCH PAM% :25 (60153)
(VII SEAT *3 SW PNL)
CMP 6550 330942 SWITCH PANEL x42 (69652)
(AFT LAY SW PNL)
04P G550 330938 SWITCH PANEL 138 (601512)
(RAI DIVAN LEDGE FWD 51Y PM)
04P 6550 330936 SWITCH PANEL 136 (601511)
(RAI DIVAN FWD ARM SW PRO
Resokidon
COMPLIED WITH CMP 6550 711001 Inlet anti (Left) - Remard / Installation
TW 558064 Cal: 08/18
COMPLIED WITH CMP 6550 711002 Inlet Or A1 (Right) - Removal f Instalation
TW:557274 Cal Cue: 06/18
1V(:557259 Cal Cue: 03/18
COMPLIED WITH CMP G550 711022 Upper Cowl Door (Right) - RECAMMI Installation
Torque Wrenches used: 557274 Cal die 06/18
557259Cal due 03/18
COMPLIED WITH ChIP G550 316024 DISPLAY LIMIT, et
on off: 7028140-901
pn on: 7028140-905
sn oft 07092716
sn on: 09125363
COMPLIED win' CMP GSSO 221001 PANEL, FLIGHT GUIGVICE(GP500)
pn Ott/00: 7021852-901
sn off. 06030509
sn on: 08080720
COMPLIED WITH CMP G550 316030 CEIGRAI. DISPLAY SYS - ADJ/TEST
COMPLIED WITH CMP 6550 221002 AUTOPILOT- OPERATICNA1 TEST
COMPLIED WITH CMP G550 330901 SWITCH PANEL xl
COMPLIED WITH CMP G550 330930 SWITCH PANEL x30
COMPLIED Willi CMP 6550 330935 SWITCH PANEL 135
COMPLIED WITH CMP 6550 330924 SWITCH PANEL 124
COMPLIED WITH CMP G550 330904 SWITCH PANEL xs
COMPLIED WITH CMP G550 330925 SWITCH PANEL :25
COMPLIED WITH CMP 6550 330942 SWITCH PANEL TAT
COMPLIED WITH CMP 6550 330938 SWITCH PANEL 138
COMPLIED WITH CMP 6550 330936 SWITCH PANEL 136
Gulfstream Proprietary Information
Pays 0129
EFTA00796569
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from prevtous day (or since Friday on Mondays)
Assoc
Status (
DIsaapancy
Raolutlon
11.20
Waiting
alowerral
CMP 6550 330905 SWITCH PANEL xS (59652)
COMPLIED WITH CMP GSSO 330905 SWITCH PANEL #5
0.)
(FWD IAV SW PAL)
11.21
Wan)
04P G550 330940 SWITCH PANEL 440 (57153)
COMPLIED WITH CMP 6550 330940 SWITCH PANEL 440
Wowed
(L)
(ENT CABINET SW PML)
11.22
KAMAN
a00rOvy
04P 6550 330928 SWITCH PANEL 425 (60155)
COMPLIED WITH CMP 6550 330926 SWITCH PANEL 428
(L)
(UV DIVAN LEDGE FWD SW Ptti.)
11.23
WalOrg
a00rovy
CMP 6550 330927 SWITCH PANB. 427 (60154)
COMPLIED WITH CMP 6550 330927 SWITCH PANEL 427
(L)
(Ull DIVAN FWD MM SW PHL)
11.24
Waiting
a00rovy
CMP GSSO 330943 SWITCH PANEL x43 (69653)
COMPLIED WITH CMP 6550 330943 SWITCH PANEL x43
(l)
(AFT LAP SW PAL)
11.25
Waiting
CMP G5S0 330933 SWITCH RANA. e33 (60159)
COMPLIED WITH CMP 6550 330913 SWITCH PANEL x33
Wowed
(l)
(WH SEAT x 1 SW PAL)
11.26
WalOn9
04P 6550 330939 SWITCH PANEL 439 (601514)
COMPLIED WITH CMP G550 330939 SWITCH PANEL 439
Wowed
(L)
(Rill DIVAN AFT MM SW PHL)
1117
IMAM
a00rOvy
04P G550 330941 SWITCH PANEL 441 (50251)
COMPLIED WITH CMP G550 330941 SWITCH PANEL T4I
(L)
(CREDENZA SW Pta.)
11.28
WalOrg
a00rOvy
04P G550 330929 SWITCH PANEL x29 (60156)
COMPLIED WITH CMP G550 330929 SWITCH PANEL 429
(L)
(UV DIVAN LEDGE AFT SW PtiL)
11.29
Wilting
a00rOvy
CMP G5S0 330932 SWITCH PANEL x32 (57152)
COMPLIED WITH CMP 6550 330932 SWITCH PANEL x32
0.)
(LM WINDOW x 7 SW PM.)
11.30
Waiting
04P G550 330937 SWITCH PANE. x37 (601513)
COMPLIED WITH CMP 6550 330937 SWITCH PANEL x37
Wowed
(l)
(R(H DIVAN LEDGE AT SW PNL)
11.31
%Y910ng
04P G550 330903 SWITCH PANEL X3 (57352)
COMPLIED WITH CMP G550 3309W SWITCH PANEL 43
Wowed
(1)
(GALLEY SW PtiL)
11.32
waltin9
a00rovy
04P G550 330934 SWITCH PANEL 434 (57151)
COMPLIED WITH CMP G550 330934 SWITCH PANEL 434
(L)
(Rill SEAT *2 SW PttL)
11.33
Waiting
a00,0 94
CMP G5S0 330902 SWITCH RAND. e2 (57351)
COMPLIED WITH CMP GSSO 330902 SWITCH PANEL #2
(L)
(GALLEY SW PttL)
11.34
Waiting
agliOral
CMP G5S0 330931 SWITCH RANO. e31 (60158)
COMPLIED WITH CMP 6550 330931 SWITCH PANEL x31
(I.)
(VH WINDOW • 6 SW PM.)
11.35
Waiting
04P GSSO 330926 SWITCH PANEL x26 (60152)
COMPLIED WITH CMP 6550 330926 SWITCH PANEL x26
Wowed
(l)
(IA SEAT x 2 SW PNL)
11.36
WalOn9
04P 6550 233084 Dgtal Video Dsc Player (No. 1) • Anal
COMPLIED WITH CMP G550 233084 Digital Wee Disc Player (Na. I). Final Phase Removal InRyla0on
Wowed
(L)
Phase Removal / Installation
11.37
%Yang
aPorgral
CMP 6550 233089 Dgtal Video Du Play. (No. 2). Final
Mese Removal/ Installation
COMPLIED WITH CMP G550 233069 Dgrtal Video D8O Play. (Na. 2). Final Phase Removal InstarlaBon
(L)
11.36
Waiting
a00rOvy
CMP G550 233061 Canoed Dec Player (1b. 1)- Anal
Mose Removal/ Installation
COMPLIED WIT' CMP 6550 233061 Canpact Disc Player (No. 1) - And Phase Removal! ireddlaticn
(L)
11.39
Waiting
aegrOral
CMP 6550 383001 TOILET, AFT LAY
0.)
11.90
Ccmpleted
CMP 6550 323011 Lending Gear Emergency Extemion
COMPLIED WIT' CMP 6550 323011 Landirg Gear Emergency Extension Netogen Bemedawn Borne (Right) -
Nitrogen Bkromieren Bottle (Art) - Amoral! Irate/Ian:0
Removal/ Instalatem
1W: 568539 Cal. Due: 02/18
IW: 562027 Cal. Due: 06/18
11.41
Completed
CMP G550 351023 Crew Ongen Mask and Regulator Box
COMPLIED WITH CMP G550 351023 Crew Ceygen Mask and Regulator Box (COsetver) Removal! Instigation
(anerver) Removal! Irntalation
Ref. 23.22
11.42
Completed
CMP 6550 351036 Observer Oxman Mask Removal!
COMPLIED WITH CMP G550 351036 Ctisemer Oxygen Mask Removal F Installagan
Installation
Rel. 2122
Mkt page: I2C
11.93
Waiting
CIO 6550 381001 WATER TANK, el
Motored
(l)
Ref. 15.1
11.44
fY910ng
CMP 6550 380015 Waste Tank UltrasonIC Level Sensor
COMPLIED WITH CMP G550 380015 Waste Tank Ultrasonic Level Sensor (Let) Removal 1 Ingailathri
Wormed
(L)
(Left) - Removal / Instalteko
IW: 567921 Cal Due: 09/18
11.45
Completed
CMP G550 303031 Waste Tank Leta Level Sensor left.
COMPLIED WITH CMP G550 380031 Waste Tank Ube Level Sensor left., Deanna
I2'lS2017 6.2i.taAm
Gulfstreem Proprietary Information
Pad sof 29
EFTA00796570
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Disawanet
Resolution
Ocianrg
TW:567921 Cal Cue:09/18
11.46
ComMeted 04P 6550 380032 Waste Tank Ultra Level Sensor Right,
COMPLIED WITH CMP 6550 380032 Waste Tank Ultra Level Sensor Right Oearing
11.47
Waibng
003nlig
CIO GSSO 393025 Logs Gritrol MOtb.ne System-bps Ck
TW:567921 Cal Due:09/18
(I.)
al
0
11.48
Waiting
al
CIO 6550 383024 Waste Tank Ultrasonic Level Sena
(RV% Removal / Insolation
COMPLIED mni OW 6550 383024 Waste Tank Ukrasonic Level Sensor (Right) -Removal/ Installation
0.)
1W: 567921 Cal Due: 09/18
11.49
Completed CMP 6550 283006 FUEL SYS-Aux POWER UNIT BLEED
COMPLIED WITH OW 6550 280006 FUEL SYDAUX POWER UNIT BLEED
Ref tern 8.12
11.50
Comokted 04P 6550 4%001 Audign Power Unit (AIM Ftwaonal
COMPLIED WITH CMP G550 490001 AlWilify Power Unit (ARV) • Funanal TeSt
Test
Ref tern 8.12
Ref. squznkk 8.19
11.51
Walen9
approval
04P 6550 342650 Reward tcolong InfraredWin:10w
Assembly - Removal / Installation
(L)
11.52
Walen0
CMP 6550 352009 PAX OXY SYS (AUTOIMMI)-FUNC CX
%NOW
0.)
11.53
Comokted 04P 6550 491101 OM • Removal 2 InstalaUon
COMPLIED WITH CMP G550 491101 AP IS • Renxival / Installation
Ref tern 8.12
11.54
Waiting
CMP 6550 275001 Ftnp Swami* (Left) - Renewal f
OW
(I.
.)
Installation Ref.13.1 1
11.55
Waiting
onward,
(L)
CMP 6550 275002 Flap Swami* (Rght)- Removal!
Installation RE113.1.1
11.56
Comokted CMP 6550 273024 Trim Tab, Elevator (Right) Rel. Item 8.21 COMPLIED WITH CMP 6550 273024 Trim Talx Elevator (R301)
1W 560348 Cal 12/2017
11.57
Completed 04P 6550 273306 EVL TRIM TAB CONTROL SYS • F/T
COMPLIED WITH CMP 6550 2733% EVL TRIM TAB CONTROL SYS - Fp
11.58
WAN
approval
04P 6550 324003 Main Wheel Assembly (Left Outlwald) •
Removal f Instalation ref 25.1
(1)
11.59
WAN
approval
04P 6550 324004 Main Wheel Assembly (Left Irtgard) •
Removal f Instalation ref 25.1
(1)
11.60
Wall1n9
04P 6550 324005 Main Wheel Assembly (Right Inboard) •
11.61
NOW,
(L)
Waiting
ReM041 t Insta? Aim
CMP 6550 324006 Man Wheel Assembly (Right Outboard) -
%NOW,
0.)
Removal t Instafatban ref 25.1
11.62
Waiting
CMP GSSO 324009 Msn Landing Gear Wheel Iliearrg (Left
Wowed
(L)
Outboard) - Inspection / Ow& ref 25.1
11.63
Wall1n9
04P 6550 324010 main Lancing Gear Wiled Beath) (Left
Worm's,
(L)
Inboard) - Inspection !Check ref 25.1
11.64
Wall1n9
CMP 6550 324011 Main Landing Gear Wheel Bearing (light
Wowed
(L)
Inboard). Inspection /Check ref 25.1
11.65
Walen9
04P 6550 324012 Main Landing Gear Wheel Bearing (Right
11.66
(1)
Waiting
aPINOYal
Outtgard). InWettian / Oka*
ref 25.1
OW GSSO 324015 Msn ire Assently (Left Outboard) -
InWeCtian ref 251
0.)
11.67
Waiting
CMP 6550 324016 Mein lire Assembly (Right Outboard) -
'onward,
0.)
Inspection ref 25.1
11.68
Wall1n9
04P 6550 324034 main lire Assembly (Right Inboard) •
'onward,
(1)
Inspection ref 25.1
11.69
Walen0
onward,
(L)
04P 6550 324033 Main lire Assembly (Left Irtgard) •
Inspection ref 25.1
11.70
Walen0
CMP G550 324020 WHEEL. L MG OBD(s1)-NDT IN5P ref
11.71
(L
)al
(L)
Waiting
aPINOYal
25.1
CMP 6550 394021 lIMEEL, L MG Itt8D(E2)-NOT INSP
ref 25.1
0.)
11.72
Waiting
'onward,
CMP GSSO 394022 lIMEEL, R MG ItifiD(e3)4407 INSP
ref 25.1
1.11:‘,2017 6:21:01AM
Gulfstream Proprietary Infermatlen
Paw 0 of 19
EFTA00796571
Work Order:
SC521661 AC: 5173 STM: Charts Thomas SCC: Julian Brown Squawks: MI
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Discrepancy
RawAudon
(L)
11.73
Wean?
aPPrOWI
CMP 6550 324023 WHEEL, R MG O00(M)-NDT INSP
rel 25.1
11.71
%Wen;
aeprovd
CMP 6559 123301 Min The Assembly - Senicng
rá25.1
(L)
11.75
COmPkted CMP 6550 314030 Modular AmOnKS Unit s1 - Remaal!
COMPLIED WITH CMP 6550 314030 Module. nocrucs Unit II • Removal / Instalation
Installation
Torque Wreed, C/N: 553002 Due: My 2018
11.76
Competed 0.1P 6550 314030 MCdular Amoncs Unit r2 - Removal?
COMPLIED WITH CMP G550 314034 Mockler Avows Unit 42 • Removal! Inealation
Installation
Torque Word C/N: 553002 Due July 2018
11.77
Wailing
a00ronal
CMP 6550 314120 ASC8 Tenn Sweep
COMPLIED WITH 09P G550 314120 A503 Take. Sneep
11.78
Cu
Waiting
a00nOW1
CMP GSSO 314025 CENTRal /89515OP 01E0(
(L)
11.79
Waiting
approwl
CMP G550 344207 Enhanced Ground Pm:dinky ~hear
Warning System - Rerun to Service Test
COMPLIED WITTI CMP GS50 399207 Erhanced Greed Proximity Weideled Warrig Sporn - Relent to Service Test
(L)
11.80
Wailing
approwl
CMP 6550 344201 MODULE a1, EGPW5
COMPLIED~ 09P 6550 344201 MDCULE s1, EGPWS
(L)
11.61
Wailing
approval
CMP 6550 345810 GPS • OpteatKnal Chedi
COMPLIED~ 09P G550 345'310 GPS • Operational Cheek
0.1
11.82
Carpeted CMP 6550 314309 inadular AmOnKS Unit 43 - Remaal!
COMPLIED WITH 09P G550 319309 Module. avioncs Unit 43 Renwal! Ingalatgn
Installation
Torque WrenchC/N: 553002 Due July 2018
11.83
Wien?
aPPrOYal
CMP GSSO 314320 MAU Operational Ole&
COMPLIED WITH CMP GS50 319320 mau Operational Ole&
(L)
11.81
Waibro
approval
CMP 6550 275037 IS Track flap Raters (Left Inbed Upper
Aft) - Renwal! Installation
COMPLIED WITH 09P 6550 275037 B Trod, Flap Rollers (Left Inboard Upper Mt) - Removal / Instalbbon
(L)
Rel 8.23
TW: 558064 a due: OB/18
11.85
Wean;
approval
CMp GSSO 275038 IS Trod flap Raters (Right Inboard
Upper AA). Removal! Iretdlabcri
COMPLIED WITH CMP GS50 275038 B Trod, Flap Rollers (bold Inboard Upper AR) - Rernmal / Installation
0.)
