Skip to main content
Skip to content
Case File
efta-efta00796534DOJ Data Set 9Other

Work Order:

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00796534
Pages
29
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: Ni Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from prevtous day (or since Friday on Mondays) Assoc Status Discrepancy Resoludon 1 1.I Wdttng aCnrOvat (1.) 1.2 In Progress 1.2.1 Competed 1.2.2 Open 1.3 Waiting a.) 0(04 1.4 Completed 1.4.1 Completed 1.4.2 ComMeted 1.5 Waiting alnrowd 0.1 1.6 Completed 1.2 Completed Id Completed 1.9 Completed 1.10 Completed 1.11 Completed 1.12 Completed 1.13 Completed 1.14 Completed airfnmeGuirstreeas GSSO Comp led xlth IntounOPYcglmInacy Inspection as per RSQCT 57 rev 24 Complied with creflight impectlon as outlined in RSQCT-113 Rev. 23 Complied with Detrid drecklaL Part 91.409 f(3). N3 Other special documentation requests. Provided bed dearence per SOP 1028, all teals eanunted for Covered and NOteded as required Told serviced JAY( the ground herding and servicing hardback 14-00-00 Complete with interior inbotrel InSfiedianGA 3564 (CG) 5/17 and oleo Compiled ulM Sample MydraiAlt Flutlf Secured by customer soon arrival Complied with Service Team Manager Chectist Informaoon Cy*. Compiled xiith SIN/Quality reviewof work order and logbook entry PIN to depantre TOMO as required N/A no hatmat to be loaded. FOr bl1Yg purposes tined. Return To Service IntoundfOutbaurd Impectnn IntOunerellminary IFISDOCti3n Outbound InspecUon Preflight Inspection CoraPh with Detrid Oncklat ArriyaVDebref 90 Day De List Revell ACCCOWielle List C9eratoes Matt Tress Relultements &Special Documentadon RequeStS Tool Clearance Cover & Protect Service Channel Toilet/0ton Galley AfrIvaVDeParttre ASSISI & MOO Nroart SamPie Mircratglt Fluids Remote Valuables & Scare. Comply with Service Team Manager Check1st Molds Used (011s/9ttdr0) • (Materials Or4) SIM / Quality review 01 week Order and ite/bOOk con plot to departure Towing (Dees not include Hangar Mores) 1.15 Completed Hazinat - Identey & provide a manifest, and a SriggerS Declaration for Dangerous Goods for all hazardous materials that are loaded aboard any airaaR. FAR Pin 121 Of 135 Operators x111 proud° a hazardous material noting= letter reputed by FAR 135.505 (e) pax to mantereree at Ohs Repair Station tax FAR 145.206 (a) (b). If there b to be loading of hazardous matelots e shall be complied with by llama trained autheized GAC personnel orgy. 1.16 Waltin9 adarowd (L) 1.16.1 Open 1.17 Completed Moan Donn) CLEM1NG LAMING GEAR Fit PAINT Consumades & Shop Staple' 1.18 Waiting approval 0.1 Major Alteratnns regulatory comp/ once requirements to be completed by initaler ea notated on FM Pam 8100-9. Copy and paste from attached statements as needed and eat as moulted. COMPLY WITH REQUIREMENTS OF FAR 25.1301 (a) (0). 25.1353(a) and 25.1431(c) (d). COMPUED WITH THE REQUIREMENTS OF FAR 251301(a) (b). 25.1353(a) and 25.1431(0 (d). via GROAD TEST REPORT-REPORT Ho. CE)0(x)O3Ca REV. X, ( IN SUPPORT CS STC =Mean ) and GR4R216.4 REPAIR STATION INTERFERENCE TESTING REQUIREMENTS P057 MAJOR ALTERATIONS COMPUANCE FORM. COMPLY WITH REQUIREMENTS OF FAR 25.1529, INSTRUCTIONS FOR CONTINUED AIRWORTHINESS REF X)COCK MANUAL, P/N X)0(x)03( REV. X, FOR INSTRUCTIONS FOR CONTINUED AIRWORTHINESS AND BLOOM 8 CC FM FORM 337, DATED nifix)UXXXX COMPLY WITH THE WIRE ROUTING REQUIREMENTSOF FM POLICY MM-01-04 AND FAR 25.1353 (8) COMPLIED WITH THE WIRE ROUTING REQUIREMENTS OF FM POLICY MM-01-04 AND FM 25.1353 (13) By ENSURING ROUTING WAS IN ACCORDANCE AC43.13-11, CHANGE 1 CHAPTER 11, SECTION 8. 1.19 1.20 Vann) aPPrOwil (1) Waiting aPPrOyal Update WCi a Balance Catena Pant and Were & Stan Requirements. LI 15,2017 6.21.0S AM Gulfstream Proprietary Information Nrc I of 2"0 EFTA00796534 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalin 1.21 1.22 123 (L) Waiting approval (L) Completed Completed 1.29 Completed 1.25 In Progress 1.25.1 Completed 1.25.2 Completed 1.25.3 Open 1.25.4 1.26 Open Waiting Moroni 0.) 1.27 Waiting Wowed (L) 2 OMNI elt70071001-11 2.1 Discrepant/ Reyes scope or aircraft caterer pant touthspftepars, and Son replxements reviling in paint reapplication, dd determine arieCt on weir and batriCe. For surfaces where paint is stripped and reapplied or added on top of existng pant on Si area greater than 36 square feet tne thickness values will be documented before and after painting . If average thickness values remain the 'erne, sestet and balm review S not required. For surfaces painted wed an area greater than 36 square feet and before and alter pant tricnwss average vanes. QC review for pantile weight end blame revision will be reettred. • Tholosess wit be plotted on an aircraft droning derived from AMM chapter 6 or Weer sutable netch, attached to the work order and meastrements taken on a two glare foot grid. • Reference CAMPS 9000, paragraph 3.5.1 for paint restriclions to right control surfaces and RYSM certified aircraft • Reference CAMPS 9000, teal average thidness shall not (Steed 6 mils. • Per GAC Mass Propene= Engineering, pant thickness of 5 rids equSs .055 pounds per squre foot. Vane QC revs% night charge is greater than 2 pounds or .05% of MAC, the weight and balance report wig repute reoamwtaton. Aircraft Ready Co. Rotten to Service. Al reCured inspections, to include preflign espectins, maintenance tasks, 'secrets:anal & Ionchecks, related dowmenabco, and clearing activitiescomplete. Contact Return to Service group when Oh swank is complied with. Advise customer of °reser...Won requirements per ATA Chapter 10 of the releant maintenance manuals rot Engines, and MU; renew requirements en relation to schedled Date Pronned and later ',dental Date Completed; and perform maintenance 0, cresovaten actions as directed by the CuStOmer and documented at a Work Order Squeak. Pre-Compliance cabn refurbishment inspecbco NOTE: SEE APPENDIX CMP GSSO O1OO1O-Service Cater Maintenance Indexton Cheddig Comply with Het Cockpe and Ha Cabin Comply with intern Hot Codmit LAW RSQCT-26S flat-I Coney with intoinO Hot Caton JAW RSQCT•219 Rawl Comply with osaound Not Cockpit LAW RSQCT•265 Rev.' Comply with ciAtcund Mot Cain LAW RSQCT-219 Rev-2 Removed aircraft laptop and bag and sensed in Seen 94ansons office. Sales Conceseco 2.1.1 2.2 Completed Completed Completed Remove LH engne nose covA and replace with Rots Royce Padded ex hange snit Reference RR Newstbish: liF201302. Removed Lill Erg. toner inlet cowl PN:O9O2O31-O19 SN:GVSP159 and Installed customs.' 