Ref 8.24
TW: 558064 a due: OB/18
11.86
Completed •••PERMMANT REMOVAL*** 04P G550232150 Cabin
naPERMENANT REMOVAL" n COMPLIED WITH Gla GSSO 232150 Cabin Nelwak Accderdor. REF: SOR INSTALL
Network AcoderatOr
15.15
Plat.
5/N: 669
FS: 632.000
WT: 10.12 LB5
12
Wat's - Work Orange Requests
12.1
~Ong
aPPrOYal
WCR 1- APPROVED: Custc.ner request the Entrance Doer.
Arstali Door Jamb, Insole tanong Gear Daiii'S and Inskle
Cl.)
Surfaces of me ha Crakes oe panted "mite as existed color.
This WCR is witten to commulate chance horn proposal
7037536, and customer drecoon
Information Only Item
12.2
Ward
«Prol
WCR 2- EXCUSED: Customer request to replace al Cam
closet Inn; material we. OJSIOMet selected grossOnt.
22.3
(L)
Open
WCR 3- APPROVED: Customer request to renvox the two
12.3.1
Open
(2) console tables and Ws Irom me wan sae ledges.
Wood Later Only
12.3.2
Open
INT Stpport (PAR) Labor OW
12.3.3
Open
Inspeedon tabor Qty
1ZA
Ogen
VCR 4- APPROVED: Customer request to remove al cabin
dual cuprielders and replace with single cwh016N, No
cuplidders wal be required at the diven or the area 'Mere
the two cols* tees are rerncned.
12.4.1
Open
INT Shea meal Labor Only
12.9.2
Open
Wood Labor Only
12.9.3
Open
Inspection labor 0*
12.5
ViDiOng
arofovai
WCR S. DECUNED: Customer request to replace the
allStak vinyl with new customer seeded
12.6
(L)
Open
WCR 6- APPROVED: Customer request to replace the galley
and galley annex counter top nouns mtt. narcinood.
The current nosngs vilt be removed. The new noungs wil
be fabricated of hardnood and veneer.
12/11,2o17 6:2I.03AM
Gulfstream Proprietary Information
Pen IO of 29
EFTA00796572
Work Order:
5C521661 AC: 5173 STA: Charles Thomas SCC: Julian Brown &pawl= MI
Yellow = Newly Added 163,174 Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Ain
Stalin I
WiCreglancy
Resolution
12.6.1
Open
Wood Labor Only
12.6-2
Open
INT Finish sal Paint Leber Onty
12.6.3
Open
Inspection Labor Ortv
12.7
Waiting
approval
(L)
WCR 7. DC-CUNED: Customer requests t0 add MO (2) each
110 VAC and two (2) each USE <hissing ports in the
codpt
12.8
Waiting
awroval
ViCR 8. CeCURED: Customer leaves% instaltgron of LED
Wester lights.
12.9
(L)
Waiting
approval
note: Mrstar light bezel plating Is not Included. Sbautl the
light bezels realm plating. the Rem wll be worked as a
line and material effort
ova 9- DECLINED: Customer requests to replete allcalm
hardware.
12.10
(1)
Waiting
aPPriwal
Due to fluctuations in plating costs, cis WCR a berg
presaged as a bidgetary effort.
Al cann hardware wit be removed anti plate(' to the
customer selected finish. the plated terra wit be
reinstalled and operatenaty inspected for proper fit and
funCtiOn.
Notes: My repairs found nerwvwxy ere not included end
wet be addressed on a brie and inaterul basis.
VCR 10- CeCUNIEO: Customer request t0 recover the
baggage compartment with new grosspoinl matted.
12.11
(1)
WaiOn9
aPProval
Tee baggage compartment will be disassembled as required
t0 remove al misting grosspoint from the subsoate and
omen. Specified grossoont will be notated on panels and
all areas of baggage gm:sport.
Al applKable hardware and hardwood Ifni val be repainted
to match the new macro,.
PrepOSal based on reuse a all applicable gOstrate and
componentry n exhort° COndtlOn.
Repairs to substrate pats are not ncluded and wzl be
quoted on a tine and material bags.
VCR 11. CC-CLINEO: Customer reqUints to replace the
curse-it chna and flatware trawer inserts with new.
(L)
13
Option 1• Full Pant • (Ref. Item D 1.1 of Prommel
13.1
Open
ID* 7037336, ROD)
°Mien 1. NI Pant
The preparation and applcation of the exterior pant wll De
apole0 n accordarxe with the orocethres are
specifications waned is the Gulistream Aerospace Material
and Process Specification (GAMPS 4000) and will
Include tee Wiener.) Customer 'peened elements:
13.1.1
In
The enSh09 Paint roll Pre removed from the Swart.
Compoote surfaces wil be self sanded to 'ww.e the
Voss from the excang paint.
The main entrance Antall- door. Altair doorjamb, and
baggage &or Arne wit De parted to mach the Primary
fuselage Woe.
The nude of the landing gear doers rill be painted with
the same base color as the outstie surface.
The Landing gear wet Pre deaned.
Ynng wales wll be applied n madame with approved
A new radon DOOt wll De acoleci.
An antenna leadna edges wll have erosion tape applied.
Preciously polished metal wrier: wil be buffed.
The aside surfaces of the aimrakes wet be painted.
After completion of the erter cir paint, a weight and balance
wll be performed on the eboeft.
Any terns not listed above wil be quoted map:retain
basis by the GlifStrtem locates Para Operatlens
manager, inducing labor and materials on a Won Ovnge
Realest (MR).
"' SEE APPENDIX FOR ADDITICOM IAPO •"
MechaNcai Pare Traveler
13.1.1.1
Progress
Completed Temperately install of panel 32SAT, and panel 337CT fee
part traveler Pet 6550 ANN 55.30.00 Rer.ftw 15/17.
13.1.1.2
Open
Rel.13.1.1
Remove panel 32SAT, and panel 337CT after completion of
pant traveler per GSSO Anal SS-30-00 Rev.Nov 15/17.
Rel.17.1
13.1.2
Waiting
2rea Aircraft
Sopped aircraft per GAPS -0300 rev. G.
13.13
Imp
In
PrepPM:rart
Pre9reSS
I2.05,20I7 6,2113AM
Gulfstream Proprietary Information
Past I I of 19
EFTA00796573
Work Order:
SC521661 AC: 5173 STM: CharIM Thomas SCC: Julian Brown Squawks: M
Yelblv = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
ASSOC i
Stalt181 I
Disamsancy
13.1.1
Open
13.15
Open
13.1.6
Open
13.1.7
Open
13.18
Open
13.1.9
In
Progress
13.2
Completed
13.3
Open
13.3.1
Open
13.3.1.1
Completed
S
Waibng
approval
(1)
In
Progress
Layout ArcreA
Part Aircraft
DetallNrcraft
Weight and Waite
customer support
ergneenng supped
Inspect di flap rollers prior to pent.
Radome to Snare perimeter steps. detail Insprxtion R/H
Se negative step of .053 out of links, malted with
rmskng tape with mows per G550 AMM 53-02-01 Rev. Nay
15417. Ref Plant bavekx 1 le.
Request engineering Oimosnon to cared rt/H Sate negative
step on radorne that is out of limits.
Engreeerng Dspezton:
It IS acceptacie to repar the outol.toluance radcrne sten
In accordance with Gurstream %nice Letter GSL035300301
Rey. .*Aerodinarnic filer Sweep- Fair Procedure -
Radcme Steps". This Gullstrearn Seneca It
(a) a
Ct3S9Aed as a Man& acturers Service Document and IS
gleeMed by ArIMPXy Circulars 20.176A and AC 120.77.
Completing a repair per a Gullstream Serwce Letter is
Slmfar to tOrnMeting a repair per the Sincere Meer
Manual (SRM); No sepal number SPEC.% FM Form 8103-9
is required and vell not be mended n support of a GSL
repair. The Engneenng (Scarce) Data for this Service
Letter has been shown to comply AIM the soot* FM'S
artIls FM Approved. &sinew.° source data is retained
by Gulfstrearn as propietary data.
Photographic Documentation • (Rat. Rem Ei 2.1 Of
Proposal IDS 7037536, ROO)
Priptourare- Whimcreation a no dupe to Customer may
be taken n act:rant nth the folbmng agreement
between the Custoter and Gullsveam.
Should the Customer like to ParVegate in this PhotograpNc
Documentation, please renew the folkmirg agreement
and authorize by accepting this item on the proposal
summary Page
Agreement:
airstream reserves the right to photographicallydocument
the outetting process and the refurbshe0 arcraft. Al
Photographic DOCuMentifign Is accompli9ed at
Gfistresen% dsueton.
GI-Ostrom reserves the right to use in advertising, as the
OA fah./ Internet sites GullereamsAde0S. promoting or
othenstse supporta° the business of Cunneen\ Inciudre
wakes imeaoca copYng, ram:duct/a% ph1shing in a
Before and After coffee table beck, n hole or in pal.
Indvdually a In conjunction AIM other matcrials.
The aircraft and oanosimp information ...al Mt be included
in any pubic Nblicabch
Buyer is prended with the falowng photography after
aircraft delivery:
One (I) electronic copy et areran FeCteg-arwe
3st Oxman (Ka-hand) Nigh-Speed Data
installation - (Ref. Item 5 2.2 of Proposal me
7035248R03)
xt Convex (ca-band) Mgh.Speed Data Sr-tern Instaltsban
Ca-Ostrom kyr' instal this latest swum of high-speed
firoadeand aata SyStetn.
Ore (I) Modem Manager (MCOMNI) will be installed in Me
aft baggage compartment Mance. cabinet. If Sat TV a
installed, the exating cabnet will be modged and reused
unless the cost exceeds the new canon instalaten.
AS the overall manager for the system, the MOCNAN IS
responsible for providing the user interfaces to the
aircraft/Passeurn
One (1)Aerefgutlai Personalty Module (AFM) wit be
loaned in Me baggage comparonent eritirent cabinet and
hems the configuration data For he system
One (1) Ka-bend IkorrA Nehmrk Data Unt (KANOU) will be
installed In the boiler room. The Keirei receives
commands from tie HOOMPI Trough an Ethernet Interface
to merging the antennall(REU and reports status oar
this Ethernet interface
One (I) sa.band Frequency Unt (KRIV) will be neater:1n
the prnornty of me MIA assembly on toe of the tal
empennage.
The KRA) contains a Nod-Goan Gornerter (BOC) to
convert the received Ka-band frequencies to IF fretruendeS
and also is made up of a rods-up Comae. (WC) to
convert the If frecoenoes to Ka-band frequencies. A High
poner *molter (HPA) :sways me send strength for
trans:visual by the antema.
One (1) Tail Mounted Antema (TIM) wil be mounted on
Reeoludon
Pertained. Rap Rote Inspection pox to paint per 6550 AMM 27-50-00 Rev. March 31/17.
See terns 8.23 6. 8.24 tor gasames
Ben Ridgdll GAC MRB 01680
12115i017 6:2803AM
Gulfstream Proprietary Information
hoc 12 a /9
EFTA00796574
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Disaapanet
Resolution
top of the tail arpennage underneath the radcme.
The arterna system is to amore and establsh
communications wth SatellteS In WOWS atitS t0 enable
beyond lintel-
richt orimusicatan between Strome, ground foal, end
gaud transportable terminals.
The Radome yin be renXrced and replaced by a new Ka-
band capable radorne.
Certification: The Jet Cana (Ka-bard) High-Speed Data
System along with the Sakern Direct Router wit be
Installed ea Waster STC: meted.
of STC,
4th Quarter 2017.
••• SEE AP9f-NDIX •••
15.1 .1
In
miores &retro) tape Avionics
Progress
15.1.2
In
latch Engr Later MOM=
Progress
15.1 .3
In
AV1 Systems Test Lagar Cn)y
Progress
15.1.4
In
MI /Electrical Labor Only
Progress
15.1 .5
In
Mei Sheet Med La00r OM/
Progress
15.1.6
In
INT Swoon (RSA) Labor Olt
Progress
15.1 .7
In
SC MaIntenante/Hargar / Primary Codes / Touch Labor Only
Progress
15.1.8
Open
SC Pant Labor Cily
15.1 .9
In
Inspection La00r Ccry
Progress
15.1.10
Open
Weight and Bake= Labor Only
15.2
Venting
COMPLY WITH DRAWING CPE303000090 REV. B (KA-
400rOulli
P:0)
0.1
15.3
Open
Comply with GfX303001004-501 Rev B
15.7.1
Completed Removed existing antenna structure bracket parts
GC544030069-13, • It • 15, and -16 at P15993.60,
renewed weight is .45 lbs , one 115901152050-001 and
-002 .25 lbs each, one each 1159GS52014-067, 068 end
059 removed weight is .10 lbs end, one 11594352014-059
remxrred weght is .05 lbs per 01YGe GPX303001084-S01
Rev F (kA BAND - GSSO INSTALL)
15.3.2
Completed Vented parts from stock; GPM304001379-301 Tray Saw,
CP4468001411.301 GAS Fan Duct Any.
GPM304001379.101, CP14304001408-101.
GPM30400t409.101, GPH304001407-101,
GPM304001380-301, GM904001381.331,
GPM304001383.301, CP14304001382-301.
GPM304001405•101, CP14304001405-101 Brackets. LOCate0
and driled noted parts at Vat Stab PS. 1033.1 Eq. 0.0 per
GPX3030010134-501 Rev.
tog TO INSTALL)
15.3 .3
Open
Installed GP/4304001379-301 Tray 065Y,
GPM468001411-301 Guided Fen Dust Any,
GM4304001379.101, GPH304001408-101,
GPM304001409.101, CP14304001407-101.
GM43D4001380.301, CP14304001381-301.
G44304001383-301, GPH304001382-301, tea
GPM3D4001405.101, CP14304001359-101 BratketS. MI work
performed per GPX303001084-501 Rev. F
15.3.4
Completed Request Engineering Disposition: On the
Engneering Dspositen:
GPX303001084-501 &airing, malty Flog Noe 7 as diens.
The mu:steel Mange to flag note 7 are acceptabe to eryneang and are a Myer change.
Rep 2 mould reed: QOM Pltell and roll measurements In
the nose landing gear bay using a maolevet on production
installed levelng brackets. Set pitch of antenna tray to
MREP7356
Jason Grardban
-1.00 degrees withn +1-.25 degree Fran readings taken
from production installed leveling brackets.
15.4
Completed Comply WIN CP04160001469.301 Rev.--.
Cabinet bought Iron, stock. Reference step 15.4 a1
15.5
Waiting
Carla with GPX4680001547-301Rev.A. (Mery rent Amy.-
Complied with GPX4680001547-301Rev.A. (Pcnurrent Assy.- EttggageCabnet APH, MCOMAN G450/ 6550) See
aPProval
a.)
Ettggage Cabnet APf4, MCOSVUI - 0450 / G550)
steps tam for work pertained.
15.5.1
Open
VOIDS" Ref Step 15.18 For seek Performed.
15.6
Waiting
Comely with CPX468031549-501Rev.B (KANDU instl.)
Complied with GPX468001549-501Rev.B (URDU irritt.) See steps below for work adorned.
Imp
15.6.1
Completed Yenned parts from stock. Located, and dnlled
GPM30400t349.30l Hountrg Plate Assembly, (1)
GPM304001351-301Kancki attadaent angle assembly and
(1) GPM304001351 KarOu attachment ange assembly to
the areas at FS 890--905 VA 115.
--OK TO INSTALL--
15.6.2
Completed Installed (1)GPM304001349-301 Moulting Plate Assembly,
(1) GPM304001351-301 Kandu attachment angle assembly.
and (I) GP/4304001351 taros attachment angle to the
12152017 62110AM
Cul/stream Proprietary Information
Pap< O,42V
EFTA00796575
Work Order:
5O521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AP
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or same Friday on Mondays)
ASSOC
SIMMS I
Resolution
IS.?
Ye/slang
Wormed
(L)
15.8
WAND
Wormed
(1)
15.9
WAND
Wormed
(L)
15.10
15.11
MOM
40(04
(L)
Waibng
aPPrOyal
(L)
15.12
Ye/slang
Wormed
(L)
15.13
Waltirg
Wormed
(L)
15.14
Waltirg
Wormed
(L)
15.14.1
15.14.2
COmOleted
GPM
15.15
Waiang
Wormed
(L)
15.16
WAND
Wormed
(L)
15.17
Waltirg
Wormed
(L)
15.18
15.18.1
15.18.2
Waltirg
aL0,04
(L)
Waibng
Insp
GPM
15.19
Waibng
aPPrOyal
(1)
16
KA BAND HARNESS PAIIIIICATION
16.1
In
Progress
16.2
in
Pr (Kir.,
17
ASC 085A XM Weather Installation - (Ref. Item 8 2.3
of PrOpOSal IDs 7038248 R02)
17.1
Discusser/
aircraft at FS 890-905 WL 115 rang Bkieprot sellout
ha-Orme.
Al hodi performed in accordancexiM Map
GPX468001549-501 Rev B
COCTOV ?AIR GPX468031557-501 Rev B ( BAGGAGE
CABINET - APM, MODMM INSTL GSSO)
COmptv with GP% 303001139-501 Rev - (RadOrne
COMPLY WITH DRAWING GPE3030C0393 REV. A (KA-BANO
TAIL WIRE HARNESS)
COMPLY WITH DRAWING GPE303000092 REVA (KA-BAND
BAGGAGE WIRE HARNESS)
COMPLY WITH DRAWING GPE303000091 REVA (KA-BAND
WIRE ROUTING)
COMPLY WITH DRAWING CEE370C00013 REV.— (CCCIG'IT
SWITCH PANEL MOO KA.BAND)
COMPLY WITH DRAWING CEE394C00014 REV. A (AUX C.B.
PANEL MOD)
COMPLY WITH DRAWING GPE370300026 REV. A (COCKPIT
SWITCH PANEL MOD. SDK)
RenXwed obsencees seat Ini; 11595C7501•1 St4:201-1425.
from aircraft tor avionics Install per 6550 ARAM 25-11-02
Rev.31/17.
Reinstall observers seat Ftl: 1159SCFS01-1 SN: 281-1425,
after avionics install Is compacted per 6550 ARAM 25-11-02
Rev.Mar 31/17.
COMPLY WITH DRAWING GPE429000032 REV.F (SCR)
COMPLY WITH DRAWING CEE4290)050 REV. A (CABIN LAN
ROUTER MCC)
COMPLY WITH DRAWING GPE429000037 REV. A (SCR
WIRE ROOTING)
COMPLY WITH CE5430X063 Rev ( 415C MODS- KA BAND
INSTL)
Vented locations and petted (2)a/451836-3 Inserts fa
644806002351.101 Ao3le, (2)7143)836-3 Inserts ra
644805001267.101 Ao3le, (6)7143)836-3 Inserts ra
GPM004001496-101 and GPM004001492.101 angles. (2)
KAS1836-3 Inserts fa CE444290002-103 Maranon= Panel
Asw, (2) NA51836-3 515015 for CE444290002.101 Relay
Rail, aid (4) NAS1836-3 1R5015 for 1233-F-2191-10 SattOm
direct Router. All work performed per CES43030053 Rev -.
Located and rotated (13) CB4019G3N7SPOITe Down Any
IO Cabinet for electrical wring installation. All work done per
*awing CE54303C053 Rev •.
COMPLY WITH DRAWING CES1 4290267 Rev -. CABIN LAN
(1400)
COMPLY WITH GPE303000093
COMPLY WITH GPE30300e097
In
Progress
ASC 065A XM Weather Installation
This Service Change instals an antenna, receher, too (2)
data ports and assodated wing fa the *1 satelite
weather SyStem.
ether a tore or an aft instatation may be selected based on
aircraft cooteurabon.
AMYL Mat are Provisioned for AM Installation may recmire
an °mimeos review 10 compete toe 'rotation.
Pnwhiccis may rod** wring, &razor*, recover, data ports
or any combination of these components and are typically
installed poring competition.
PrereRtigteS:
ASC 908 - PkneVIew Mager Operating Software System
SORWare Upitite (Cart Fox)
Prior tot or at the time Ms A5C is ordered, operators villi be
reot'red to semi., a configuration report Or toe
Complied with GPX468001557-501 Rev B ( BArtrars CABINET APM, MCOMAN INSTL - GSSO)
Ref Step 15.18 for work perfcemed.
12'15,7017 6:21:01AM
Gel/stream Proprietary Information
Pay la of 29
EFTA00796576
Work Order:
SC521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawkn au
Yellow = Newly Added Items Green = Changed Rems (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Anor
Sat% I
Dbwepanw
17.2
Waiting
aPeroved
(l)
17.3
ridt.%
approval
(L)
17.4
riattlna
<dermed
(L)
17.5
Waløn9
aPProval
(A)
17.5.1
Completed
17.52
Completed
17.6
Compkterl
18.1
Central Hantenarce Computer (CMC).
The C% report an be stored cn me aircraft PC laptop
men Wc-L/0mm
suirnitted to Gulfweam at
/Son rorte (3) to fem (5) dyrs le me OIC rapar! review
and up to Mutrene (21) days (or the~
danen
ODI1Ord Data disk.
EttedMhe Trill SeMoa Mange a apoicable to alraalt
Serial Msnbers 5001- ~ert
Notes:
Internt aocess toreform this installatIOn 15 ret inclocied
me kil trace.
Airport md.:jurati
install ion Iscatai d the system
ard avaitaomy
ot
spare yrinng "ly milan year hours,
an/Juni Ce at (ESS reDueel end coud necesstate aootcnal
eng neenng.
ThisASC 5 a managed Frogn:in. Incorporatcn rust be
COOMInated InrOu% CUNtrearn Artrast Scneouring at
800.810-61As (4853) M 912-965-4178-
If not scheduled, armraft ~rene codd moane
egrifpardy.
II% Stryke Cnancre may only te nstateo at a atfstream
Aerospace
CMP GSSO 970051 ASC 85A »I ~Na Iratallaben
COMPLY WITH DRAWING 11595557976 REV. A (»I
MATER)
COMPLY WITH DRAVANG 11595557977 REV. A ( XM
MATER WIRE ROUTING)
COMPLY WITH 11555547%5.15 REV.0 DIM ANTEN%
INSTL.)
Located and driled 11595847985 -19 dahle and tRo
1159584795-25 nralatra Omtalen . Ce to «tall per
11595541985 Rev C <kamre . Ret Red p9 18 C.
InstaBed 11595847986 -19 doubler and Mo
1159584790525 notpote datters per 11595847985 Rev
C bana% . Ret RM prj IB C.
CMP 6550 316705 XM ~Mer Antenna - Renoval
Installaticn
■
Ase
912 and ASC 123 Pbnerfew MOS Upgrede -
(Ref. Item 8 Le of Proppsal ID* 7038248 R02)
In
Pregress
18.2
ConaSeterl
18.3
Completed
ASC 9:2 ned ASC 123 Plsr.new MOS
ASC 912:
ibis Senke Mange (ASC 912) InStall5 tis maneYen master
oDataene System (m05) software Mella Part (Omner
(1%) MM7031235-024.
AMC 123:
na Service Range (45C 123) bads a combinaton of new
ant ending software basedon <urent alioart
configuratian.
Prerepietep
Sutene an APM Seteres 8 %anes lotto
ASC 910 . eDneVien, MOS Software Update or later; er
ved-vinn equivdent is Ne rnnmum cert levd required.
Pnce to, er at the urne ms A% a ceOrred, apsatars vrii be
tepured to suneD a eorth9aratson report of the
Centra Maintenante Computer (CMC).
The CMC repal em be stored on me drent PC leptcp
Nen electrencal sulanutted to Gulfstream at
Operators utaana CuRem ETertrOniC CneedISt (Ea) mist
aen new %ethvert. Pnet to, or at the time tNsASC
Nanna. satsvare may ce ordered from em~
EO.
page on vnGulfstreamcorn
tonearret Requirements: MC 912 and ASC 123 we
complkd niro in ccmunction.
eneavity: rna Service Cnamje K apoicable to antatt
&dal Nulte!, 5001 - 5549. ThiS. Of a såmoe denge, MI
be
installed clunng insal phase ~ur/letemg on arma Send
momsas 5550 and nesecuent
Notes:
Aka% that do not med the prerecubite minimum levd (or
mcdificatian may utast dumma 11595857083 to
n»at
te
bets
regulrerne
Of MC 107 and ASC 910. TI%
nen) near
ona
eused coocumently
vil
MC 123 and
MC 9:2.
Abc:art te m drøning 11595857010 to nettene
pereouste namn" reaultements or ASC 107 ard MC
910
Support et a managed ecegeam condisted by Product
Support Program Management (PSPM).
CMP 6550 979120ASC 912 PuneVietr Mager Coeraeng
System Scarrere Update
CMP 6550 9712304SC 123 Pta-idem AL‘erres
Roodudon
COMPUED WITH 11595547985.15 REV.0 (X4 ANTENNA D1511..) SEE STIPS BELOW FOR WORK PERFORMED.
REFERENCE CMP 316705 (STEP 17.6)
COMPUED WITH CMP (550 316706101 Yromner Antenn Removal i Instalation
COMPUED %VIN CMP 6550 979120 A5C 912 mannnew Master °matine System Software Utelate
COMPUED Orrfil CMP 6550 971230 ASC 123 PlerieNew Arenes Enhancement
1245..2017 6:2153AM
Gulfslreaen Propriet/sy Infnation
Pace IS
EFTA00796577
Work Order:
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks•. MI
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
ASSOC
Stades
18.4
Completed
18.5
Completed
18.6
Completed
18.7
Can: Pete]
18.8
Completed
18.9
COmp/MCI
18.10
Competed
18.11
Carpeted
18.12
Completed
18.13
Completed
If
19.1
Open
Discrepant/
Enhancemert
OW G550 319010 lbneywel Ptaneview Operational
Software master OPerardr9 System Top Level System
(VMite Disk)
•••VOID• • • CMP GSSO 319015 Honeywell Planeview,
Conigiratix (Piraaft Opbons) Software Top Level
System (Yellow Disk)
CMP G550 319017 Honeovel Planeview, Aircraft Optons
Data Software Weds, (White Disk)
04P 6550 319020 Gulfarearn, Electronic Dedlist Seetware
(Pa* Disk)
CMP 6550 319025 Gulfstrearn. Setang / Rigging Software
(Grey Cask)
OAP 6.550 319040 GUINtrearn, CommunIcadanS
Management rtmcmn Amine modinable Informatics, (AMI)
Software (Orange Disk)
OW 0550 319044 GuIrStream, Programmed° CAS
Messages Software (Turquoise Disk)
01P G550 319030 Gulfstrearn. Central Maintenance
Computer Loadable Diagnostic Irionnation Software (Black
Disk)
CMP 6550 319110 ATC Data Base du Vpdate
Comdy vain GvSP.GE.R.7 32 RTS Chtdwix Prccedcre
Rowena Woodwork • (Rd. Want A Li of Proposal
20* 7039407 R00)
Reveneer WcCdAt.S.
The exl≤trol'ovrieer COMM COT 00001,3 MI be removed
km the arcraft and stowed of all veneer surfaces,
Katmai caps. and nosng.
Al subsbate mill De Cleaned and pepped for aPPliCanan o
new selected ‘treer (III 170718.2 QM Slyer Brai)wth
correspordng AsOnccd caps and nadng.
Modficaticns a repars to any substrate material or
%wawa, hard/are will De evaluated and addressed on a
time and material bass.
Al the exatng Latches mill be deaned and retained, New
hrdware, d requested, MI be addressed on a tine and
meteriaN basis.
New Customer Selected Veneer MITI be aDDled to the
existing substrates.
The new veneer will be finished with Gulfstream standard
141411 Clear coat finish and poisbed to a Predetermined
luster.
Al applicable eternal surfaces Mill be cleaned and retaned
In edging COniltien Paining a recoQem) fie the internal
SWIMS yin be addressed on a tine and materials basis.
Inlays of any type uach as wood, metal• car gone inlays are
not included in this proposal. Exlgrg relays MI be
evaluated on a case by case basis and addressed onetime
and materids bass.
Burn certificate° a indebted upon the costing substrates
meeting al the FM flammablity requirements. Gulfstream is
not responsb* for any existing materials meeting pars
reotoenents.
The recovered dons, prods, and cabinetry will be
reassembled and mutts it aircraft. MI adjustmentsMI be
made to ensure Cones Mt aid function.
ECNIPMent relOCa000 k net Part Of ttiS proposal and wit be
addressed metro and inseends base.
In SEE APPENDIX FOR ADDITIONAL INFO ••'
19.1.1
In
AI fEleCtilcal La0or OW
Progress
19.12
Open
INT Sheet metal Labor Only
19.13
In
Wood Labor Only (270 )
Progress
Deducted 270 ban from the original 1897 hours for vendor
supplied lobo- (SAPS)
19.1.4
Open
INT Finish and Paint tabor Onrir
Total Mors 405
OutSde tabs fa 11/27 W 12/6
197 hrs
RellOkidOn
COMPLIED WITH 04P GSM 319010 Ilawywell Maneview Op:rat/nal Software Master Operating System -Top Level
Waal White Disk)
Pfl OFF: 037031236-00323
Pfl ON: 837031236-0032S
SN OFF: 35582318
SN ON: 356269E2
•••VOID•••ENTERED IN ERROR SEE ITEM 18.6
COMPLIED WITH 04P G550 3190171bnewiell Dian
NI OFF: DM60002648-50047
Pti ON: DV 60002648.50078
SN OFF: 5173
Sit ON: 5173
COMPLIED WITH OW 6550 319020 GullStreany Electronic Crieddist Software (Node Disk)
COMPLIED WITH 04P G550 319025 Gulfstrearn, Seftirg / Piecing Software (Grey Cask)
COMPLIED WITH CMP G550 319040 Gullstrearry Communications Management Flatten Aldine modeia0e Information
(Awl) Software (Orange Disk)
Aram Options Data Software - Reda (MX DSc)
Pf4 OFF: 69001791.503
PN ON: 69001791.505
Sri OFF: GM 20AUG2013
SN ON: CDC O41UL2017
COMPLIED WITH CMP 6550 319044 GultMedrn, Progammade CAS messages Scrtwart (TURIU0Se Disk)
COMPLIED WITI CMP G550 319030 Gulfstream, Central Mart/nonce Computer Lendable Diagnostic Information
Software (81mk Disk)
PM OFF: GY_911 00323 01_022714
Pti ON: GY_912_003:5 03_052317
SN OFF: 5173
SN ON: 5173
COMPLIED WITH CMP G550 319110 ATC Data Base Dec • Update
Complied with GYSP-GSR-7132 RTS Checker/ Precedire
Reference papa'copy (rdee 9A) line signs for Mork Performed.
IIIISROI7 6:21.01AM
Gulfdreom Proprietary Infonnetlan
Pate 16 0'29
EFTA00796578
Work Order:
5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
-Cl
Resolution
Outside Labor for 12/4 to 12/10
208 In
19.1.S
In
'HT Sapped (R8A) Labs. Cnly
Progress
19.1.6
In
Inspection Labor Orgy
Progress
19.1.7
Open
ElarornabiltT / Muted, Labor Orly
19.1.8
In
Wood ShOP Labor to Stelp Fuser., Veneer.
Progress
19.1.8.1
In
Strip Veneer - Rll and LH 680 &Alma& and Door.