'waned Inlet cowl PH: 0400001-019 5th: GV5P134SV per OSP 711002 Item 11.1. Reference Removal and Installation book page IC. CMP GSSO 893131 Alert SO 8127D3-73-A912O383R1 Replamment of NOnCOnlOmling Parts of the HC Re%x AS9eMtly Labor Oily $1,652 Matenals. it Charge (Rolls-Royce Warranty) (AI • perators) The Intent of this Mon•ModificatIon Service SWOP, Is to replace EC-C firebox assembles that have an inglficient thickness of the rittroescent part Effecbvity: Reference Rolls.Rcsee Semite Etuletin 80.700-73- A900083 for effectMty Notes: ResOkiliOn Advised customer of °ogre and PA) preservation requirements. Complied with Pre-Compliance cabin nkstishment Section per 14 CM part 25. Complied with CMP GSSO O1OO1O-San= Center Maintenance India:ton Cheddist Complied with inbound Hot Cockpit LAW RSQCT-265 flat-I Complied with Intent Not Cabin JAW PSZCf.219 PAN-2 Summary: Retraced Lill Eng. loaner into cowl PN:O4CO3O1-O19 SN:GVSPIS9 and instated Rot Royce provided exchange inet cowl PH: 0401031-019 511: GV5P1345V per CW 711002. See steps below fa detailed work palormed. COMPLIED woe CMP GS5O 880131 Alert 58 W00-734500383R1 Replacement of Non-Conkemng Pats of the EEC Firetp3x Assembly. Not Appinstle due to engine Sin: effectMly Engem Sint: 15998 wth corfnutation standard 7100111 engumed On data plate. 12113,2017 6:21:O5AM Gut/stream Proprietary Information Pace ;a 2.9 EFTA00796535 5.1 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: Au Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalsas 2.3 hi 3.1 3.1.1 3.2 3.3 Completed Cemented Completed Canalised Competed 3.3.1 Convicted 3.3.2 Convicted 3.3.3 Competed 3.3.4 Competed 3.4 Competed Discrepancy Pans are savaged arid procured thrash ken Royce. Reese place your or with Relts-Rote Spares sin (6) months m advance and preekle 'MO need date SO OX'y Can endure parts aroilaff my. CapzeatcCem Detentes: Carstrern viii Frerace Rao. Royce CaparateCare for the rheas abate en the CusternerS behalf. Determination wnat is of is not covered under the maintenance program will be detenratO by Raleff ace. My charge, net conered b, the CorporoteCare pagan mil be the Custemsoz raperoibilty and %Mast to Gulfs-Cream's standard Terms and Conditons with regard to payment. Sutirresseon dl the mote 6 Fecicated on the CorparateCare maintenance program tang in (Dice at the Ome a service. "'CANCEL"' 04P G550 880466 Alert 58 EIR700.73 A101981R3 - Introduce= of a New EEC Firebox Asscrady nab a Revised Pant System. Resolution Cannot compete with at this time due to Darts avalabley. $6 emplane due by 31 /AN 2021 (38 rnos remaining). Customer Ssanatuie: Date: ENGINE 8R700-710C4-11 Rai-me NI crane ncee cent and replace with Rots Rate Panda/ exchange alt. Reference RR Newsflast NF2013.02. Removed NH Eng. Ironer inlet awl MV:0K0001-020 SN:GV5P171 and InetalleO cuRorror offered Inlet cowl PN: 040:031420 SN: 6139 per CMP 711002 Item I I.2 CMP MO 893131 Men SB BR703-73-A907383R1 - nepiaonnent of NanConromM9 Parts of the EEC Pae%x Assembly Labor 61,652 MatenalS ism Charge (RolisitOyce Warta*) (Ail Operates) The intent of this Non-Modification Service BuTetin is to replete One EEC firebox assembles that have an nuttoent thickness or the evanescent pert Effecbvity: Reference Rolls.Roroe Service &ikon 80.700-73- /ROCOCO far effectivity Notes: Parts are SCheckPol and procured thrown, ROBROW:e. Pease place your order with Rob-Royce Spares six (6) months in advance arty provide yea need date so they an ensure parts avaladlty. CapOrateCare Customers affstrearn vin invoice Rolls- Royce ComordeCrre for the cherges above on the Gust:Nods behalf. Determination what is or is not covered or the maintenance ortgram will be detamnol by Rale-Royce. My dorms not covered by the CorpaateCare pagan nil be the Custard:es Deem:relay and Subject toGuttman standard Terms an conoloons rah regard to percent. Suldrnssien of the riveKe is preocated co the CorporateCare maintenance pager being in force at the lime of stake. CannbalizeY•• duct P/N 0480402-005 from NC 5173 la NC 671, Ref: W.O. 50521837. 49.3.1 Removed to cannibalize 1- duct P/N 04F0402.035 sin /0459801. from NC 5173 for irate/label onto A/C 671 per RR ER710 BAH 36-1145 Rev. May 15/16 Install provizeusly rowed cannibalized duct P/N 04804024006 from NC 5173 for NC 671, itecieved el to install and installed pa ;REHM 36-11-45 Rev. May 15/16 Removed tannlinaleal`b duct P/N 0480402-035, S/N 704598CR from NC 671 and rotated into onnianal location on NC 5173 RH engine per RREMM 36-1145 Rev. May 15/16 TWA 558135, Due- 6/18 Leak deed required. Complied with leak check of Y- Ott P/N 0486932-005 on R/II engine with no leas detected per 6550 MM 36-11-6 August 31/03. "'CANCEL"' CMP 4550 890466 Meet 58 ER700.73• A101981P3 - Irooducten of a New EEC Firebox Assembly with a Revised Pant System. APU RE220 Tochnkal Bulletins (ASC, CB, SB, AD, ACB) "•CAUCEL• • 'CsIc Cs550 9/1162 ASC 1168 Nose Landing Gear (MS) Karnes • InstalLtecn COMMete0 Summery: Removed Rill Eng. boner inlet men fr4:040001-020 SN:GVSP171 and installed Rolls Royce provided exchange Viet cowl PH: 04C0031-020 SN: G139 Der 04P 711002. See steps below for detailed work portent& COMPLIED WITH CMP e3550 890131 Net 58 BR700-734.900083R1 - Replacement of Nan-Confirmiog Pens of the EEC F9.103x Astra:17 Nat Applicable due to engine 5./N: effectivity Engine S/N: 15449 oath ccroguratico standard 7100i-11 engraved on data plate. strnmann Removed to cannibalize duct P/N 04F0402•CCG 045513CR, from NC 5173 for installation onto NC 671 Der RR Eft710 EMM 36-1145 Rev. May 15/16. Removed embalmed V- ea P/N 04F0402-005, Sill )04598CA from A/C 671 and installed kilo aigianal location an NC 5173 FUH engine per RREMM 36-11-45 Rev. May 15/16 1WIr 558135, Due- 6/18. See Stet below. See Item 3.3.3 for reinstallation Cannot convey with at this time due to Darts avalabley. 56 a:sentence due by 31 /AN 2021 (38 mad remaining). Cogent, Signature: Date: Customer elects ro alien at this bme. Customs Signature' Date: ivisnoi7 6: i es Am Gulfstream Proprietary Information Pat I of1.9 EFTA00796536 Work Order: 5C521661 AC: 5173 ST/4: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status 6 /Monks 6.1 Completed Customer request to comp/y nth Registration change to Ref Rein 20.1 fa no* performed 112121E. Notes: Need 05< update for restrawn3 transponder etc. Pete Rawsen has ordered the wife Sri. 6.2 Watbng Customer request custom &midst be 'staled on DU. aooroval (l) Pease hold watt receipt ol Me custom ACL. 6.3 Completed Plight GLadarce Panel backichong does not Muir/rote for Sinewy: nicht 00s. Confirm NW Carved Item Discrepancy Resolution 6.3.1 Completed Removed night gullance panel (on: 7021852.901 sn: %030509) and replaced WM repaired Pr guidance panel (pn: 7021852401 en: 08080720) with no defects noted. NI work dad per GSSO CMP 221001. Ref tern 11.8 for CMP RIM. Renewed flight pub:lance panel (on: 7021852.901 sn: 06030509) and replaced wen repaired flight pub:lance Panel (on: 7021852.901 sn: 080130720) and performed Autopla operatenal deck with no defects noted. Ahnork done ref CMP G550 221002 item 11.10 and GSSO CMP 22100 kern 11.8. See steps baby/ fa work performed. 