Complied with Labor to striprenew kern the RH and LH 680 bulkheads and doze.
Progress
19.1.8.2
In
St® Veneer • AFT LAY WOW and SOME
Progress
19.1.8.3
In
Sins Yenta - AFT Lay Varety
Progress
19.1 8.4
In
StrO Veneer • AFT Ul C1OSet.
Progress
19.18.5
In
Strip Veneer - Art RH acad.
Progress
19.1.8.6
In
WO Veneer • AFT LH Gal/W.
Progress
19.1.8.7
In
Sire Veneer - AFT RH Galky Annex.
Progress
19.1.8.8
In
Sin Veneer - 4 Dian End Cabinets.
Progress
19.1 8.9
In
Strip Veneer • Cabin LOOK.
Progress
19.1.8.10
Open
Sin Veneer - Console Tables.
19.1.8.11
Open
Sin Veneer - FWD Fodcet Door.
19.1 8.12
In
Stro Veneer • FWD 814 and LH Cabin Bulkheads.
Progress
19.1.8.13
Open
Sin Veneer - PSU Hardrals.
19.1.8.14
Open
Sin Veneer - FWD Crew Refresh Cabinet.
19.1 8.15
Open
Aro Veneer • FWD RH Law.
19.1.8.16
Open
Sire Veneer - REIM and LEER paneb.
19.1.8.17
In
Sire Veneer - ACOSX Door.
Progress
19.1 8.18
In
Stro Veneer • EnIn Panels (2)
Progress
19.1.8.19
In
Strip Veneer - AFT LAV Door.
Progress
19.1.8.20
Open
Stro Veneer • FWD Lae Door.
19.1.8.21
In
Strip Veneer - !lawns Rads.
Progress
19.1 .9
Open
W000 Shop Labor to Reveneer Minas.
19.1.9.1
In
Law to Veneer LH and RH 680 Bulkheads and Door.
Progress
19.1 9.2
In
Law t0 Vereer
LAV Niche and Synod.
Progress
19.1.9.3
In
Lace to Veneer -OFT Lay Vanity.
Progimss
19.1.9.4
In
Labor to Veneer AFT LH Closet
Progress
19.1.9.5
In
Lady to Veneer -AFT RH Closet.
Progren
19.1.9.6
In
Labor to Veneer -OFT LH Gate,.
Progress
19.1.9.7
In
Lace to Veneer -OFT RH Galley Anna.
Progress
19.1.9.8
In
Labor to Veneer 4 Coen End Ca0nets.
Progress
19.1.9.9
In
Lace to Veneer Cabn Ledges.
Progress
19.1 9.10
In
LOW tO Veneer - FWD Pocket 000r.
Progress
19.1.9.11
Open
Labor to Veneer FWD UI and RH Bdkheads.
19.1.9.12
Open
Labor to Veneer PSU Hand Rads
19.1.9.13
Open
Labor to Veneer FWD Crew Regresh °dna
19.1.9.14
Open
Leto- to Veneer FWD RH Lay.
19.1.9.15
Open
Leto- to Veneer LEER and liter Panels.
19.1 9.16
Open
Labe/ tO Veneer - ACOuStle 000r1,
19.1.9.17
Open
Labor to Veneer - Entry &Ahead, (2)
12IS.2017 42lb, AM
Gulfstream Proprietary Information
Pape 17012'0
EFTA00796579
Work Order:
5C521661 AC: 5173 STPI: Charles Thomas SCC: Julian Brown Squawks: Ali
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Discrepancy
Resolution
19.1.9.18
19.1.9.19
19.1.9.20
19.1.9.21
19.1.10
19.1.10.1
19.1.10.2
19.1.10.3
19.1.10.4
19.1.10.5
19.1.10.6
19.1.10.7
19.1.10.8
19.1.10.9
19.1.10.10
19.1.10.11
19.1.10.12
19.1.10.13
19.1.10.14
19.1.10.15
19.1.10.16
19.1.10.17
19.1.10.18
19.1.11
19.2
19.3
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Onen
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Waibng
Into
WAN
aPprowd
(1)
Walen9
aPprowd
(1)
Labe- to Veneer AEI' Lav Door.
Labor to Veneer FWD Lav Door.
Labor to Veneer Cceisole Tables.
Lass tO Veneer Madeline RaCkS-
Wocd Shop Labor to Assemble Labatt.
Labe- to Assemble Ul ard RH 680 Bulkheads and Dear.
Labor to assent*
tav tiple and Wroud
Labor to Assemble AF7 Lav Vanity.
Labor to Assemble AF7 W Upset
Labor to assent» - AFT PH 009it.
Labor to assent» - AFT UI Gatey.
Late- to Assemble AF7 AH Galey Amex.
Late- to Assemble 4 Divan End Cabinets.
WØ tO Anemia* - Can Ledges.
WØ tO Anemia* - COnSede tatieS.
Labor to Assemble FWD Podiet Door.
Lat t0 Assemble - FWD UI and PH Cahn Bulkheads.
Wt tO Assemble - FWD Crew Region Cabinet
Labe- to Assemble - FWD PH Lev.
Labe- to Assemble - Leet and Reef Panels.
Wt tO Anent,* ACOuSIJC DOGS.
Wt te, Assemble - AFT t.av Doer.
Labor to Assemble - FWD Lav Door.
•••Entered in Ester
FlanYnablIty Data.
arid Rewneer LH and RH 450 Bulkheads and Door.
Sao and Revmeer AFT tav NChe and Shroud.
19.4
19.5
WMOng
a—
(L)
Waibng
a—
g.)
WO and Revmeer arr tav Vanity.
Stnp ard Rovmoer AFT W Omet
19.6
19.7
19.8
Waibng
aPProval
D.)
Waltn9
aPProval
(1)
Waltn9
aPProval
(L)
Strip ard Kameer AFT RH Closet
Sao and Revmeer AFT tu Galley Assy.
Stao at Revmeer AFT RH Gate, Amex ASSY.
19.9
19.10
Wale%
a—
(1)
Waibng
awaws
(l)
WO and Re«neer 4 DWan End Cabinets.
Strip and Ramer Cabe, Ledges.
19.11
19.12
19.13
Waibng
aPProwd
(l.)
Water.,
aPProval
(L)
Water.,
aPProval
(L)
Stnp and Ramer Pocket Door.
StM and Re•eneer FWD UI and WI Buldvarls.
WO and Reoeneer PSJ Hanealls.
19.14
19.15
waiting
a—
(L)
Waibng
a—
(L)
Stro and Re«neer RIM Clew Refresh Cabinet
Strip ard Rmeneer FWD RH Lav Assy.
19.16
19.17
19.18
Waibng
aPProval
(l.)
Walen9
aPProwd
(1)
Walen9
Sim and Rmawer LEER and PEER Panels.
SD° and Re•eneer acoustic Doors.
SD° and Re•eneer Entry %kneads
12, M2017 6;21:03 AM
Gulfstream Proprietary Information
l'am Igor
EFTA00796580
Work Order:
50521661 AC: 5173 SIN: Chart Thomas SCC: Julian Broym Squat: Ali
yellow = Newly Allied Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Nam I SIAM
19.19
19.20
annoyer
(L)
alt
g
agOroval
Waibng
a00ronal
(1)
19.21
Waibng
a00ronal
0-)
19.22
Wailing
etyma
(U
19.23
Waiting
ran
(-)
20
20.1
OPen
20.1.1
20.12
20.1.3
20.1.4
Open
Open
Open
Open
20.1.5
Open
20.1.6
Open
20.1.7
Open
20.1)3
Open
20.1.9
Open
20.1.10
Open
20.1.11
Open
20.1.12
Open
20.1.13
Open
20.1.19
Open
20.1.15
open
20.1.16
Open
20.1.17
Open
20.1.19
Open
20.1.19
Open
20.1.20
open
20.121
Open
Disalpanor
Stop and ReKneer 3 Console Tables
Strp and Renmeer AFT lay Door.
Dap and Reasneer FWD Lay Door.
Srop and Reasneer Magaare racks
Sett one rev wth closet, credenza and Mt ow, rehash
cabinet to SAPS fa strip and revenea. Pictures taken for
documentation.
Re94ba0ae Change
a
COrrfifir with registratiOn Change as calmed In RECCT*115
Rev. 12.
Registration charge to 14212X.
Customer requests that the Guirstream ODA issue a
replacement standard atm.:ahem= certifieate Are to
registrathin crave. Provide t0 the ODA the f011FrAng
items:
A. A cepf of the Ai:Mader cover Meet with current haws
and IP-dings.
8. Standard AhvartinessCertnate, FM Form 8100-2.
C. Ceroncate of MOM Regstraticn, AC Fern 80563.
Requre a written onprol statement signed by the
registered awe or certficate °Fedor to requat a
redaoement afrnortniness certMcate. The request Shall
include the resist:awn number. Serial nunDer, make and
model d the aircraft as well as the reason for the request.
Renew the arcreA reostes and nspect the aircraft to
ensure me request Is Justine, and the await is eligible for
me cerdicanon requested. Records review consists
ventmauan that there are r preen inareenance due aCbCetS
or amorthmens drectives.Arcraft meatus coasts of a
data date and registration marking marrination, wen a
visual rose./ or me aircraft for 01,4005 COntlitens impacting
aircraft safety.
Verily current arro-aft re0stra00n, reference 14 CFR 07:
Nara copy Regabation AC fpm 8050.3 for new registration
rumba or Assignment of Spxial Registration Nuirbs AC
tom 8050-64 drid heed airy of old Aerobia° AC ram
8050.3 8050.3 or Deaier Rept:eaten AC Form 8050-6.
leafy new registration number is treatedon the await.
Rd: 14CFR 45. 23, 45.25, 45.29 & 45.33.
Verify aircraft ID Mee instdlabcn. Rd: 19 CFR Part 45.
FM form 81C0-2 Mote for new regstranon number by
arfsvean ODA.
If the winner defers Gulfstream COA issuance of a
replacement aims:Rhine= certificate, a Cants- mu/ink will
be Signed as deemed by the Cugemar. Rrel : 14 CFR
91.203 (a) (1)1.
Re-strap/ Re-program transponders to new registration.
(Transprorelers with Mode 5)
Reibipfite Program SELCAL CO new code F Own011117
changes.
Cornmenn SATCOM for new moat., ce Re•Strap SDU
foe new registration number Change.
Reconnect° Magnastar, Nrcell. & Kir
systems.
Centime MIS. Now tnstdlatices or regstrabon nunba
change. Re-strop via Laptop.
Install new regstraton minter daardS in cockpit.
Insoles' new) SEI.CAl. number in cockpit.
Change logo on Amboy. f Catinview, if ownership changes.
Re-strap or re-program ELT's (90614112)n aircraft (As
rectired to new registration and I or county Cede).
Reconfigwe highS
Data Units or 8Mi
Rearing-re Display Controlers Tail number f SELCAL
Vainly Paper regStraDOn of ELT's (406191-12) ( If Instated In
life molt).
Rearing-re the Erhanced Flight Identifialson Code to the
current rept:Paten
20.122
Open
Wain a copy of me feart Certricate of aawarthiness.
Foreign ArnatIlifteSS Certificates, all Foreign ROSIISbatkin
Documents and archive with the walcader.
ReedudOn
17/110017 6:11:01AM
Cul/stream Proprietary Informalion
Palo ION 29
EFTA00796581
Work Order:
SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
ASSOC
Shuts
Discrepancy
Resolution
21
12 Month OSP Tasks (Exhibit]) - (Rat Stan C 1.1 of
Proponent.* 7039702 ROO)
21.1
waiting
aPProyal
AcconAIM 12 Month CMP TaSkS (Exhibit 1)
Notes:
(L)
Cerrection of decrepancies a rot included in the quoted
oce.
matenais/ Outside Services will be tilled as rectired.
21.2
Open
CMP 6550 237004 COMM Voice Reterder Operational
21.3
Open
Test
CMP 6550 240121 Emergency Battery Power System (Left) •
OPerational Test
21.4
Open
CMP G550 240122 Emergency Battery Power System (Right)
- Operabond Test
21.5
Open
04P 6550 240123 Emergency Battery Power System
(Forward). OPerational Test
21.6
Open
CMP G550 240124 Emergency Battery Power System (4/1)-
OperatioeS Test
21.7
Convicted 04P 6550 243011 L Man Battery - CapacityOw*
COMPLIED WITH CMP G550 243011 L Main Battery • CapaOty Dyck
21.8
Completed 04P 6550 243012 R man SOAPY 00acRY Check
COMPLIED WITH CMP G550 243012 R Main Battery • CapaOty Check
21.9
In
CMP 6550 256043 Few Aid Kit (No. 1) - Details Inspection
Progress
21.10
ComOkted 04P 6550 256071 flashlight (Ho. 1) - OpealionalOyck
COMPLIED WITH 04P G550 256071 Fiashliga (No. I) - Operational Crreck
21.11
Completed CMP G550 256072 FtoshIght (No. 2) -Operational Test
COMPLIED Willi 04P G5S0 256072 RasNight (No. 2) -Operational Test
21.12
Completed CMP G550 256073 RashIght (Ho. 3) -Operational Test
COMPLIED WISH 04P 6550 256073 RasNight (No. 3) - Operatimal Test
21.13
Completed "'DELETE"' OW 6550 256161 mutual/at • Detailed
Medical kit not installed on this aro* per ncombn drawing 60528000312 Rev 8.
Inspection
Customer Signature:
(Oaten:: signature on File)
21.14
Completed •••DELETE••• Ceelo GS50 256162 ftedeal itst lime Limited
Medical kit not instdled on this aircraft per Iboe0br droving 60528000312 Rev B.
Supplies- Discard
Customer Signature:
(customer signature on File)
21.15
Open
CMP 6550 256201 Life Vest(s) - Detailed Inspection
21.16
Completed CMP 6550 256202 Lire Raft(s) (No. I) - Detaled Inspection
COMPLIED WITH CMP G550 256202 Lire Raft(s) (NO. 1)- Detailed Inspection
21.17
Completed CMP G550 256203 Lire Raft(s) (No. 2) - Deleted Inspection
COMPLIED WITH CMP G550 256203 Lire Raft(s) (NO. 2)- Detailed Inspeaion
21.18
Completed CMP GSSO 256282 Perscrol Ikeethro Equipment (1b. 1) -
COMPLIED WTI CMP G5S0 256282 Personal Breathing Equipment (No. 1) - Detailed Inspection
Details Inspection
21.19
Completed 04P 6550 256306 EnkeyawV Locates' TranstaRter •
coetwoogi Test (FAR 91.207)
COMPLIED WITH CMP G550 2563% Erna yaws, Locator Transmitter - Operational Test (FAR 91.207)
21.20
Completed CMP GSSO 262560 Trash Receptacle Enclosure (Mt
COMPLIED WITH 04P G5S0 262560 Trash Receptacle Enclostre (Mt Lavatory). Detaied Inspection
Lavatory) - Detailed Impaction
21.21
Completed 04P 6550 262561 TraSh Receptade Enclosure (Forward
COMPLIED WITH CMP G550 262561 Train Reavtacie Enclosue (Forward Lavatory) Cleated Inspection
Lavatory) Detailed IrepeCtiOn
21.22
Completed CMP GSSO 262562 Trash Receptacle Enclosure (Mt Galley
COMPLIED WIT( CMP 6550 262562 Trash Receptacle Erobstre (Mt Gales, 1 Arrtex) - Detailed Inspection
Annex) - Detailed Impection
21.23
Completed 04P G550 262583 TOM Receptade Fre Extinguisher
COMPLIED WITH 04P G550 262583 Trash Receptacle Fire Extinguisher NOMM (Mt Lavatory) - Detailed Inspection
Nozzles (Mt Lavatory) - Detailed Inspection
21.24
Completed CMP G550 262584 Trash Receptacle Fre Extinguisher
COMPLIED WTI CMP G5S0 262584 Trash Receptacle Fire Extinguisher Nozzles (Ponverd Lavatory) - Details
NOVI% (FOnsard Lavatory) - Detaled Inspection
Inspection
21.25
Compieted 04P G550 262585 TraSh Receptacle Fre Extinguisher
COMPLIED WITH 04P G550 262585 Trash Receptacle Fire Extinguisher NOMM (AR Galley / Annex) Detaled
Nozzles (Aft Galley/ Annex) - Detailed Ireprction
Inspect:3n
21.26
Completed CMP G550 262601 Portable Haim Are Extingusher
COMPLIED WTI CMP 6550 262601 Portable Ibbn Fre Extinguisher (CoMpt) - Inspection
(COMPIO • Inseecebn
21.27
Completed 04P 6550 262602 Ported° Haim Fire Extinguisher
COMPLIED WITH 04P G550 262602 Portable Haion Fre Extinguisher (Cockpit) • Weight Check
(Coduot) - Weight Check
Scab: 566768
Cal. Due: 04/18
21.28
corona
04P 6550 262621 Portable Haien Fire Extinguisher (Nt
COMPLIED \VIM 04P G550 262621 Portable Haion Fre Extinguisher (AR Ca0in) • Inspection
Cabin) - Inspection
21.29
Completed 04P 6550 262622 Portable Haien Fire Extinguisher (Art
COMPLIED 1VITH 04P G550 262622 Portable Haion Fre Extinguisher (AR Ca0in) • Weight Check
Cabin) - Weir Check
Seale: 566768
Cat. Dom: 09/18
21.30
Completed 04P G550 262631 Portable Hakin Fire Extinguisher (Aq
COMPLIED WITH 04P G550 262631 Portable Haim Fre Extinguisher (AR Lavatory) • Ir6pecbon
Lovett(?) InefeCtIOD
21.31
Completed CMP G550 262632 Portable Halm Are Extingusher (Mt
COMPLIED WIT( CMP 6550 262632 Portable Hobo Fre Extinguitlier (AR Lavatom) - Weight Check
Lambe?) - We5Mt Deck
Scale: 566768
Cal. Due: 04/18
21.32
Completed CMP G550 312003 BAITER?, PILOT 000(
COMPLIED WITH CMP G5S0 312003 BATTERY, PILOT CLOCK
21.33
Completed CMP G550 312004 BAITER?, COPILOT 000(
COMPLIED WTI CMP G5S0 31200E BATTERY, COPILOT CLOCK
12102011 6.71.0, AM
Gulfstream Proprietary Information
Puy Oo(20
EFTA00796582
Work Order:
SC521661 AC: 5173 STM: Chart Thomas BCC: Julian BrOwn Squawks: MI
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from pmylous day (or since Friday on Mondays)
&Hoc
Stains
Dlearpancy
Resolution
21.39
Compkted CMP G550 321803 Mein Landing Gear and Doors (IS) -
COMPLIED WITH CIP G550 321003 Man Lancing Gar and Doors (LeR) - lanai lrapection
Zonal Inspection
21.35
COmPleted OAP '5550 321804 Mn Landing Gear and Dovs (ROM) •
COMPLIED WITH ChIP 6550 321804 Man lancing Gear and Doors (Right) • Zonal Impaction
Zola' Insprxdon
21.36
Completed CMP 6550 322802 Nose Lending Gear and Doers - 2enal
COMPLIED WITH CIP GSSO 322002 Nose Landing Gear and Doors - Zonal Inspection
Inspectian
21.37
Open
CMP 6550 335020 Ca
EmerginCYUSerbng Operational
Test
21.38
Completed CMP GSSO 353002 Portable Oxygen Bottle and Mask
COMPLIED WITH CMP GSSO 353012 Portable Oxygen Bottle and Mask Assembly (No. 1) - Detakd Inspection
Assembly (No. 1) Defiled Inspection
2139
Completed CMP 6550 382003 Water St eillzer Mbar Discard
COMPLIED WITH CMP G550 382003 Water Stoker Filer • Discard
21.90
Completed CMP GSSO 521010 Mn Entrance Doe Lulmeitian
COMPLIED WITH CMP GSSO 521010 Man Entrance Door - Lubrication
21.91
Completed CMP GSSO MOOS Baggage Compartment Door -
COMPLIED WITH CMP 6550 523005 Baggage Compartment Door Lubrcaben
Lutdcation
21.42
Completed CMV 6550 525001 Ata PreSSure BUTOMO Dad Seal •
COMPLIED WITH CMP 6550 525001 Ater MOM.° BUlaTeati Mr Seal - Detailed Imp
Cooled Imp
21.93
Completed CMP GSSO 531015 Nase Gear Wheel Well FS 99 - F5119 -
anal Inspection
COMPLIED WITH CMP GSSO 531015 Nose Gear Wheel Well FS 91- FS 119 -Zonal Inspection
21.44
Completed 04P 6550 531045 Main Gear Vircei weds FS 576 • FS 632
COMPLIED WITH CMP G550 531045 Mari Gear Wheel Wets FS 576 - FS 632 (Left) • Zonal Inspection
(Lea) - Zonal Inspection
2165
Completed CMP GSSO 531096 Mein Gear Wheel Wells FS 576 - FS 632
COMPLIED WITH CMP GSSO 531016 Man Gear Wheel Wets FS 576 - FS 632 (Right) - Za.al Inspection
(Right) • bail Inspection
21.96
Completed CMP GSSO 531097 Mein Gear Wit Wells FS 576 - FS 632
COMPLIED WITH CMP GSSO 531047 May. Gear Vibes Wets FS 576 - FS 632 (Cam Panel Drain Holes) - (Enhanced)
(Care Panel Drain Holes) - (Enhanced) Za'S Inspection
Za'S Inspecban
21.47
COM/eted OAP 6550 531098 Main Gear Wit WON FS 576 • FS 632
COMPLIED WITH CMP 6550 531048 Man Gear Wheel Wets FS 576 - FS 632 (Wiring Harness) (Enhanted)20nal
(VMng Harness) • (Enhanced) Poni InSpeCOOn
Insp.:bon
2168
Mgr;
angora
••• RELATED CODES •
Complied WM related codes
(1)
21.49
Completed CMP 6550 243001 Main Battery (Left) • Removal
COMPLIED WITH CMP 6550 243001 Man Battery (Lett) - Removal/ Instalation
Installation
Pfd OFF & ON: 1159SCAVS19-1
SN OFF: 090520C069DCF
SN ON: 0905200106783
21.50
Compkted CMP G550 243015 Man Battery - Operaticnal Mack
COMPLIED WITH OAP GSSI) 293015 Man Battery- Operational Oiedc
21.51
Completed 04P 6550 243002 Main Battery (Right) • Removal/
COMPLIED WITH CMP 6550 243002 Man Battery (ROO Removal l imitation
Installation
Pfd OFF & ON: 1159S W/519-1
SN OFF: 09352001067W
SN ON: 090520006900E
21.52
Open
004 6550 256041 Fret M KR (N3. I) • Removal
Installation
21.53
Caraileted
i•CMP G550 256061 Fkahlight (No. 1)
44,./01C04• Not Removed Ran AkcraR
21.54
Completed iVOID•"CAP 6550 256062 FaShlight (NO. 2)
•n1/DID"' Not Removed Ren AkcraR
21.55
COrrerkted i'n/OID"'04P G550 256063 FaShIght (NO. 3)
InVOID"' Not Removed Ren AkcraR
21.56
Wotan?
approval
CMP GSSO 256160 Heckel Kit
(I)
21.57
Waitng
approval
PIP G550 256260 Ufe Raft (No. I)
(1)
21.513
Waitng
approval
CMP G550 256261 Ufe Rail (NO, 2)
21.59
Caro/ate] CMP G550 256281 PrOteCtive Bleating Equipment (No. 1) '
COMPLIED WITH OW CZ50 256281 Protecthe Breathrg Equipment (No. 1). RemOval Install/ten
RefrOčal Vista/anon
21.60
Completed alp GS-S0 256301 Emergency tacata Trarernitter -
COMPLIED WITH CMP 6550 256301 Ernergency Locator Transmitter - Removal! Installation
Removal InitaTation
21.61
Completed 04P G550 256311 Emergency Locate Transmitter •
COMPLIED WITH CMP G550 256311 Emergency Locator Transmitter • Operational Clock
Ocerational Check
21.62
Completed CMP GSSO 262600 Portable Helen Are Cilinmisher
COMPLIED WITH CMP 6550 262600 Portable Helen Fie Eitinglaher (Cadge) - Rend / Installation
(Gagpit) - Removal / Instalation
21.63
Completed CMP 6550 262630 Portable Makin Rie EnIngtssner (Aft
COMPLIED WITH CMP G550 262630 Portable Haan Flee EilinSuiSher (Mt Lavatory) • Removal / Installation
Lavatory) • Removal/ Installation
21.61
Completed CMP GSSO 353001 Bottle, Portable Oxygen (No 1)
COMPLIED WITH CMP GSM 353001 Borne, Portable Oxygen (No. 1)
21.65
Completed 04P 6550 38)039 WATER STERIUZER
COMPLIED WITH CMP t3550 381039 WATER STERILIZER
21.66
Open
04P 6550 381029 POTABLE WATER TEST
2167
Cerrosce CMP G559 I 82002 W.Y.tt Sterling H4• Remcnal t
COMPLIED WITH CMP 6550 382002 Water Stu Ozer Filter - Removal Installation
22
Discrepancies related to 12 Month CMP Tasks
t-
(Exhibit 1) - (Ref. Item C 1.1 of Proposal 10a
7039702 ROO)
Miscellaneous CMP Tags (Exhibit 3) - (Ref. Item C
1.30f Proposal 100 7039702 ROO)
23.1
Wallkg
Mcomoisn Miscefarwods CMP Tasks (Eg.6.
agprove/
Notes:
12115,2017
6:21:01 AM
Gulfstroam Proprietary Information
Peg 21,429
EFTA00796583
Work Order:
SC521661 AC: 5173 STA: Chart Thomas SCC: Julian PrOvin Squawks: All
Yelloiv = Newly Added 163,174. Green = Charged Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Sis
—
Tims
Dbaipancy
ResoMion
04
Ocrectkm e1 diereparcies is not included in the quoted
price.
MattilalSiOutelde 5eMeaS WI be tilled as rebtared.
23.2
COmPleted
CMP 6550 256019 EVAS SyStem (Left) PerOdle IMpeChOn
COMPLIED WITH OW 6550 256019 EVAS System (Left) • Periodic [lisped*,
23.3
Completed CMP G550 256020 EVAS System (Right) -Periodic
COMPLIED WITH 04P GSSO 256020 EVAS System (R4st) - Periodic Inspection
Inspection
23.4
OAS
CMP 6550 256404 Delltdrator Battery towel Cheek
COMPLIED WITH 01P 6550 256404 DelltrIllatOr Battery • !Med / Check
23.5
COmiSeted
CMP 6550 256407 De8tdlator Electrode Pads • Inspection
COMPLIED WITH CMP G550 256407 DelltrilgtOr Settee PUN • Inspection
23.6
Completed CMP G550 261419 Baggage Compartment Below Floor
COMPLIED WITH CMP 6550 261419 Baggage Compartment Below Flow Overheat Thennti Svitch - ruts:nal Test
Pretreat Thermal Serial - Functional Test
23.7
COmpletel CMP 6550 262624 Portable Hake Fire Extinguisher Wt
COMPLIED WITH 04P G550 262624 Portable Halms Fre Estingubrier (Aft Ca0in) • Final Pease ReStOre
Cabin) • Ara Pear Restore
23.8
Completed
CMP 6550 262626 Portable Hake Fire Extingusher (AA
COMPLIED WITH OW 6550 262626 Portable Ibbn Fre Extinwoher (AR Cabin) - Yeus Inspecbcn
Ca0in) • VisuP Inspection
23.9
COS
CMP 6550 262605 Portable Hokin Fire Extingtisher
COMPLIED WITH 04P G550 262605 Portable Nolan Fre Ekinguisher (Cockpit) r Visual Inspection
(Co pit) -lintel Inspection
23.10
CorrWeted CMP G550 262646 Portable Hake Foe Eslingusher (Aft
lavatery) VIPS Inaptt0on
COMPLIED WITH 04P 6550 262646 Portable Ibbn Fre Cetinje's:ler (Aft Lavatory) - Vaud !roped=
23.11
CON:AM 04P 6550 274202 HOreastat Roblin, Actuator -
COMPLIED WITH 04P G550 274202 NoltOrtal Sobloer Actuator • Lubrication
Lubicatron
23.12
Complete CMP 6550 282651 Mon Fuel Boost Pump (Left)
Fuel Leak
COMPLIED WITH 04P G550282651 Man Fuel Boost Pump (LA) - Fuel Leak Check
Cheek
rn 558064
Dee Cue 013/18
23.13
Completed 01P 6550 282652 Stan Fuel Boost Pump (Right) - Fuel Leak COMPLIED WITH OW 6550 282652 Man Fuel 800St Pump (Mont) • Fuel Le* Check
Peck
TY/ 558064
Date Cue 013/18
23.14
Completed 04P 6550 282653 Alternate Fuel Boost Pump (Left) Fuel
COMPLIED WITH 04P G550 282653 Ntemate Fuel Boost Pump (Let) • Fuel Leak Check
Leak Cried(
1W 558064
Date Cue 06/18
23.15
Completed 01P 6550 282654 Alternate Fuel Boost Reno (Right) Fuel
COMPLIED WITH 04P G550 282654 Memate Fuel Boost Pump (rodit) - Fuel Leak Ole*
Leak Cheek
TY/ 558064
Date Cue 013/18
23.16
Open
04P 6550 322004 Nose Landing Gear. lubrication
23.17
Completed
CMP 6550 323012 Landing Gear Emergency &tate
COMPLIED WITH 04P GS50 323012 Landing Gear Emergency Extrusion Ntrogen Now-clown Bottle (Right) -
Nitrogen Blenv-dorin Bonk (Right) - (INdrostatic) Functional
Test
(11ydrostabc) Functional Test
23.113
Completed 01P 6550 323911 Larding Gear EnteigenCy Catenate,'
COMPLIED WITH 04P G550 323911 Lancing Gear Emergency Extension (Hoedown Bottle • General MRsal Inspector
Bain:elm Beetle - General Visual Inspection
23.19
Completed CMP G550 335006 Ernergemy flocepath taring Battery
COMPLIED WITH 04P G550 335006 Emergency /towpath Lighting Battery Peck (Deep Cycle) No. 1 - Functional Test
Padc (Deep we) NO. 1 Functional Test (Brute)
(Duce)
23.20
Completed 04P Gm 335007 EmergeneY MOO(Parn 1•10 009 Battery
COMPLIED WITH CMP G550 335007 EmergenCYROWPMh DOWN Battery Pack (Deep WO NO. 2 • Functional Test
Pack (DmP Cycle) No. 2 -Functional Test (13nme)
(Bruce)
23.21
Completed CMP G550 335008 Emergency Horvath Lightng Battery
COMPLIED WITH 04P GSSO 335003 Errergascy Flocrpath Lighting Battery Pack (Deep 000 Na 3 - Functional Test
Pad( (Deep CYckg Ho. 3 Functional TeSt (Bruce)
(Ouse)
23.22
Completed 04P 6550 351013 Oxygen Mask! Regulator (Omens) •
COMPLIED WITH CMP 6550 351013 Oxygen Mask! Regulator (Observer) • Restore
Restore
23.23
Completed CMP GSSO 351112 Crew Oxygen Mask and ReputIct
COMPLIED WITH 04P GS50 351112 Crew Oxygen Mask and Regulate (Observer) - Detailed Inspection
(Posner) Detaled Inspector
23.24
Completed 04P 6550 351212 Passenger Oxygen Bottle (No. 2) -
COMPLIED WITH OW GSSO 351212 Passenger Oxygen Bottle (No. 2) (Ilydrostabc) Functional Test
(Hvdrostatx) Finch :nal Ted
23.25
Completed 04P 6550 353004 Portable Ongen Bade NO. 1 •
COMPLIED WITH PIP 6550 353004 Portable Oxygen Bottle Pin. I • Operatlonal Test
Operational Test
23.26
Completed CMP G5S0 521007 Men Cebn Door Locks - Inspection
COMPLIED MITI 04P 6550 521007 Stan Cabin Door Locks - Inspection
23.27
Completed CMP 6550 551109 Ibroontal StabiSzer Rub Blocks - General
COMPLIED WITH 04P GSSO 5511091brierreal Stailikeer Rub Blocks - Genera Maki Inspection
Visual Inspection
23.26
Completed 04P 6550 551110 Margate' RN/112er Rub BROS •
COMPLIED WITH OW G550 551110 Horizon al stataaer Rub Doha • Fused:nal Test
Fin:tonal Tat
23.29
Completed CMP GSSO 551111 Elevator Upper Swam- Deeded
COMPLIED WITH CMP GSSO 551111 Elevate Upper Surface - Deleted inspection
InSprittbn
23.30
Completed 04P 6550 783013 Thus Reverser Ground Relay (Left) -
COMPLIED WITH 04P 6550 783013 ThrUSt RM.'S., Ground ROW (Left) • Operational Test
Operational Test
23.31
Completed 04P 6550 783014 TNUP ReeerSer Ground Relay (Right) •
COMPLIED WITH CMP 6550 783014 Thus( Reverser Giourcl ROW (I0500 • Operaticnal Test
Operational Test
23.32
Waibng
amoral
CMP GSSO 920001 opereaben check package 12 month
chedt
23.33
Wailing
approval
"" RELATED CODES "'
Compiled will related cedes
0.1
23.34
Completed 04P 6550 262620 Fortatie Hobo Pre Extinguisher (Mt
COMPLIED WITH CMP G550 262620 Port ale Koko Fre Extinguisher (Aft Cabin) • Removal / Installation
Cabin) • Removal/ Installation
23.35
Completed CMP G550 335016 Emergency Flocepath Lighting Battery
COMPLIED WITH 04F 6550 335016 Emergency /towpath Lighting Battery Pack No. 1- Removal / Instalation
Pack Ho. 1 - Removal! Iretellabon
12013017 6:21:01 AM
Gulfstream Proprietary Inbonnation
Pate 23 of 210
EFTA00796584
Work Order:
5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawky PP
Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Stalin
Elhaepanof
RinokitIon
Pet OFF & ON: 2013-BR
St* OFF: 88662
SN ON: 012142
23.36
COm01Re0 09P G550 335017 En‘fgenCY ROOrpath Uctiting BatterY
COMPLIED WITH CMP G550 335017 Emerpercymocepath UstiOng Battery Pack NO. 2 • Removal 11'194140M
Pack No. 2 - Removal! Installabcn
23.37
Completed CMP G550 335018 Emergency flocepath Lighting Battery
COMPLIED WITH CMP GSS0 335018 Emergency Flocepath Lighting Battery Pads No. 3 - Reeved / Instalatan
Pack No. 3 Removal / Installation
P14 OFF &
2013-BR
St* OFF: 88660
St* Ott: 812143
23.38
Comokted 04P G550 235303 Oxygen mask Microchane (Observer) •
COMPLIED WITH CMP G550 235303 Oxygen Mask Microcevone (Observer) • OPeraPOnal TeSt
Operational Test
23.39
Completed CMP G550 351003 Oxygen Meek / Regulator (Costner) -
COMPLIED WITH CMP GSS0 351003 Oxygen Mask / Regulator (Observer) - Fut.:nal Test
FtrcUonal Test
23.40
Open
04P G550 351023 Crew Oxygen MaSk and Regulator Box
23.91
Open
(Observer) Removal/ Iretalaten
CMP G550 350001 Oxygen System Operabcnal Test
23.42
Completed CMP G550 351207 Passenger Oxygen Low•PleSSure Swtch •
COMPLIED WITH CMP G550 351207 PPSSenger Ors9an Low•Pressure %Rea OPerdtlOnal TER
Operational Test
23.93
Completed CMP GSSO 351222 Passenger Oxygen Cylrder (No. 2) -
COMPLIED WITH CMP GSS0 351222 Passenger Oxygen Cylnder (No. 2) - Removal/ Installation
Removal F Instalaticn
23.44
Open
CAP G550 352003 PAX Orr SYS (ALITONAN; CPS CK
MP
Discrepancies related to Miscellaneous CMP Tasks
(Exhibit 3) - (Ref. Item C 1.3 of Proposal 10.