6.3.2 Completed Performed Auteibt operational ONNk with nodefects noted. Al work done ref CMP G550 221002 item 11.10. 6.4 Completed DU 24 mop. Swapped with DU 23 and problem (phoned. Removed defative DU and repliced nth notified DU (p.: 7028140-905 sn: 09125363) aid performed operation:1 deck with no defects noted. All work done Per 6550 CND 316024 and CMP 316030. Rel Items 11.7 and 11.9. 6.5 In Custard request to update ROAS settings. Progress 6.5.1 Completed Created one Settings and Riggrhas Der GER 5767 6.6 WAIN Customer requests to update the anhow 4000 aircraft zoomed photo wth the new blue paint sdierre and to add the (L) company logo. Logo to be worded by the Catania. Ref tern 20 1.16 7 Interior 7.1 Completed •••CANCEL•• 'Customer request to remove and replace or- Customs elects no action at this brae. SOW NW. YAM customer Selected Nees: Demon has samples for customer Customer Signature: Date: 7.2 WAN Fwd oxket door hande loose and Orals door operation. aooroval (L) 7.3 'Hsiang Lent hande for on pressure S scotching varier on as approval treSSure 000r (C8528041000) (L) Nathaniel 8.1 Completed "'VOID—Customer request to replace nose and man Otoicate Entry. REF ITEM 25.1 FOR TIRE REPLACEMENT des 8.2 Completed Replace Lil & RH Engem Cows ( to be supplied by Rots- Ref dens 2.1 & 3.1 foe wok performed Royce). Notes: Comorate Care item 8.3 In Customer request full dewing arid operatimal checks of the Progress Lavatory tank end sistan. 8.3.1 Completed Removed, cleaned, nspecte0, and reinstalled tftradOok sensors P61:7700395-001 LM SN:07.G-170]. and R/H 511:07- G-167 per CMP 380015/383024, and CMP 38(031/380032. Ref. Warns. 11.44,11.45,11.46,11.98. 8.4 Completed Customer request to irooect all exterior sense° door latches Sunny: Installed New latch P/N 145000-2•102-142 per BP 1159851110 Rev G to the external MED switch seroce for seryirstality end replace one discrepant latch en the door. Completed inspection of di sense door Latches per G550 MM 53-00-00 )une 15/16 and found no father external MED snatch prvire door diserepanes. (See steps below for a detail of work performed) 8.4.1 Completed Remtreed discrepant latch On the eternal MED switch Senkerlar Per ED 1159651110 Rev G. 8.4.2 Completed Installed New latch P/N 16000-2-102-142 per OP 1159851110 Rev G to the eternal MED swath service doer. Competed inspecdonol al exterior seroce door latches per 6550 MM 530000 Acne 15/16 and 6550 MM 5240.00 October 30/06 irking no further discrepsioes. 8.4.3 Completed Request paint onexternal MED switch Nate door die to The aircraft is getting fill Trap/paint (ref kern 13.1). The MED service {low latch wil be painted at this time. new latch Installation 8.5 Open Customer request to Cheek water system IndtatROS 8.5.1 Completed Complied with potable water tank soNix per G550 AlO4 38-1401 March 31/17. No indication on external pond noted throughout entire service. 8.6 Completed CMP G550 275019 Flap Actuator Travel Nut (Left) - COMPLIED WITH CMP G550 275019 Flap Actuator Travel Not (Left) - Lubrisabco Lubrication 8.7 Completed 04P G550275020 Rio Actuator Travel Nut (Right)- COMPLIED WITH CMP G550275020 Flap Actuator Travel NUt (Right) • tteaca0on Lubrication 8.8 Completed •••V011)•••CMP 6550 274202 Ilarnotal Stabnzer Vod - Cupleate of item 23.11. Actuator - Lubication 8.9 Completed 04P 6550 491005 PAl Embus:0 FS 767 • P5 797. Zonal COMPLIED WITH CMP G550 491005 APIA Enclosure FS 767 FS 797: Zonal InSPeCtian Inspection 8.10 Waibng Customer requests 12 spare aircraft keys. 12.15.2017 6 :lid AN Gel/stream Proprietary Information Nrc 4N:9 EFTA00796537 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status . approval (L) 811 Completed 8.12 Completed 8.12.1 Completed 8.12.2 COMOleted 8.12.3 Completed 8.12.4 Completed 8.12.5 Completed 832.6 Completed 8.13 Waiting approval 0.) 8.13.1 [Depleted 8.14 Completed 8.14.1 [Depleted 8.14.1.1 Completed 8.15 Completed 8.16 Completed 8.17 Completed 8.18 Completed 8.18.1 Completed 8.18.2 Completed 8.19 Waiting approval (L) 8.19.1 Completed 8.20 Completed Discrepancy Addeddorbo debrief Blue R FUEL RETURN FAIL' CAS message appeared one rair Into Might. Crew also noted Mat the rut NI temperature was 100 degrees odour and the left al temperature was 80 degrees atm,. Added during debrief Apu enclosure ha sward corroded fasteners basted as errJostre base loser amen panels Foetid Wile On:tying AIM CMP491005 • 8.9 Removed MU assembly for access to loner erdame pleb. Ref. G550 AMM 49-00-00 Rev. 2/15/15 Removed FWD base lower panel 31282F and MT base lower panel 312AZF. Removed corroded hardware and began cleaning pat per Drarang 1159851419 Rev. L. finished demng FAD base kw panel 31283 and AFT base lower panel 312AZF Crewing 1159851419 Rev. L. Installed new hardware on FWD base lower panel 3128/F and AFT base loner panel 312A2F per Drawrg 1159851419 Rev. L Installed MU assembly FN WE3800700-1 SN - P-500 per G550 ANN 4900-00 Rev. 2/15/15. Tess 567921 due 09/18 and 562027 due 06/18 Leak the* required on MU per 6550 MOM 494340 Feb 15/15. Complied welt leak died of AA) per G550 ASIM 49420-00 Feb 15/15. Received OK to dose APU panels and completed final closure. FWD bullet faring (knee panel) ha evidence of erase" at fwd edge around fwd lolling contra and a puncbse Side of faring. Areas marked with blue grease pencil Ref. Item 15.1 removed billet fairrg camera for faring repair LAW 60515050250 Rev Apu Enclosure has large area of dd0eded coating fwd I/h ade of apu enclosure. Request engineering disposition for MU compartment has large area of nre retardant missing. Ergineerrg dspostnn: The ombrig is not repairable. Remove any best a bumbling seniors of coa0ng. If applicable remove Me Atemate Method of Complarce autharizaton from the arcade records. Renstate the Annorthiness Drecbm AD 2009.17-01 end eforkAFM Supplement 6550-2009-03 in accordance with the state of registry regulleMertS. "'VOID"'UH aboard hOrq.Stab. leadrg edge has torn rubber seal. R0f. Paint Treed& " •VOID"'R/H irtrzerd Iell.sta0. kedIrg edge has torn rubber seal. R0f. Paint Traveler 04P 6550 992902 PD 2009-17-01 Inspect/3n FOr Sealant Applied To The Exterior a The Auxilary Paver Unt (APU) ErKIOSure. Ref 8.14.1 erg dspo for remstaong AD 2009-17-I Wing body fairing XICOI seYmrKi In done not Mate at panel 19648 aft of wing as marked with tape. REF 13.1.1 Removed discrepant dome nutpeate PV: NAS1474A3 from doubler Pit: 1159652017.41 per GAC DWG 11591352017 Rev 6. Installed dame nutPlae 11A514740 on doubler PM: 1159852017.41 and installed doubler. Back sea% elottler and nutplate. Work done per GAC DWG 1159852017 Rev B. Cyan 'MU Mart Reamed' Cas message on MU start. DC fault code 4922222APU (APU Row Cevider Sir Short) Ref tern 8.12 Gained access to 181A1P1 ( on APU Goers). Dsoonnected pug, Inspected and cleaned came, plug with no defects noted. Returned aircraft to angered cafgurabco. All OUVOSIMIXC performed song WWI 49-60-00 June 15/16. during panel 196A$ nstalation noticed were somrg freely. Marked with tape Resolution Perknned boated fuel return operaVonal check wet no defects noted. Al work done oar 6550 AMR 28.16-00 dated August 30. 