7039702 R00)
24.1
Completed
24.2
Completed
24.3
Completed
R/H EVAS aft Kixr moult screw spins freely.
Ref 23.3
'rivet tad rtsciat.
stab I/El rgii leading edge
2 Bruce Bads saiArl cap check and require rePlarment.
Refer us terns 3).1 sy.1 33.1.
2S
Raplaoa all Main ara NOP OM • (Ret Item C IS ot
Proposal 1O$ 7039702 ROO)
25.1
In
Progress
25.1.1
Completed
Remo.r and ReclaCC all mon and nose landng gear tires.
Rernmed man wriee (4) and Muted t0 back PraP . Rel
items 11.58 Uru 11.61
it
CUSTOMER PROPERTY OUT TO VENDOR
26.1
26.2
263
26.9
Completed
Competed
Completed
Waiting
40(04
(1.1
SEND BLOW DOWN BOTTLE TO SUPPLIER FOR
HYDROSTATIC TEST AND RETURN TO AIRCRAFT
CUSTOMER PRCPERTY AC 5173
TN - N415L)1
REQUESTED RETURN DATE • 11/9
SEND 02 BOTTLE TO SUPPLIER TO COMPLY WITH
HYDROSTATIC TEST AND RETURN TO AIRCRAFT
CUSTOMER PROPERTY AC 5173
- N415LM
REQUESTED RETURN DATE - 11/11
SEND 02 MASK TO SIAPPUER FOR RIESTORE/RECIERMY
AND RETURN TO AIRCRAFT
CUSTOMER PROPERTY AC 5173 1N - N415119
REQUESTED RETURN DATE 11/24
COMPLY WITH DRAWING 11595857976 REV. A (KM
WEATHER)
MODIFY PANEL PER SWG 11595157976 REV A.
DRAWING ATTACHED
CUSTOMER PROPERTY AC 5173 IN - N415LM
REQUESTED RETURN DATE - 12/11
27
AIRCRAFT BATTERY (FR MA BATTERY I MAIN
SHIP BATTERY)
Competed
27.1 .1
Completed
27.1.2
Competed
27.1.3
Completed
THE a 1 (RAH) MAIN AIRCRAFT BATTERY DUE CAPACITY
CHECK / DEEP CYCLE.
REF: 21.7
Inbound InSpeCtiOn
Hidden Dermot
Compete FM fans 8130-3 or equivalent. Verify Repair
Upon further .mest.gation Nord P/H EVAS att upper manning screw to be Installed per recommended (swim° EVAS
107STC ORG Ph. 6064 Ret. E. Tighten nut as requred per ORG installation. No (other membrane required.
Replaced twee nutplateS on UBleiOng edge per pint log:sum rev AQ.
Ordered and seCleved New &We Batts.
Ref Items 23.35 end 23.37
secieved 810w Down Battle
Redeved 02 Bottle.
Redeved 02 Mask
PERFORMED CELL TO CASE LEAK CHEQC TORQUED UPPER HARDY/ARE. ( 113 IN. 185) COMPLIED WITH TIC
CAPACITY CHECK! DEEP CYCLE PROCEDURES. BATTERY PASSEDCAPACITY CHECK. STROPPED BATTERY OUT
OVERNIGHT (DEEP CYCLE). REMOVED SIICRTING SWAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES.
CHECKED WATER LEVEL.
SAFT CHM 24.3481 R/R•1 At/GI/ST 30. 1996
TORQUE WRENCH C/N 550298
CAL . DUE 09/2018
OHM CM 562947 a 562948 CAL. WE 04-Z018
inbound unperson envied non.
N/A
Issued appropriate fain and vs-ified certificate mother.
1205.2017 e11 Al AM
Gulfstream Proprietary Inhumation
Pape 2s of 210
EFTA00796585
Work Order:
5C521661 AC: 5173 STN: Charles Thomas SCC: Julian Brown Squawks: All
Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Status
Oiscespancv
Resoludon
Static., or kreign Authonty [edit:sten *enter.
27.1.4
Completed PERFORMED CELL TO CASE LEW CHECK TORQUED
UPPER HARDWARE (113 Inch lbs). COMPLIED WITH
CAPACTIY OIECX / DEEP CYCLE PROCEDURES. BATTERY
FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT
OVERSIGHT (DEEP CYCLE).
SAFT 04M 24-34-01
R/R-1 AUG 30/96
TORQUE WRENCH C/N 550293 DUE CAL 09/2018
ooei C/N 562947 DUE CAL 0412018
CMM C/N 562948 DUE CAL 04/2018
27.1.5
Completed REMOVED SKATING SWAPS. SERVICED BATTERY.
COMPLIED WITH THE 2ND CAPACITY 01E0(. BATTERY
PASSED YNDCAMOTY CHECK. STRAPPED BATTERY OUT
OVEItNIQO(DEFP CYCLE).
sAIT Emit 24.34-01 R/13.1 AUGUST 30, 1596
28
AVIATION BATTERY TYPE - CORE (PCS nit&
BATTERY B MAIN SNIP BATTERY)
28.1
Completed THE
2 MAIN AIRCRAFT BATTERY DUE CAPACITY CHECK / PERFORMED CELL TO CASE LEAX O4ECK. TORQUED UPPER HARDWARE. ( 113 IN. L85) COMPIJED WTTH THE
DEEP CYCLE.
CAPACITY 0180( 1 DEEP CYCE PROCEDURES. BATTERY PASSED CAPACITY CHECK. STRAPPED BATTERY OUT
OVERNIGHT (DEEP CYCLE). REMOVED SHORTING STRAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES.
REF: 21.8
CHECKED WATER LEVEL.
SAFT CMM 24.3481 R/R•I AUGUST 30. 1996
TORQUE WRENCH C/N 550298
CAL DUE 09/2018
OHM C/N 562947 & 562948 CAL. WE 042018
28.1.1
Completed Inbound Inspect=
Inbound Inspector. complied with.
28.1 .2
Completed mdden Damage
N/A
28.1.3
COMPkted Complete FM Tam 8130.3 or eoPealent. Verify Repair
!Med a0prOpra0e form and %verified <Mika° ',anger.
Stabcw or Fenian Authonty Certilkstion *ants.
28.1.4
Completed PERFORMED CELL TO CASE LUX CHECK TORQUED
UPPER HARDWARE (113 Inch lOs). COMPLIED WITH
CAPACTIY 01E0( / DEEP CYCLE PROCEDURES. BATTERY
FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT
OVERNIGHT (DEEP CYCLE).
SAFT 04M 24-34-01
R/R-1 AUG 30/96
TORQUE WRENCH C/N 550293 DUE CAL 0912018
OMIT C/N 562947 DUE CAL 0412018
CMM CAN 562948 DUE CAL 04/2018
28.1.5
Completed REMOVED SKIRTING SWAPS. SERVICED BATTERY.
COMPLIED WITH THE 2ND CAPACITY 01E0(. BATTERY
PASSED 2%0CAPACITY CHECK. SWAPPED BATTERY OUT
OVERNIGHT(DEEP CYCLE).
SAFT 0114 24.34-01 R/R.L AUGUST 30, 1996
29
PAIRING ASSY, BULLET, PWD
29.1
Ccrrpkted FwD BULLET FAIRING (KNEE PANEL) HAS EVIDENCE CF
Repaired satcom raOome. Reference: Enfneedng also In step 29.2.1.1 Ord B>9 1159CSH52024
1/17/06
EROSIOII AT FWD EDGE AROUND FV/D EDGE AROUND
Ergineerirg Osp05 in steps 29.3.8 plat 29.3.10.
FY/0 LOOKING CAMERA AND A PUNCTURE INSIDE CS
FAIRING. AREAS MAILED WIN BLUE GREASE PENCIL
FWD BULLET FAIRING
Part; ->1155C5H52024-405
IRAN PAD RETURN TO AIRCRAFT
Sere .>N/A
Final finish nil apply at Parvire cue,.
CUSTOMER PROPERTY AC 5173 TN - N4ISLM
REQUESTED RETURN DATE • 11117
29.1.1
Completed !nearing Inspecten
Complied with Incoming Inspect:an.
Part, ->1159C9452024-405
Sera ->N/A
Mass/Mance Status
>N/A
Foreign Authaity Status —>N/A
29.1 .2
Completed Tearciorm
N/A
29.1 .3
Completed Inspection
Performed Usual nspecoon of sworn. reference B/P 1159C9152024 Rev. D Released 1/17/06.
29.1.4
Completed Rework
Repaired satcom radome. Reference: Engneeing dace in step 29.2.1.1 and BAs 1159051152024
1/17/06
Engneenng dspos in steps 21.3.8 and 29.3.10.
29.1 .5
Complete0
ASSErnMy
N/A
29.1 .6
Complete0 Test
N/A
29.1.7
Completed Refir,sh
Refinished as required. See steps beau.
29.1.7.1
Completed Made 14,Iar
Made mykr for sate= for dnisco of gray aM white ccias (had no seen sealer separating cans)
29.1 7.2
Completed Apply 10P2.3 antistatic coating
Prepped and sdvert washed. ReCGAMPS4122 Rev.B (06/29/17)
appied 10P2.3 ana-stasc coating to repair areas only, batch a (8476182W2/8476154019)Rer:CAMPS3113 Rev.8
(10/17114), Expres 04/18
Mb-stabc test-N/A, (area to small to perform anti-static resistance died0
29.1.7.3
Completed sup-sand and prime with 3012 / D-8CO3 HI•Eksld ARP/
>Strip-SanSed old finish. Ref. GAMPSI000 Rev:GX04/13/17).
1092-3 Anti-Stabc,Re-pnme with 3012.
>Malted for 3012 primer. Rd. B/P 1159CSH52024 Rev.V(01/17/06).
>Apoled 3012 prrner. Rd. GAMPS3116 Rev:C(05/18/16).
Br 115104/115105. Exp. Date 0431/2018
>Fooled D4003
Ref.GAMP53103 Rev.D109/17ton.
D-8003 Base Bata* TE3887UF Exp. Date 05/31/2020.
D-9001 Converter Bata* TC2224UF Exp.Date 03/3112019.
>Sanded D8003 smooth. Ref. GAMPS4000 Rev.'G(O4/13/17).
>Rooted 10P2-3 MU•SUtic al tner.Ref. GAMES3113 Rev.'B(1O/07/14).
lon.3 Mb-State base Batdvt 84770320S8ExpiNste 03/30/2018.
1.115,2017
4;21:0, AM
Gulfstream Proprietary Information
het 24,429
EFTA00796586
Work Order:
SC521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown Squawks:
Yeiblu = Newly Added Rens Green = Changed Items (Ready for inspection or completed) from previous day (or slice Friday on Mondays)
Assoc
Stalin I
Discrepancy
EC-110 Owing Solution Bath* 8477032055 Es p. Date 03130/20/8 (See step 29.1.7.4 for test)
>Re-Prkned with 3012. Ref. GAMPS3116 Revr(05/18/16).
Batelle 115100/115105. Op. Date04/31/2018.
29.1.7.0
Competed POPE 10P2.3 MU-State, Perram rEStievIty test.
>noosed 1%2.3 Prellatk. Ref. GA1,53303 Rev.W(03/18/09).
>Performed resistivity diack.All readings ,we acceptabk.
Meter* 563023
Wert Date 05/18.
29.1.8
Completed Oulgerg Imagery
Compiled with Ortgong Imagery requirements fart will return to service center.
29.2
Completed Erosion along the leadng edge and dherter strips.
Repaired erosion along the leading edge end replaced all overt strips. Reference: Engineering dspo in step 29.2.1.1
and Bole 1159CS-I52074 Rev. D.I.f17/06
29.2.1
Completed Request engineering evaluation for repair of erosion.