2009. Decade reastcr box ID* 568366 cal due date 11/18 Suninary: Removed and cleaned areas around FWD base low panel 31262F and AFT base lower panel 312A2F. Replaced screws PN:M527039.0008 arid washers Rt:A/4960)08 per Droning 115%51419 Rev.L See steps belOw be full Stalk. ReM0001 al hose and crumbling sections of COOtrg per eng disco Ref Kern 8.17 be PD 2009-17-01 Ref item 8.14.1.1 kr eng depo MR11 6391 Ref 506238.20.22.1.1 "'VOID"' Entered In wrong NC verkOKI0e "'VOID"' Entered In wrong NC workeder COMPUED WITH CMP G550 992902 A0 2%9.17-01 Inspection For Sealant Applied To me DiXerlar Of The Aollary Power Urn (APU)Erdoare PrevlOuSly templed vnth in Log Book EMI, dated 08/18/09. Verified AFM Supplement 050-2009-03 was incorportated into the MM Renewed and rePtXed diSCMpant dome nutplate Pit: NAS1474A3 on 004.0/W PK 1199652017.41 and instated doubler per GAC DWG 1159852017 Rev 6. Installed nuts, ate PM: MAS1474A3 per GAC DWG 1159652017 Rev 8. 12,15,2017 6.21.0S AM Gulfstream Proprietary Information NeeSNW EFTA00796538 Work Order: 5C521661 AC: 5173 STM: Charks Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status I Diserepaney ReerWiliOn Ref kern 8.18 821 Compiete1 R/H elevator trim tab upper surface nas 3 areas of possible deaamnWon. Rd. Item 13.1 8.21.1 Completed Removed R/H elevator trim tab FIN: 1159C582095-423 S/N: 373 per OW4550 273024. Ref. Item 11.56 8.212 Completed NOT Inspection mowed on marked SPOt 8.213 Completed Engineerng Cispouton for three surface discrepanoes: Refer to Steps 1 thna 6. I. Solent dean the three areas using dean cheesecloth weer, wet wen HoproPil Alcohol. Continue until rapers 'then dean. Do not use synthetc or shop toted wiper ~torah. 2. $4 all wee locations sand ON surroundng paint using tamde paper anti a solid paint base exist. 3. At the two locations next to the grandrog jumpers carefully sand off the dry fit cloth to expose the carbon pir. Do not Leger art nto carton Alms. TraOSS« Claret remaining wein the rattle snail be acceptable. 1. Heat areas sp to 120 to 140F for at least 20 minutes. After reacting this lolo time and while heat is WI berg apeled, surface wet areas wen Epon 828/ DTA (GAC I ISAA2 GAC117G1 respectlx<v). S. Renacne heat source and :plow surface ta air mol to room temperature. Phalan at 70 to 95F trail the attache gels MaKII slop take dace after 4 hr,. 6. Na other action required shoe NC mil be undergoing repaint. This is inn, repay. MR8 NO. E064 8.21.4 Completed Rhea cleaned tie tree discrepant areas. At all three locations sailed off surrounding paint. At the two batons reed to the mounting jumpers carefuly sanded off the dry 821.5 Completed 8.22 ritteg aP)rosel (L) 8.23 Completed 8.24 Completed 8.24.1 Completed 8.242 Completed 8.243 Completed 825 Completed 826 In Progress 8.26.1 Completed 6262 Open 8.26.2.1 Completed F/G Mtn to expose the carbon ply. Heated areas to 120 to 140F tor at least 20 minutes Solace coated areas with Epan 828 / DTA (GAC11SAA2 / GAC117G1 respectively). Reference ergineerrg dsposstion in step 8.213 Installed R/H elevator blm tab P/N: 115%552095423 S/N: 373 per RIP 6550 273024. Ref. IS 11.561W 560348 Cal 12/2017 Horizontal stabiles R/II hoist plug stopped. Ref. 13.1 ull Flap Traded 1/8 Roller is worn beyond lints per 6550 MIM 273000 Rev. march 31117 Ref. 13.2 MI flap Track Aft I/O Roller is worn beyond Imes per 6550 AMM 27.5000 Rev. MarCh 31/17 Ref. 13.2 RemOved R/H Rart TraCk Mt outboard bracket Replaced WH Nap Traded 1/8 Wier with nor role, P/N 80233012Ft per DIP GSSO 275038 and Drawing 11591354220 Rev G Redved ok to Install and Instated R/H Flap Track "V AFT OM roller ntting. Bolts Still require torque and fang rewires sealant per 1159C554220 Rev G. Oct require torque and fang requires sealant per 1159(554220 Rev G. R/H Hap track 0/8 roller bracket for track has shipped out tolts. bot roles/nutplates may require clearing out. Ref/ism 8.24 While conveying wit paint strip lund dar in right fuselage at GYPS 694.000, skin P/N 115%51316. Impression is approximately C wide by r high and .012' deep. Rel 13.1.2 Request NDT to Chetk for cracks at discrepant area. Request engineering dive for repar of dent In the right fuselage. Preliminary Engneerng Csspastten: I. Gain access to the Wen« Side of the dented skin Visually inspect the dscrepant area for any additional d iamaten to surroundng structure 2. Cold work the dxrcpart area per the procedures in SR 1077 to restore the skn to surrouncing contour 4/..005 irs Strnmarr. Removed CI Omar urn tab PM: 1159C552095-423 5/Il: 373. Cleaned. pepped and repaired all Wee surface discrepancies. Reference Engineering *%O. in SOW 8.21.3. Installed Fuls eievator ten tab Pitt 1159352095-423 S/N: 373 Ref. DIP GSSO 273024 Items 11.56 See correspondrg steps for detals of work performed. 1W 560349 Cal 12/2017 NOT performed Tap test inspection on R/H elevator trim tab upper surface per GAC AIDTP 2.1 rev 7 09/16/2015 No relevant incicabons noted at MS tele Replaced NI %pi? Triads Mt I/B Roller with new roller, P/N KRF233012FT, LAW CIP G550275037 and Drawing 1159055420 Rev G Sirrimay: Removed Rill Flap 'V Traded outboard bracket Replaced NH Flap 11' Track AR 1/B it with new roller, FIN XRF233012FT. Installed R/H Flap 'Er Track Mt aboard bracket. Work performed per ChIP 6550 275038 and Draning 1159C554220 Reg G. See steps below far detakd week performed. Torpred toOltS On fitting and sealed per 1159C5524220 Rev. G Torque Wrench* 558039 CAL: 08/18 Upon further imestigaton round R/H Flap Track B' 0/8 ROter Bracket hardware to be stepped and ~rates are functioning property_ Instated and torqued NEW hardware per 2741-05 Rev. November 15117. POttrmed Eddy Current Insp.:than per GAC NOW 3.0 (REV 7 SEP 2015). No <redo noted at the bele. Equprnere Used: Hartet 5005 GACD 555039 (cal due 12/17) and SID. 560706 (no cal reg.) Christa Kerby, MR81E742 12/151011 6:21:0S AM Gulfstream Proprietary Information port 6 of 29 EFTA00796539 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawky AS Yelloiv = Newly Added Items; Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stan—al Disawanogr Resolution Dill a hde .1285-.1335 in. de. per GQIIIAL1)35G at the sharp, center part of the depress= to relieve the retard aid tartrate celd "sonde° 3. HOT the cold worked area for cracks (eddy current) and remanng matend thane's (ultrasonic). 4. Inspect the cold waked area for al canning. 5 Rea*nit results to engineers; sar evaluation. mRe4/742 9 10 10.1 Wang aPProved (1) Paint Outstorialksp Parts, Materials, and / or Services Eng inee rs tater 10.2 10.3 Wattles, approval (L) Waiting a0Orcwar a.) Back Ordered PartS Pats Return 11 11.1 Completed 11.2 Completed 11.3 Waiting (I.) 0(04 11.4 Waiting approval 0.1 11.5 Wattles, approval (L) 11.6 Comokte0 Follow on CMP Codes / Maintenance Tasks CmP 6550 711001 Inlet Cool (Left) Remota I Instaltstian Rel. 2.1 COMPLIED WITH CMP 6550 711001 Inlet Coal (Left) - Remard / Installation TW 558064 Cal: 08/1E COMPLIED WITH CMP 6550 711002 Inlet Carl (Right) - Removal f Instalaten TW:557274 Cal Due: 06/18 1V(:557259 Cal Due: 03/18 COMPLIED WITH CMP G550 711022 Upper Cowl Door (Right) - Removal InetallatiOn Torque Virendies used: 557274 Cal die 06/18 557259Cal due 03/18 COMPLIED WITH CMP G550 316024 DISPLAY I.X4IT, x4 pn off: 7028140-901 PO on: 7028140-905 sn oft 07092716 sn ore 09125363 COMPLIED WITH CMP 6550 221001 PANEL, FLIGHT GU@VICE(GPS00) Po OlflOn: 7021852-901 sn off: 06030509 sn an: 090130720 COMPLIED WITH CMP G550 316030 CElfIRM. DISPLAY SYS - ADJ/TEST COMPLIED MTh [MP 6550 221002 AUTOPILOT—OPERATICNAL TEST COMPLIED WITH CMP G550 330901 SWITCH PANEL 11 COMPLIED WITH CMP G550 330930 SWITCH PANEL 130 COMPLIED WITH CMP 6550 330935 SWITCH PANEL ar3S COMPLIED WITH CMP 6550 330924 SWITCH PANEL 124 COMPLIED WITH CMP G550 330904 SWITCH PANEL xe COMPLIED WITH CMP G550 330925 SWITCH PANEL 125 COMPLIED WITH CMP G550 330942 SWITCH PANEL : 42 COMPLIED WITH CMP 6550 330938 SWITCH PANEL 138 COMPLIED WITH CMP 6550 330936 SWITCH PANEL 136 CMP 6550 711002 Inlet Coal (Right). Removal / Installation Ref. 3.1 CMP 6550 7110190ml Door, Engine Lower (Left) Rel. Item 2.1 CMP 6550 711020 Engine Loner Carl Door (Part) - Removal f Instalatian Rel. Item 3.1 CMP 6550 711021 Upper Cowl Door (Left) Rerrograli Installation Ref. Han 2.1 04P 6550 711022 Upper Cowl Door (Right) • Rerno4 InetallatiOn Ref. item 3.1 1I.7 COmOlne0 04P G550 316024 DISPLAY UNIT, a4 Ref 64 11.8 Completed CMP G550 221001 PANEL, (LIGHT GUIDANCOGP-500) Rd 63 1I.9 Completed 11.10 Completed 11.11 Waiting approval (L) 11.12 Waiting 00rOyal (L) 11.13 Waiting a00rOyal a.) 11.14 /long Wowed (1) 11.15 Waren, Wowed (1) 11.16 Wang angrOyal (L) 11.17 Waiting angrOyal (L) 11.18 Waiano angrOyal a.) 11.19 Waiano approval (1.1 CMP 6550 316030 CENTRAL DISPLAY SYS - AD)/TEST Ref 11.7 04P G550 221002 AUTOPILOT—OPERATIONAL TEST Ref 11.8 04P G550 330901 SWITCH PANEL xl (48251) (VEST. SW PHL) 04P G550 330930 SWITCH PANEL X30 (60157) (t/H DIVAN AFT ARM SW PHL) CMP G5S0 330935 SWITCH PANEL 135 (601510) (R/H SEAT 93) CMP G550 330924 SWITCH PANEL 124 (601511) (VH SEAT al SW MIL) 04P G550 330904 SWITCH PANEL X4 (59651) (FWD LAV SW PNL) CMP G550 330925 SWITCH PANEt. X25 (60153) (Lill SEAT *3 SW PftL) 04P 6550 330942 SWITCH PANEL 142 (69652) (AFT LAV SW PHL) 04P G550 330938 SWITOI PAHO. 138 (601512) ( I4 DIVAN LEDGE FWD StY PM) 04P G550 330936 SWITCH PANEL 136 (601511) (WI4 DIVAN FWD ARM SW PHL) 12,M2011 ag IDS AM Gulfs:beam Proprietary Information Nos, of 29 EFTA00796540 Work Order: SC521661 AC: 5173 STAN: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status DIsaspancy Resolution 11.20 Waibng aPoroyal CMP GSSO 330905 SWITOI PANEL IS (59652) COMPLIED WITH CMP GSSO 330905 SWITCH PANEL 15 (FWD IAV SW PHL) 11.21 Walarg aPoroyal 04P 6550 330940 SWITCH PANEL X40 (57153) COMPLIED WITH CMP 6550 330940 SWITCH PANEL #4.0 (L) (ENT CABINET SW PHI) 11.22 Walarg aCIProyal CMP 6550 330928 SWITCH PANEL 128 (60155) COMPLIED WITH CMP 6550 330928 SWITCH PANEL :28 (L) (Ull DIVAN LEDGE FWD SW PM) 11.23 Walarg aPProyal 04P 6550 330927 SWITCH PANEL x27 (60154) COMPLIED WITH CMP 6550 330927 SWITCH PANEL X27 (1) (Lill DIVAN FWD MM SW PHI) 11.24 Waibng CMP GSSO 330943 SWITCH PANEL 143 (69653) COMPLIED WITH CMP GSSO 330943 SWITCH PANEL 143 40(04 (I) (AFT IAV SW PHI) 11.25 Waibng CMP GSSO 330933 SWITCH PANEL 133 (03159) COMPLIED WITH CMP GSSO 330913 SWITCH PANEL 133 Wowed (R/H SEAT a 15W PNL) 11.26 MOM 04P G550 330939 SWITCH PANEL X39 (601514) COMPLIED WITH (MP G550 330939 SWITCH MEL X39 Wowed (L) (Fall DIVAN AFT MM SW PNL) 11.27 Walarg aPProyal CMP G550 330941 SWITCH PANEL x41 (50251) COMPLIED WITH CMP G550 330941 SWITCH PANEL /41 (L) (CREDEM2A SW PPM) 11.28 Walarg aPProyal 04P G550 330929 SWITCH PANEL X29 (60156) COMPLIED WITH CMP G550 330929 SWITCH PANEL X29 (L) (Ull DIVAN LEDGE AFT SW ML) 11.29 Waibng CMP GSSO 330932 SWITCH PANEL 132 (57152) COMPLIED WITH CMP GSSO 330932 SWITCH PANEL 132 4 0,04 (I) (VH WINDOW x 7 SW MIL) 11.30 Waibng CMP GSSO 330937 SWITCH PANEL 137 (601513) COMPLIED WITH CMP 0550 330937 SWITCH PANEL 137 Wowed (I) (R/H DIVAN LEDGE AFT SW PHI) 1131 MOM 04P G550 330903 SWITCH PANEL X3 (57352) COMPLIED WITH CMP 6550 330903 SWITCH PANEL •3 Wowed (L) (GALLEY SW PNL) 11.32 WalOng 04P G550 330934 SWITCH PANEL X34 (57151) COMPLIED WITH CMP 6550 330934 SWITCH PANEL :34 .300royal (L) (III SEAT *2 SW PNL) 11.33 Waibng aPProyal CMP GSSO 330902 SWITCH PANEL 12 (57351) COMPLIED WITH CMP 0550 330902 SWITCH PANEL 12 (1) (GALLEY SW PNL) 11.34 Waibng aPProyal CMP GSSO 330931 SWITCH PANEL 131 (60158) COMPLIED WITH CMP 0550 330931 SWITCH PANEL 131 (1.) (VH WINDOW • 6 5NY PNL) 11.35 Waibng 04P GSSO 330926 SWITCH PANEL 126 (60152) COMPLIED WITH CMP 0550 330926 SWITCH PANEL 126 (I)owed (I) (Ual SEAT a 2 SW PNL) 11.36 MOM 04P G550 233084 DIgtal WJeo Du Mayer (No. 1) - Neal COMPLIED WITH CMP 6550 233084 Digital Video Disc Player (Na. I) - Anal Phase Removal! Installation 'Vowed (1) Phase Reward / Installation 11.37 walerg aCcroyal CMP 6550 233089 Digital Video Disc Play. (No. 2) - Final Phase Removal/ Installation COMPLIED WITH CMP 6550 233089 Digital Video Dale Player (Na. 2) - Anal Phase Removal! Installation (L) 11.38 WaiOng CMP GSSO 233061 Ccenpact Dec Mayer (1b. 1) - Anal COMPLIED WITH CMP 0550 233061 Compact Doc Mayer (Ho. 1) - Ansi Phase Removal! Irate/latch 40(04 (L) Phase Remy& / Installation 11.39 WaiOng CMP GSSO 383001 TOILET, AFT LAY 40(04 11.40 Completed CMP GSSO 323011 lading Gear Errercency Extemion COMPLIED WITH CMP G550 323011 Landing Gear Emergency Extension Nerogen Dm-dawn Battle (Right) - Nitrogen Bkrnmaann Bch* (Mgt) - Rernotal Inge/labor, Removal/ Instalatian 1W: 568539 Cal. Due: 02/18 IW: 562027 Cal. Cue: 06/18 11.41 Completed 04P 6550 351023 Crew OXygen Mask aria Regulator Box COMPLIED WITH CMP 6550 351023 Crew Oxygen Mask ant, Regulator Box (CI:Karver) Removal / Insolation (COServer) Removal / Imtalation Ref. 23.22 11.42 Completed CMP 6550 351036 Mentor Oxman Mask Removal / COMPLIED WITH CMP 6550 351036 Mover Oxygen mask Remcnral F Installatian Installation R01. 