SEE ENGINEERING DISPO STEP 29.2.1.1
29.2.1.1
Completed Engineerro dsposten:
MRS E391
Remove lartring dverter end breast ea mond. Said
eroded areas SmtOth.
With covarrence from T. Sutherland, Daiwa
Scuff sand minimum 1.50in sound seas to be repaired,
reinceing allglossy surfaces, to prepse For wet layup.
Fabricate two pies using dies of 161/181COle dv fiberglass
cloth. Sue plies to ensure coverage of eroded and sanded
region. Ply al *mold extend at least 1.03n teysd the
reworked area and Ply #2 Snead edend at least .50In
beyond Ply PI, except pries may end at edge of part where
arsecalate.
Saturate Plies! and 2 tee, 9104Epon 828/DTA Or HySial
EA.956A/8 mixed per manufacture's insbudism. lay to
rework and with Ply t I and Ply *2 ensuring adequate
overlap as toedlien above.
Cure plies under vacuum tog a 75-9,F for at least 12
hairs, or under vacuum bag at 7S-9PP for a 2-3 houn
Mowed by 3 NYS at 130-140'F.
Remove vacuum bag ard said smooth. Visudly inspect
reworked area; if reputed, fill and far using land EA960F
and sand to contour.
If required, imtdl belting dhorter as desabed babe,.
Touch tp was pruner and paint to match customer tOPCOat.
as required.
Lightning {limner
.
instaltation:
Prepare surface to be bonded Per GAWPS 8210: scuff Sand
Men solvent woe web MK or aortore fellorectl by IsoPoPTI
alcohol.
Apply GMIOOBDI0 Or GAA1008D03 Weser° and posi00n
ovens per 1159CS1r52024. Cure under vacuum bag for
days at room temperature, or 2.3 hays at room
temperature motored by 2 hours at 130-140'F.
29.22
Oxrpeted REMOVED PAINT/PRIMER Real DISCREPANT FV/D MEM
EFON 828
AND SOLVENT CLEANED. THEN FABRICATED MO
BATCH* DP7C1613/1737GG Om 3f31/18
INSTALLED 2 PLIES OF STYLE 181 FIBERGLASS WET USING DTA
EPON 8281DTA VACUUM BAGGED AND CURED. PEE
LOTS /78530026
W
2/16/18
ENGDNEERING DISPO STEP 29.2.1.1
29.2-3
Coiredered Removed and replaceda don stma(PM
PR1436-G BATCM*1043011 0717 SIP:10 APR 2016.
LSSQW00-0460). Reference: 8/P 1159all52024 Rev. 0
Released 1/17/06.
29.3
Canpreted Rinehart on Ullirner steam
Repaired puncture on UH inner steface.
Reference: Engineering dispas in steps 29.38 and 29.3.10.
29.3.1
Ccmpleted Request engineering evaluation for reper of inner gin
See step 29.3.3 for engineering deposition.
Pundure.
29.32
Completed Request NOT to oaken tap test of inner sten puncture.
NDT pa-formed tap test nspectico on inner skin puncture
per GC RDTP 2.1
No distend feted outside Me puncture area visibly seen/noted
See files tab for pit and location of puncture
29.33
Ccmpleted Preliminary Err :erne Capasiten: Refer to pie n the
lies" tab for mewed location d contact area. Place a soft
eanCreSSible material (day. reporubber, etc -1 mat will
mum ICKatien and Merlin t pis is the contact area.
Install fwd bullet hums sal attach with EtO had.vare.
Remove fairing and take pia a suspect contact area.
Resubmit pia via COM*, tO engineering for evaluation.
MR8 NO. E064
29.3.4
Completed Per amnionsy engineerng dspostion placed a sat
compressible material (repro-rubber) an the contact area.
Installed fad tulet laming and math Aim B/P hardware.
Rummel fairing and took pics of suspect contact aie).
Resubmitted pia to engineering.
29.3 .5
Completed Preliminary &sneering Cisoosition: Refer to plc in the'
ales- tat dell a l43. 30 at tne location shown. Take a
measurement from the Inner surface of outer son to the
cuter surface of inner skn. Rewtont results to ergneering
for Final disposition. MRS No. E064
29.35
Completed Resubmit engneenng alter measurement from tee Inner
See step 29.3.7 Ice engineering disco.
surface of outer Edo to the otter surface of inner sbn
I2JI
6:2I:01AM
Gulfstream Proprietary Information
Pea i
.to
EFTA00796587
Work Order:
SCS21661 AC: 5173 STM: Chart Thomas SCC: Julian Brown &mewls: AP
Yellow = Newly Added Items. Green = Changed Items (Ready for inspedion or completed) from previous day (or since Friday on Mondays)
j Dawn i Maths
29.3.7
Coritisted
29.3.8
Coapkted
29.3.9
COMOSeted
29.3 10
COmpleted
Diserepancy
is .210"
Preliminary Engineenso Ospasibo-c Refer to attachment in
me "Riles" tan: uslro the smallest clean updiameter,
represented by me red dash line. Van out the discrepant
secten of inner OM and associated =ft clown to the bond
surface of outer skin. Do not undo:reit the outer dun or
Incorporate core ramp at me time. measure, Oxument.
and festival resulting dean to Ole. MRS (064
Final Engineering Deposition: Rework per Steps 1 Oyu 13.
NOTE Steps 9 lieu 13 are Fr, 29.3.9. Cutout of the inner
gun and cue removal 5 accotable. ProCeed win feif Ming
rework:
1. Refer to 'Ttles' Pcwerpoint attadunent Section AMA
29.3.7. Incorporate core ramp that startS *OM edge of
cutout extencing 25 t0 35 .nches Word cutout. At me
lower CCP it is acceptable for the denier to extend onto
the sold laminate.
2. Straighten out Wiled Over COM oils and rernOve 10060
COS. Vacuum Out dtrIS
3. Pot core ramp with Magnctond 68-3. Cured 70 to 95F
unit eating Ass a harden surface.
DO not touch sanded c.uraces with bare hands wear dean
cotton glaRes.
1. Sohrent dean using hen cheesecloth vipers wet with
HEX cc Isopeopil Alcor°, an e- ea cuendng at least IS
Inches beyond Cutart or to EOP. adacnever Is COW.
Contnue until wipers reman dean. Do not use synthetic Or
shop towel caper rnsterkis. Also solvent dam a
corresponIng a ea On outer stin.
5, Sand off excess potting. Sand Inner tong strface to
remove are stubble and any glassy suface finely also
=bend sandng aroerd din alert ors an area extending
Iron lower EOP or at least 2.0 rches beycod edge cr cutout
to expose me outer fiberglass (F/G) pat. Vacuum out
debris. Traces ci pent. Primer, etc. remaining within the
FIG weave shall be erceptable.
6. Sand Correspond Outer skin surface In tne sang way.
7. On inner skin add two piles of dry Stile 181 (FM).
Odertabcn of bath pies is °phenol. It acs acceptable to dot
F/G to afar workeg cut winkles. Stagger darts so they do
DX overlap onto each other. Saturated pries wain Eon
8281 DTA Or EA956 Aft3. Refer to SRM 51.34.60 Table I
and SRM 51078.10 Repel' Technique 7.
B. Refers Files tab in 293.7. Ply 1 :Nil crreslap .50 to .80
Inds caste the lore surface. Ply 2 gal overlap PH I by .50
to .80 Inches.
Ospasibcn continues in 293.9
MRB No. (061
Final Engineering D6POStien Continued from 29.3.8,
9. On outer surface edd like dies centered met cutout.
10, Distal a breather Pact 000 ‘rd(uum 049, rerer t0
Sel451-78-10 Repair Rehrictie 8. Perform a vacuum leak
chedc by piling fUl vacuum Orin 21 inches of Hg) until bag
is pulled tight. Disconnect varnarn saute andverify max
leakage rate ODes not mewl 5 Indies Of Hg Winn 5
mnutes.
II. are at 70 to 95F until adhesive gdsvAik.ls should take
at had 4 hours.
12. A/ter cure remove bag and sand off excess agnethe
and F/G. Tap test outer and Inner gal within repair area 10
very no voidsand /or &bands edit. Aso visually verify
no ply separations exist.
13. On outer striateapply Frnish 3012 (CAMPS 3116)
(donee by anti-static paint and customer topcoat Ensure
appled anb.static pant overlaps onto the existing anti-state
part On ruler surface no finish S reputed triers dry
surfaces edst and II so apply Finish 3012 to entire repawed
Surface.
This is a minor repair. MRS No. E060
Made <cavern? and potted core web Inagnobond 68.3.
Cured at 70 ton until potting has a harden surface.
Solvent clamed, carded cif ewes potting. Sat freer
to-el surface and extend sanded around skin cutout crier an
area. On inner and Wet Pun added two plies a cirY Ayle
181 (F/G). Saturated Dies with (pen 828 / DTA.
Install vacuum bag, perfumed a vacuum halt check and
cured at 70 to 95F. Me, cured remove bag and sand off
excess adneshe anti F/G. Tap tested outer and Inner stin
wire, repay area to vented no vokls and for Ostenth
edit. Also visually verified no ply operatians exist.
Work reference:Engineering disco in steps 29.38 and
29.3.10.
30
Addition of a SHADE MASTER at the Right•Hand a2
VIP Seat - (Ref. Item 8 1.1 of Proposal 10e703856S
ROO )
30.1
Open
Adeliaon or a SHADE MASTER at the Rgnt.itirtl P2 VIP
Seat
The existing rigtt-hand *2 forward VIP meth panel will be
removed and a new panel Math SHADE MASTER runctionarny
Installed. FeitOsling panel replacement, tne Ca0n
Management System (04$) software wit be updated and a
ReookidOn
DISpOSIOOn 013rdnated wtht White (Stress). Repair Is acceptable. Reference 11579.
EPON 828: MFG batch0:0P7C1613 UP: 31 MAR 2018
0Tk MFG MON: 550 EW:02/16/2018
1205,2017 0:21:GIAM
Gulfs:beam Proprietary ItiormatiOn
Par 26ot:9
EFTA00796588
Work Order:
5C521661 AC: 5173 STM: Charles Thomas SCC: Julen Brown Squat Ali
Yellow = Newly Added Items Green = Changed Rem (Ready for inspection or completed) from previous day (or slice Friday on Mondays)
Assoc
Stains
30.1.1
In
Progress
30.1 .2
open
30.1.3
Open
30.1.4
Open
30.1.5
open
31
31.1
Completed
31.1.1
Completed
31.1 .2
Completed
31.1.3
Completed
31.1.4
Completed
33
32.1
COminete0
32.1.1
Completed
32.1 .2
Completed
32.1 .3
Completed
32.1.4
Completed
32.2
Completed
33
33.1
Completed
33.1.1
Completed
33.1 .2
Completed
33.1 .3
Completed
33.1.4
Completed
Dkvalpanof
system operational died( pertained.
New Components:
One (1)4Typa Switch Panel 2 x II - ROCA:well COMM
Moaned Components:
Cabin Management System Software - Rodoyell Conn,
Certification: This modficaticre veil be approved as a rnapr
alteration, and documented on an FM 337.
Notes:
The remand panel wil be returned to the creamer for use
as a spare at the aft VIP seat location.
System repairs are not Included and if required wrotkl be
addressed on a tine aid material bags.
Muna Engineering Later Re urb
Custom Engineering Cert tabor Retort,
AVI Systems Test Labor Crily
AN fElectncal Labor ClrOy
Inspection Labor Criy
SATIMY, EMERIMICY
Cornell, with
y Floorpath lighting Battery Fade
(Deep Cycle) No. 1 - Function Test
Ref: 23.19
Inbound Inspection
Hidden Damage
Complete FM fans 8130-3 or equivalent. Verify Repair
Stabco or ration Authonty Certification banter.
Inspected unit. Performed Deep Cycle/Cap Oncit
accordance WIN BRUCE CHM 33.21-70 Rev (5) dated May
IC 2036. Krimurn required ctscharge time a 15:00. int
FALLS to meet maintenance spec with dadarge tine of
7:57. Ra0ed art on 16 hour slow charge. Sexed copeck),
test to be conducted II/10/17.
563440420:8
CN
BATTERY, EMERGENCY LIGHTS
Comply s•IM Emergency Haan:earn Ughtrg Battery Path
(Deep Cycle) No. 2 - Fond:coal Test
Ref: 23.20
Inbound Impact=
HOC% Damage
Convict° FM ionn 8130-3 or %%Patent. Witty Repair
Staten or ration Authonty Certification Hinter.
Inspected unit. Perfomied Deep 0,de/Cap =beds in
ateordaree wiM BRUCE CHM 33.21.70 Rev (5) dated May
16, 2036. NO faults found. harimum required discharge
tine is 15:00. Unit oasts maintenance specs wandischarge
tine of 18:22. Slated unit an 16 hour Om charge.
CM 5634404/2018
•••VOID•••O4P G550 324033 Mon Tire Assembly (Left
Inboard) Inspection
SATIERY, EMERGENCY LIGHTS
Corry with Erntrgcncr noorpslh Lsrtng Battery Pei
(Deep Cycle) No. 3 functional Tex
Ref: 23.21
Inbound Inspacten
Hidden Damage
Complete FM form 8130-3 or equNalent. Verify Repair
Stnocn or Foreign Authonty Certification banter.
Inspected unit. Performed Deep 0,tle/Cap Ole& in
accordance with BRUCE CINM 33.21-70 Rev (5) dated May
16, 2036. Marcum required Ostharge Ome is 15:00. Lint
FAGS to meet maintenance spec with dadarge tine of
7:54. Hated ant on 16 hem slow charge. Second capaoly
test to Oeoaductea 11/10/17.
cal 5614404/2018
34
MAIN WHEEL ASSEMBLY
34.1
Completed RaITE TO BACK 940P FOR TIRE 0W4GE, BEAD SEAT
AND NOT. INSPECT BEARING AND PACK
CUSTOMER PROPERTY AC 5173 1N - N4151.M
REQUESTED RETURN DATE 12/4
Remiudon
Performed visual inspection. Seep and Performed second capaoty °Ned'. Unit FAILED opacity check withdischarge
brie of 5:42. Unit DOES NOT meet marterence specs LAW: Bruce 33-21-70 MAINT MANUAL, REV S, DATED
5/16/2006. Reeternmend Scrapping or to Return to Vendor.
CN 563440 4/2018
Inbound InspecOon compiied with.
N/A
No 8130-3 or equvalent wit be issued.
insprsTed unit. Patterned Deeo CycleiCap Deck m accordance with BRUCE CNN 33-21.70 Rev (5) dated May 16,
2005. No faults found. Minirrun roweddischarge time is 15:00. Unt meets maintenance specs with discharge time
of 18:22.
CN 5634404/2018
Inbound Inure:ten complied with.
N/A
Hand appropriate loan and rained <stoical° nattier.
•••VDID•••DLplate of 11.69
Performed visual nit:attn. Sean and Performed send capacity diedc Unit FAILED capacity deck with discharge
brie of 9:57. Unit DOES NOT not mantensce specs LAW: Bruce 33-21-70 MANI ItahUAL, REV S, DATED
5/16/2006. Remnant' Scrapping or to Return to venoce.
CN 563440 4/2018
Inbound Inspection complied with.
N/A
Ito 8130-3 a eotivaient wit be issued
REPAIRED! NOT MAIN WHEEL/TIRE ASSEMBLY REF. DunlOp 01414 32-44-02, REY.14, Ca. 28, 2016, TR 3V13 DTD
11/03/17, SAM 3249-99 REV. 3 DTD. 04/28/2015, AND &P 115906003 REV.
DTD. 2/202039.
P/N 11591.56001-9
5/N 5159FX
TSN WA
150 WA
CSN WA
co Na.