23.22 RBJ page: I2C 11.43 Waihng aPpnwal 04P GSSO 381001 WATER TANK, el Rd. 15.1 (I) 11.44 Yealorg wormed CMP G550 350015 Waste Tank UltrasonK Level Sensor (Left) - Removal / Installation COMPLIED WITH 04P 6550 380015 Waste Tank Ultrasonic Level Sensor (Lett) Removal/ Installation (1) IW: 567921 Cal Due: 09/18 11.45 Completed CMP G550 383031 Waste Tank Ultra Level Sensor left. COMPLIED WITH CMP 6550 380031 Wage Tank Utra Level Senor left, Oeanng 12,15,2017 6:210SAM Gulfstream Proprietary Infermatien Page Ref 29 EFTA00796541 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Disawanet Resolution Oesnrg TW:567921 Cal Cue:09/18 11.46 amMete0 04P 0550 380032 Waste Tank Ultra Level Sensor Right, COMPLIED WITH CMP 6550 380032 Waste Tank Ultra Level Sensor Right Oearing 11.47 Waiting Oben% CIO GSSO 393025 Logs Gritrol Motb.ne System-bps Ck 1W:567921 Cal Due:09(18 %WOW, 0.) 11.48 Waiting CIO 6550 383024 Waste Tank Ultrasonic Level Sena COMPLIED mni OW 6550 383024 Waste Tank Ukrasonic Level Sensor (Right) - Renaud/ Installation %PAWN 0.) (Right). Removal / Mstatation 1W: 567921 Cal Due: 09/18 11.49 Completed CMP 6550 283006 FUEL SYS-Aux POWER UNIT BLEED COMPLIED Mill OW 6550 280006 FUEL SYDAUX POWER LMT BLEED Ref tern 8.12 11.50 amMete0 O4P 0550 4%001 ArAdlaiv Power Unit (.41V) FurX04n31 COMPLIED WITH CMP G550 490001 AlWilify Power Unit (ARV) • Funanal TeR Test Ref tern 8.12 Ref. swam& 8.19 11.51 walOng approval O4P 6550 342650 Reward tcoVng Infrared Whtlaw Assembly - Removal / Installation (L) 11.52 WalOng CMP 0550 352009 PAX 0kV SYS (AUTOIMMI)-FUNC CX 11.53 (L) WOW, amMete0 O4P 0550 491101 OM • Removal 2 tristalaUon COMPLIED WITH CMP G550 491101 API) • Renxreal / Installation Ref tern 112 11.54 Waiting CMP 6550 275001 Ftnp Assernbly (Left) - Removal f %WOW (1.) Installation Ref.13.1 1 11.55 Waiting CMP 6550 275002 Rap Assernbly (Rapt)- Removal! 'onward, (L) Installation RE113.1.1 11.56 amMete0 CMP 0550 273024 Trim Tab, Elevator (Right) Rel. Item 8.21 COMPLIED WITH CMP 6550 273024 Trim Talx Elevator (R301) 1W 560348 Cal 12/2017 11.57 Com0kte0 04P 0550 273306 EVL 1R114 TAB CONTROL SYS • Fa COMPLIED WITH CMP 6550 2733% EVL TRIM TAB CONTROL SYS - Fp 11.58 WAN approval 04P 0550 324003 Main Wheel Assembly (Left Outlwald) • Removal f Instalation ref 25.1 (1) 11.59 WAN approval O4P 6550 324004 Main Wheel Assembly (Left Irtgard) • Removal f Instalation ref 25.1 (1) 11.60 WWg 04P 0550 324005 Main Wheel Assembly (Right Inboard) • 11.61 %OW (L) Waiting ReM041 t IngalatlOn CMP 6550 324006 Man Wheel Assembly (Right Outboard) - %OW 0.) Removal t Insta1a0an ref 25.1 11.62 Waiting wows CMP G550 324009 Win Landing Gear Wheel Iliearrg (Left Outboard) - Inspection / °NW ref 25.1 (L) 11.63 Wdl0rg approval O4P 6550 324010 main Landing Gear Wheel Bearing (Left Inboard) - Inspection !Check ref 25.1 (L) 11.64 Wdl0rg O4P 6550 324011 Main Landing Gear Wheel Bearing (Right Wowed (L) Inboard). Inspection /Check ref 25.1 11.65 ww0 aCgrOgil O4P 6550 324012 Main Landing Gear Wheel Bearing (Right Outtgard). Inspection / Owe i ref 25.1 11.66 (1) Waiting DIP G550 324015 Win ire Assently (Left Outboard) - %OW 0.) IASI/Mien ref 251 11.67 Waiting CMP 6550 324016 Mein lire Assembly (Right Outboard) - 'onward, 0.) Inspection ref 25.1 11.68 Walen9 04P 6550 324034 mam lire Assembly (Right Inboard) • 'onward, (1) Inspection ref 25.1 11.69 Walen0 04P 0550 324033 Main lire Assembly (Left Irtgard) • 'onward, (L) Inspection ref 25.1 11.70 Walen0 CMP G550 324020 WHEEL. L MG OBD(s1)-NDT 1N5P ref 11.71 %NOW (L) (Halting aCIINOYal 25.1 CMP 6550 324021 MED., L MG INEID(E2)-NOT litSP ref 25.1 0.) 11.72 (Halting approval CMP GSSO 394022 MED., R MG IN/30(e3)4407 INSP ref 25.1 12,15,2017 6:21IISAM Gulfstream Proprietary Infermatlen Parc 0 of29 EFTA00796542 Work Order: SC521661 AC: 5173 STM: Charts Thomas SCC: Julian Brown Squawkm MI Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Discrepancy RawAudon (L) 11.73 Wean? aPPrOWI CMp 6550 324023 WHEEL, R MG 0013(09)-NDT INSP rel 25.1 11.71 %Werra reprovd CMP GSSO 123301 Htin The Assembly - Seniong ref 25.1 (L) 11.75 COmPkted CMP G550 314030 Modular ALtOnKS Unit r 1 - RemOval / COMPLIED WITH CMP 6550 314030 Module. nocrucs Unit II • Removal / Instalation Installation Torque Wreed, C/N: 553002 Due: My 2018 11.76 Competed 0.1P 6550 314034 »Muter Amoncs Unit R2 - Removal COMPLIED WITH CMP G550 314034 Modular Avows Unit 42 • Removal! Inealation Installation Torque Weird ON: 553002 Due July 2018 11.77 Wailing aPPro•ul CMP 6550 314120 A5C8 Tenn Sweep COMPLIED WITH OW G550 314120 A503 Tehet Sneep 11.78 Cu Waiting aPPM•gl CMP GSSO 314025 CENTRal ter STS OP 01E0( (L) 11.79 Waihrog approwl CMP GSSO 344207 Enhanced Ground Pm:dinky ~hear Warning System - Rerun to Service Test COMPLIED WITTI OW 6550 399207 Erhanced Groots Proximity Weidshear Weinig Swtern - Relent to Service Test (L) 11.80 Wailing approwl OW 6550 344201 MODULE el, EGPW5 COMPLIED~ CMP 6550 344201 MOCULE sl, EGPWS (L) 11.61 Wailing approwl CMP 6550 345810 GPS • Opratbnal sea COMPLIED~ CMP G550 345'310 GPS • Operational Cheek 11.82 Carpeted CMP 6550 314309 inadular ALtOnKS UnIt 43 - Remaal! COMPLIED WITH CMP G550 314309 Module. avioncs Unit 43 Renwal! Ingalatgn Installation Torque WrenchC/N: 553002 Due July 2018 11.83 Wien? aPXOYal CMP GSSO 314320 MW -Operational OieW COMPLIED WITH CMP GS50 319320 mau Operational Cheer (L) 11.81 Waibro warped CMP GSSO 275037 IS Track flap Raters (Left Inbed Upper Aft) - Renwal! Installation COMPLIED WITH 09P 6550 275037 B Trade Flap Rollers (Left Inboard Upper Mt) - Removal! Instalbbon (L) Rel 8.23 TW: 558064 a due: OB/18 11.85 Wean; approval CMp GSSO 275038 IS Track flap Raters (Right Inboard Upper M)- Removal! Iretdlabow COMPLIED WITH DAP GS50 275038 B Trod, Flap Rollers (bald Inboard Upper AR) - Rernmal / Installation 0.) Ref 8.24 TW: 558064 a due: OB/18 11.86 Completed •••PERMMANT REMOVAL*** 0`4P G550232150 Cabin •••PERMENANT RWOOVAL".• COMPLIED WITH OP GSSO 232150 Cabin Netwak Accderetor. REF: SOR INSTALL Network Accelerator 15.15 Pfit 1110-A-C601-20 5/N: 669 F5: 632.000 WT: 10.12 LB5 12 WCR's - Work Change Requests 12.1 ~Ong aPPrOval WCR 1- APPROVED: Custc.ner request the Entrance Doer. Arstalr Door Jamb, Insole tanong Gear Deti'S and Insole Cl.) Surfaces of me ha Crakes oe panted "mite at exlstrog color. This WCR is witten to commwrate chance horn proposal 7037536, and customer drecoon Informant° 0* Item 12.2 Wawa «Prowl WCR 2- EXCUSED: Customer request to replace al Cam etsset Inn; material we. OJSIOMet selected grossOnt. 22.3 (L) Open WCR 3- APPROVED: Customer request to renvox the two 12.3.1 Open (2) console table; and Ws Iron me win sae ledges. Wood later Only 12.3.2 Open INT Swport (OA) Labor Orgy 12.3.3 Open Inspeedan tabor Oh* 1ZA Ogen VCR 4- APPROVED: Customer request to remove al cabin dual curtielders and replace with single ocholders No cuplidders wal be required at the dieren or the area 'Mere the two cosset tables are rerncned. 12.4.1 Open INT Sheet meal Labor Only 12.9.2 Open Wood Labor Only 12.9.3 Open Inspection labor 0* 12.5 Walbng arofovai V/CR S- DECUNED: Customer request to replace the aIrStar vinyl with new customer selected 12.6 (L) Open WCR 6- APPROVED: Customer request to replace the galley and galley annex counter top nouns mtt. narcinood. The current nosngs will be removed. The sen noungs wil be fabricated of hardnood and veneer. 12/11,2017 6:21.0SAM Gulfstream Proprietary Information Pan IO of 29 EFTA00796543 Work Order: 5C521661 AC: 5173 SIN: Charles Thomas SCC: Julian Brown &pawl= MI Yellow = Newly Added 163,174 Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Ain Stalin I Diwreglancy Resolution 12.6.1 Open Wood Labor Only 12.6-2 Open INT Finish sal Paint Labor Onty 12.6.3 Open Inspection Labor Ortv 12.7 Waiting approval (L) WCR 7. DC-CUNED: Customer requests t0 add MO (2) each 110 VAC and two (2) each USE <hissing ports in the mdWL 12.8 Waiting atOrOval ViCR 8. CeCURB): Customer leaves% instaltgron of LED Wester lights. 12.9 (1) Waiting approval note: /WPM light bezel plating Is not Included. Sboutl the light bezels realm plating. the Rem wll be worked as a tole and material effort ova 9- DECLINED: Customer requests to replete all calm hardware. 12.10 0.) Waiting eeProYal Due to fluctuations in plating costs, cis WCR a berg presented as a bidgetary effort. Al Ginn hardware wit be remover, and Matra to the customer selected finish. the plated terns wit be reinstalled and operatenaty inspected for proper fit and function. Notes: My repairs found nerinsxy ere not included end wet be addressedon a brie and inaterwl basis. VCR 10- CeCUNIEO: Customer request t0 recover Me baggage compartment with new grosspoinl matted. 12.11 (1) Waihn9 aPProval Tee baggage compartment will be disassembled as required t0 remove al misting grosspoint from the subsoate and omen. Specified grossoont will be notated on panels and all areas of baggage Al applKable hardware and hardwood Ifni v.11 be repainted to match the new macro,. PrOpOSal based on reuse a all applicable gOstrate and componentry n exhort° COM:MOM Repairs to substrate pats are not included and veil be quoted on a tine and material bags. VCR 11. CC-CLINEO: Customer requests to replace the curse-it chna and flatware trawer inserts with new. (L) 13 Option 1• Full Pant • (Ref. Item D 1.1 of Prommel 13.1 Open ID* 7037336, ROD) Option 1. NI Pant The preparation and applcation of the exterior pant wll De appled n accordarxe with the orocethres are specifications waned n the Gulistrean Aerospace Material and Process Specification (GAMPS 4000) and will Include tire Witmer.) Customer 'peened elements: 13.1.1 In The enSb09 Paint roll Pre removed from the Swart. Compoote surfaces wil be self sanded to 'ww.e the Voss from the excang paint. The main entrance Antall- door. Altair doorjamb, and baggage door Arne wll De parted to mach the Primary fuselage Woe. The nude of the landing gear doers wet be painted with the same base color as the outstie surface. The Landing gear wet Pre deaned. Ynng waks wll be applied n madame with approved A new radon DOOt wll De !Doled. An antenna leadna edges wll have erogon tape applied. Preciously polished metal nada= wil be buffed. The Mine surfaces of the aimrakes wet be painted. After completion of tne niter or paint, a weight and balance MI be performed on the aroeft. Any terns not listed above wil be quoted map:retain basis by the GlifStrtem laciltes Pant Operdt715 manager, inducing labor and materials on a Won Ovnge Recitell (MR). "' SEE APPENDIX FOR ADDITICOLAL IAPO •" Methanol Pant Traveler 13.1.1.1 Progress Completed Temperately install of panel 32SAT, and panel 337CT fee part traveler Pet 6550 ANN 55.30.00 Rer.ftw 15/17. 13.1.1.2 Open Rel.13.1.1 Remove panel 32SAT, and panel 337CT after con:fees, of pant bander per GSSO Anal SS-30-00 Rev.Nov 15/17. Rel.17.1 13.1.2 Waiting 2rea Aircraft Sopped aircraft per GAleS -0300 rev. G. 13.13 Imp In Prep AMA PrOWeSS 12/108011 6:21.m AM Gulfstream Proprietary Information Paps I I of 1.9 EFTA00796544 Work Order: SC521661 AC: 5173 STM: CharIM Thomas SCC: Julian Brown Squawks: M Yelblv = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC i Stalt181 I Disamsancy 13.1.1 Open 13.15 Open 13.1.6 Open 13.1.7 Open 13.18 Open 13.1.9 In Progress 13.2 Completed 13.3 Open 13.3.1 Open 13.3.1.1 Completed S Waibng approval (1) In Progress Layout ArcreA Part Aircraft DetallNrcraft Weight and Waite customer support ergneenng supped Inspect di flap rollers prior to pent. Radome to Snare perimeter steps. detail Insprxtion R/H Se negative step of .053 out of links, matted with moskng tape with mows per G550 AMM 53-02-01 Rev. Nay 15/17. Ref Plant bavekx 1 le. Request engineering Oimosnon to cared rt/H Sate negaave step on radorne that is out of limits. Engreeerng Dspezton: It IS acceptacie to repar the outol.toluance radcrne sten In accordance with Gurstream %nice Letter GSL035300301 Rev. .*Aerodinarnic filer Sweep- Fair Procedure - Radcme Steps". This Gullstrearn Seneca It (a) a Ct3S9Aed as a Man& acturers Service Document and IS gleeMed by ArIMPXy Circulars 20.176A and AC 120.77. Completing a repair per a Gullstream Serwce Letter is Slmfar to tOrnMeting a repair per the Sincere Meer Manual (5R/4); No sepal number specric FM Form 8103-9 is required and mil not be mended n support of a GSL repair. The Engneenng (Scarce) Data for this Service Letter has been shown to comply AIM the soot* FM'S artIls FM Approved. &sinew.