MOUNTED NEW TIRE P/N 1159SCIS06-1(390K02-1) SM 72015604 ON YMEEL NUB ASSY. PM 1159503034 S/N
12/1502017
6:21:O1AM
Cul/stream Proprietary Information
Part 276126
EFTA00796589
Work Order:
SC521661 AC: 5173 STM: Charles Thomas BCC: Julian Brown Squawkin au
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays)
Assoc
Stalin
34.1.1
Completed
34.1.2
Completed
34.1 .3
Completed
34.1.4
Completed
34.1.5
Como/Bed
34.1.6
Completed
34.1.7
Completed
34.1.8
Completed
34.2
Completed
35
35.1
Completed
35.1.1
Completed
35.12
ComoNted
35.1.3
Completed
35.1.4
COM /KW
35.1.5
Completed
35.1.6
ComoNted
35,1.7
CenDIKW
35.1.8
Completed
35.2
Completed
36
36.1
Competed
36.1.1
Comokted
36.1.2
Completed
Micrqsanoir
INCOMING INSPECTION
7DACOWN
BISECTION
NOT
ASSEMBLY
TEST
CLEM/. INSPECT, PACK AND 'ASTMS BEARINGS
DEFLATE FOR SHIPPING AND STORAGE
REMOVE OLD TIRE S/N 52243136 AND MOUNT HEW TIRE.
MAIN WHEEL ASSEMBLY
ROUTE TO RACK SHOP FOR TIRE CHAN(E, BEAD SEAT
AND NOT. INSPECT BEARING AND PACK
CUSTOMER PROPERTY AC 5173 TN • 3/915111
REQUESTED RETURN DATE 12/4
INCOMING INSPECTION
MAROON N
INSPECTION
MDT
ASSEMBLY
TEST
CLEM, INSPECT. PACK MID INSTALL BEARINGS
DEFLATE FOR SHIPPING MO STORAGE
REMOVE OLD TIRE S/N 60293134 AND MOUNT NEW TIRE.
MAIN WHIM. ASSEMBLY
ROUTE TO BACK SHOP FOR TIRE CHANGE, BEAD SEAT
AND NOT. INSPECT BEARING MD PACK
CUSTOMER PRCPERTY AC 5173 TN - N415/14
REQUESTED RETURN DATE 12/4
INCOMING INSPECTION
TEARCOWN
Resolution
SI 59Px.
TOTE TO INSTALLER • THIS ASSEMBLY ONLY CONTAINS A STORAGE NITROGEN PRESSURE OF 90 PSI. UPON
ITISTALLAIlON OF THISASSEMBLY ENSURE THAT IT IS PROPERLY SERVICED PER THE APPLICABLE AIRCRAFT
MAINTENANCE MANUAL
Complied with looming Smothen; MAIN VERDI AND TIRE ASSY.
Parte
a 1159L56003-9
Serials >
..
5159FX
Tea-Conn Complied with ref. Dollop CMM 324442, REV.14, OCT. 20, 2016, TR 32-13 DID 11/03/17. TIRE CHANGE
AND BEAD SEAT NOT ONLY.
Conned with Tel. Dulloo CMM 32.44.42, REV.14, OCT. 28, 2016, IR 32.13 DTD 11/03/17.
NDT performed Eddy Current Inspection cn BEAD SEAT Per CAC hOTP 3.0 Rey.]
No Credo Noted.
EQUOMent UH/O: NO N SODS 561194 Cal Due 12/17, ECM SW. 560706
Assembled N4. Duritip CMM 324442, REV.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17.
Complied with re. Combo CMM 3244-42, REV.14, OCT. 29.2016• TR 32-13 DID 11/133/17. N3 LENS NOTED.
VERIFIED USING HAND 1ELD GAUGE 565789 CALIBRATION DUE DATE 02/2018.
ON TEST 9:00AM ON
12/2/2017
OFF TEST 9.30AM
ON 12)3/2017
Complied with ref. Dunlop CMM 3244-42, REV.14, OCT. yty. X116• TR 32-13 DID 11/03/17. SEE STEPS BELOW
OERSTED FOR SHIPPINGAND STORAGE
MOUNTED NEW TIRE
P/N 115950306.1, (350(02.1) SA 72015604
ON MAIN WHEEL
P/N 11599:L503-9 SAP 51551FX
Complied with ref. Eltetp CMM 3244-42, REV.14, OCT. a
2016, TR 32-13 DID 11/133/17.
REPAIRED! NDT MANN WHEEL/TIRE ASSEMBLY REF. Dump OM 324442, REV.14, OCT. 28, 2016,18 32-13 DTI)
1I/03/17, SPM 3249-99 REV. 3 DTD. 09/211/2015, AND 8/P 11592/56003 REV. m." DID. 2/26/2039.
P/N 11591.56003.7
5/N 5167FP
TSN WA
T50 N/A
0N WA
00 WA
MOUNTED NEW TIRE P/N 115950.506-1(350K02-1) S/N 7201559B ON WHEEL MN ASSY. P/N 1159SO-503.7 SIN
5167W.
NOTE TO INSTALLER - THIS ASSEMBLY OILY 03NTAINS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON
INSTALLATION OF THISASSEMBLY cresE THAT IT IS PROPERLY SERVICEDPER THE APPLICABLE AIRCRAFT
MAINTENANCE MANUAL.
Complied with Incoming Inspectran; MAIN WHEEL NO TIRE ASSY.
Pan*------>I1S9LS6003-7
Serial;
a 5167W
TeaNkrAm Complied with rel. Onto 04/4 32.44-42, REV.14, OCT. 28, 2016. TR 3213 DID 11/03/17. TIRE CHWIGE
AND BEAD SEAT NOT ONLY.
Complied with ref. Dunlop CMM 3244-42, REV.I4, OCT. 28, 2016, TR 32-13 DID 11/133/17.
NOT performed Eddy Current inspecuon an BEAD SEAT per GAG NDTP 3.0 Rev.?
NO Dade Noted.
0:Bement Used: Nolte 5005 561194 CS Due 12/17, ECM SW. 560706
Assembled ref. Dunlop CMM 32-99-92, REV.I.4, OCT. 22, 2016,1R 32-13 DID 11/03/17.
Complied with re. 00,100 CMM 324442. REVS., OCT. 28, 2016, TR 32.13 DTD 11/03/17. AO LEAKS NOTED.
VERIFIED USING HAND HEW GAUGE 565789 CALIBRATION DUE DATE 02/2018.
ON TEST 9:00AM ON
12/2/2017
OFF TEST 9:30AM
ON 12/3/2017
Conned with rel. Dumloo CMM 32-44-42, REV.14, OCT. 28, 2016, IR 32.13 DTD 11/03/17. SEE STEPS BELOW
OERSTED FOR SHIPPING MO STORAGE
MOUNTED NEW TIRE
P/N 115950306.1, (350012.1) SIN 72015598
ON MAIN WHEEL
P/N 1159SCL503-7 S/N 5167W
Complied with rel. Onto CMM 3244-42, REV.14, OCT. 28, 2016,18 32.13 DTD 11/03/17.
REPAIRED / NDT MAIN WHEEL/TIRE ASSEMBLY REF. Doric, OM 32-99-92, REV.14, OCT. 28, 2016, TR 32-13 DTD
11/03/17. SPM 324949 REV. 3 DM. 04/2B/2015. AND 8/P /159156003 REV. *.' DTD. 2/26/009.
P/N 1159L56003-9
S/N 5175GC
TSN WA
ISO WA
ON N/A
C93 N/A
MOUNTED NEW TIRE P/N 115950.506.1(350K02-1) 5/N 71665589 ON WHEEL BRA ASSY. PM 11556CL5031 SON
517SGC.
NOTE TO INSTALLER • THIS ASSEMBLY014Y CONTAINS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON
INSTALLATION OF THIS ASSEMBLY ENSURE THAT IT IS PROPERLY SERVICED PER THE APPLICABLE AIRCRAFT
MAINTENANCE MANUAL
Compiled with Warring Inspeda3n; MAIN WHEEL Alt TIRE ASSY.
Perte••-•••>1159L56003-9
Seriele--> 517SGC
Teardown Complied with ref. Coto 0414 324442, REV.14, OCT. a
2016, TR 32-13 DID 11/03/17. TIRE CHANGE
MID BEAD SEAT NOT ONLY.
12/11.2017 6:21:01AM
Gulfstreorn Proprietary Infonaation
Par nets
EFTA00796590
Work Order:
5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian &Own &wads ail
Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from pevious day (or since Friday on Mondays)
Ian
Shan I
36.13
Cempleted
36.1.1
Completed
36.13
Completed
36.1.6
Completed
36.1.7
Comoh:ted
36.1A
Comoh:ted
36.2
Completed
37
37.1
Carolded
37.1.1
Completed
37.1.2
Completed
37.1.3
Comoeted
37.1.4
Complied
37.1.5
Comoeted
37.1.6
Completed
37.1.7
Completed
37.1.8
Completed
37.2
Comoeted
Discrepancy
INSPECTION
NOT
ASSEMBLY
TEST
CLEAN, INSPECT. PACK AND INSTALL BEARINGS
DEFLATE FCR SHIPPING AND STORAGE
REMOVE OLD TIRE SfN 52543193 AND MOUNT NEW TIRE.
MAIN WHEEL ASSEMBLY
ROJTE TO SECA Su:bi-:* TRC CMANCS.
AND NOT. INSPECT BEARING AND PACK
BEAD SEAT
REPAIRED f NDT MAIN
11/)3/17, SPM 32-4949
P/N 1159L56003-7
CUSTOMER PROPERTY AC 5173 III 7/4151M
5/N 5188FP
TSN WA
ISO N/A
REQUESTED RETURN DATE 12/4
GSA WA
CSO WA
MOUNTED NEW TIRE P/N
5188FP.
NOTE TO INSTALLER • THIS
INSTALLATION OF THIS
MARGENANCE MANUAL
ateedudon
Camp0ed with M. Dist* CNN 32-44-42, PEVA% OCT. 28, 2016, TR 32-13 DID 11/03117.
NOT performed Eddy Current Inspection on BEAD SEAT pa GAC NOIR 3.0 Rey.]
110 OROS Wed.
Ecuoment
MACS 5005 561194 Cal Due 12/17, ECM SW. 560706
Assembled ref. Durlep 0461 324942, REV.14, OCT. 28, 2016, TR 32-13 DTD 11/03/17.
Complied with ref. Domlop CMM 32-44-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03117. It LEAPS NOTED.
VERIFIED USING HMO HELD GAUGE 565789 CALIBRATICM DUE DATE 02/2018.
ON TEST 9:00AM ON
1V7/2017
OFF TEST 9.30AM
ON 12/3/2017
Complied with itt. MAW CMM 32-44-42 REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17. SEE STEPS BELOW
DEBUTED FCR SHIPPING MO STORAGE
MOUNTED NEW TIRE
P/N 115950.506-1, (3501(02-1) SIN 71865589
ON MAIN WHEEL
P/N 1159SCL503-9 S/N 517SGC
comcom nen mi. Da to CMM 3244-42, REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17.
INCOMING INSPECTION
TEARCOWN
INSPECTION
NOT
ASSEMBLY
TEST
CLEM. INSPECT, PACK AND INSTALL BEARINGS
DEFLATE FCR SHIPPING AND STORAGE
REMOVE OLD TIRE S/N 60323055 AND MOUNT NEW TIRE
WHEEIJ1IRE ASSEMBLY REF. Dunlop OW 32-99-92, REV.14, OCT. 28, 2016,1R 32-13 DTD
REV. 3 DTD. 09/28/2015, MO B/P 11591.56003 REV.
DTD. 2/26/2039.
11595CL506-1(350K02-1) 5/N 71925582 ON WHEEL HUB ASSY. P/N 11595CL503.7 SM
ASSEMBLY ONLY 03NTABIS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON
ASSEMBLY ENSURE DIRT IT 15 PRCRERLY SERVICED PER THE AMICABLE AIRCRAFT
Complied wiles Incoming Inspecban; MAIN WHEEL MO TIRE ASSY.
Pane
1159L56003-7
Serials a
..
51e8FP
TerdoAn Complied with ref. Otrdcp OM 3244-42, REV.14, OUT. 28, 2016, TR 32-13 DID 11/03/17. TIRE OUNCE
AND BEAD SEAT NDT ONLY.
OXMAN with rel. WINO CMM 324442, REV.14, OCT. 28, 2016,1R 32.13 DID 11/03/17.
NOT mrformed Eddy Current Ineped1On 0m BEAD SEAT per GAC NDTP 3.0 Rev.7
No Gees Meted.
Ecitgrnet Used: Nortee 5005 561194 Cal Due 12/17, EON Std. 560706
AMMONS ref. Dunlop, 004 324942 REV.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17.
Candied with ref. Dtnbp CMM 3244-42, REV.11, OCT.* 2016, TR 32-13 DID 11/03/17. It !EARS NOTED.
VERIFIED USING HAND ISO GAUGE 565789 CALIBRATICM DUE DATE 02/2018.
ON TEST 9:00N9 ON
12/2/2017
OFF TEST 9.30AM
CM 12/3/2017
Complied will, ref. Dollop CMM 3244-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03/17. SEE STEPS BELOW
DEMATED FOR SHIPPINGMO STORAGE
MOUNTED NEV/ TIRE
P/N 115960506.1, (35D(02.I) 5/N 71925582
ON MAIN WHEEL
P/N 115950366-7 WV 5181PP
Complied with ref. Dunlop CMM 32-44-42, REV.14, OCT. 22, 2016, TR 32-13 DID 11/03117.
12/13)7017 6:21:01AM
Gulfstream Proprietary Information
Posy 290129
EFTA00796591
Technical Artifacts (140)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Flight #
AC120Flight #
AC43Flight #
AC5173Flight #
AF7Flight #
LH680Phone
1 4290267Phone
12013017Phone
1205.2017Phone
12102011Phone
12152017Phone
14304001359Phone
14304001381Phone
14304001382Phone
14304001405Phone
14304001407Phone
14304001408Phone
15050250Phone
15906003Phone
15950306Phone
15950366Phone
15960506Phone
15965201741Phone
16706101Phone
2243136Phone
2543193Phone
281-1425Phone
3000090Phone
3000091Phone
3000092Phone
3000093Phone
3001004Phone
3001084Phone
3001139Phone
3030053Phone
3112019Phone
3440420Phone
4001349Phone
4001351Phone
4001379Phone
4001380Phone
4001381Phone
4001382Phone
4001383Phone
4001405Phone
4001407Phone
4001408Phone
4001409Phone
4001492Phone
4001496Phone
4030069Phone
4290002Phone
4304001351Phone
4304001379Phone
4304001383Phone
4352014Phone
4468001411Phone
4804024006Phone
4805001267Phone
4806002351Phone
506238.2022Phone
5157976Phone
5300301Phone
550 2563Phone
550 2733Phone
550-2009Phone
5524220Phone
5541985Phone
5547985Phone
5557976Phone
5557977Phone
5582318Phone
5614404Phone
5634404Phone
5847985Phone
5847986Phone
5857010Phone
5857083Phone
5857976Phone
6030509Phone
7021852Phone
7028140Phone
7031235Phone
7031236Phone
7037336Phone
7037536Phone
7038248Phone
7039407Phone
7039702Phone
7092716Phone
7100111Phone
7700395Phone
8000312Phone
8001411Phone
8001549Phone
8001557Phone
8007001Phone
8031549Phone
8031557Phone
8040001Phone
8080720Phone
8476154019Phone
8477032055Phone
8528041000Phone
8530026Phone
9000032Phone
9000037Phone
9001791Phone
9055420Phone
912-965-4178Phone
9125363Phone
9152024Phone
9156003Phone
9352095Phone
9452024Phone
9503034Phone
9584790525Phone
9584795Phone
9651110Phone
9652017Phone
9851019Phone
9851110Phone
9851419Phone
9852017SWIFT/BIC
COMPLIEDSWIFT/BIC
ENSURINGTail #
N415Tail #
N4151Tail #
N415LTail #
N415LMWire Ref
REFERENCEWire Ref
Ref 506238Wire Ref
ReferenceWire Ref
RefinishedWire Ref
WIRE HARNESSWire Ref
WIRE ROOTINGWire Ref
WIRE ROUTINGWire Ref
referenceWire Ref
refurbeshmentWire Ref
refurbshe0Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.