° source data is retained by Gulfstrearn as propietary data. Photographic Documentation • (Re. Rem Ei it Of Proposal IDS 7037536, ROO) Protourare- Whimcreation a no dupe to Customer may be taken n act:rant nth the folbmng agreement between the Custoter and Gullsveam. Should the Customer like to ParVegate in this PhotograpNc Documentation, please renew the folkmirg agreement and authorize by accepting this item on the proposal summary Page Agreement: airstream reserves the right to photographicallydocument the outetting process and the refurbshe0 arcraft. Al Photographic DOCuMentifign Is accompli9ed at GtOstresen% dsueton. GI-Ostrom reserves the right to use in advertising, as the affStrearn Internet sites GullereamsAde0S. promoting or othenstse supporta° the business of Cunneen\ Inciudre wakes imeaoca copYng, ram:duct/a% ph1shing in a Before and After coffee table beck, n hole or in pal. Indvdually a In conjunction AIM other matcrials. The aircraft and oanosimp information ...al Mt be mdoded in any pubic p/blicabch Buyer is prended with the lc/loving photography after aircraft delivery: One (I) electronic copy et areran Fee.teg-afwe 3st Oxman (Ka-hand) Nigh-Speed Data installation - (Ref. Item 5 2.2 of Proposal me 7035248R03) xt Convex (ca-band) Mgh.Speed Data Sr-tern Instaltsban GLOstream kyr' instal this latest swum of high-speed firoadeand aata SyStetn. Ore (I) Modem Manager (MCOMNI) will Pe installed in Me aft baggage compartment Mance. cabinet. If Sat TV a installed, the exating cabnet will be modged and reused unless the cost exceeds the new canon instalaten. AS the overall manager for the system, the MOCNAN IS responsible for providing the user interfaces to the aircraft/Passeurn One (1)Aerefgutlai Personalty Module (AFM) WI be loaned in Me baggage comparonent eritirent cabinet and hems the configuration data For he system. One (1) Ka-bend fticraA Nehmrk Data Unt (KAHOU) will be installed In the boiler room. The Keirei receives commands from the HOOMPI Trough an Ethernet Interface to merlon the antennall(REU and reports status oar this Ethernet interface One (I) sa.band Frequency Unt (KRIV) will be neater:1n the prnornty of me MIA assembly on toe of Metal empennage. The KRA) contains a Nod-Goan Gornerter (BOC) to convert the received Ka-band frequencies to IF fretruendeS and also is made up of a Mcek-Llp Comae. (WC) to convert the If frecoenoes to Ka-band frequencies. A High poner /honer (HPA) :sways me send strength for trans:visual by the antema. One (1) Tail Mounted Antema (TIM) wil be mounted on Reeoludon Pertained. Rap Rote Inspection pox to paint per 6550 AMM 27-50-00 Rev. March 31/17. See terns 8.23 6. 8.24 tor squawks Ben Ridgdll GAC MRB 01680 12n 52o17 6:2LOS AM Gulfstream Proprietary Information hoc 12 a /9 EFTA00796545 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC Status Discapancy Resolution top of the WI arpennage underneath the radcme. The arterna system is to and establsh communIcanons well SatellteS In WOWS orbits t0 enable beyond linter- ere commutate:els between airborne, ground read, and raid transportable terminals. The Radome WI be removed and replaced by a new Ka- band capable radyne. Certification: The Set ConneX (Ka-bard) High-Speed Data System along with the Sakern Direct Router wil be Installed via Guesbearn STC: opected, avalablity oa STC, 4th Quarter 2017. •• • SEE AP9f-NDIX '• • 15.1 .1 In Awonks Engineering tabor Avbnics Progress 15.1.2 In Mach Engr Later MOM= Progress 15.1 .3 In AVI SySteMS Test Labor Cray Progress 15.1.4 In MI /Beano' Labor Only Progress 15.1 .5 In AVI Sheet Med La0or Cray Progress 15.1.6 In INT Sipped (PEA) Labor Only Progress 15.1 .7 In SC maintenance/HOW t Primary Cedes / Roth Labor Only Progress 15.1.8 Open SC Pant Labor levy 15.1 .9 In Inspection tato, Cray Progress 15.1.10 Open Weight and Etaknre Labor Only 15.2 Waiting aPPrOull COMPLY WITH DRAV/IHG CPE303000090 REV. B (KA- BANO) 0.) 15.3 Open Comply with GPX303001084-501 Reef, 15.3.1 Completed Removed exisang antenna structure teackets pans GC54403006413, • 14, • 15, and -16 at F15 993.60 , renewed weight lis .45 It6 , one 1159a:152050-001 and -002 .25 lbs each, one each 11596552014-067, 068 end 059 removed waste b .10 lbs and, one 1159a52014-059 removed weight is .05 lbs per DWGx GPX30X01084-501 Rev F (kA BAND - GSSO INSTALL) 15.3.2 Completed Vented parts from stock G144304001379-301 Tray Parr, GPM468001411.301 GAS Fan Duct RM. GPM304001379.101, CP14304001408-101. GPM304001409.101, GPH304001407-101, GPM304001380-301, GM430400l381.30l, GPM304001383.301, CP14304001382-301. GP M304001405.101, CP14304001405-101 Brackets. LOCated and drib:6 noted parts at Vat Stab PS. 1033.1 BL 0.0 per GPX303001084-501 Rev. tat TO INSTALL) 15.3 .3 Open Installed GP/4304001379-301 Tray F6SY, G144469001411-301 Guided Fen Dort Any, GPM30400t379.101, GPI4304001408-101, GPM304001409.101, CP14304001407-101. GPM304001380.301, CP14304001381-301. GPM304001383-301, GPS1304001382-301, 2ea GPM304001405.101, CP14304001359.101 Brackets. MI work performed per GPX303001084.501 Rev. F 15.3.4 Completed Request Engineering Disposition: On the Engineering Ono:ellen: GPX303001084-501 traving, malty Flag Note 7 as Idioms. The requested Mange to flag rate 7 are acceptabe to engine oirg and are a moor change. Rep 2 should read: Cttaln pitch and rill measurements In the nose landing gear pay using a nverelevei an pow:non installed levelng brackets. Set pitch of entemia tray to MRE47356 Jason Gransnorn -1.00 degrees whin 11- 25 degree Fran readings taken from production installed leveling brackets. 15.4 Completed Convey Win 4704160001469.301 Rev.--. Cabinet bought from stock. Reference step 15.4 91 15.5 Waiting Comply with GPX4680001547-301 Rev.A. (Monument Amy.- Complied with GPX4680301547-301 Rev.A. (Menurrent Asay.- Baggage Cabnet PPM. MOOStahl - G450/ G550) See Wowed Etiggage Cabnet APM, MOOMAN - G450/ G550) steps belay for work pertained. (L) 15.5.1 Open VOID••• Ref Step 15.18 For wok Performed. 15.6 Waiting Comply with GPX468031549-501 Rev.B (KANDU Intl.) Complied with GPX468001549-501 Rev.B (KANDU Intl) See steps below fa work pdarned. Imp 15.6.1 Completed Yenned parts from stock, Located, and drilled (1) GPM30400t349.30l Mountrg Mate Assembly, (1) GPM304001351-301 Kandu attachment angle assembly and (I) GPM304001351 KarOu attaChinent axle assembly tO the *Matt at FS 890.-905 VA 115. --OK TO INSTALL-- 15.6.2 Completed Installed (1)GPM304001349-301 Moulting Mate Assembly, (1) GPM304001351.303 Kandu attactrnent angle assembly. and (I) GPM304001351 FarCks attachment angle to the 12,15,2017 6:210SAM Gulfstream Proprietary Information Papa 13 d;9 EFTA00796546 Work Order: 5O521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: AP Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or same Friday on Mondays) ASSOC SIMMS I Resolution IS.? Ye/slang Wormed (L) 15.8 WAND Wormed (1) 15.9 WAND Wormed (L) 15.10 15.11 MOM 40(04 (L) Waibng aPPrOyal (L) 15.12 Ye/slang Wormed (L) 15.13 Waltirg Wormed (L) 15.14 Waltirg Wormed (L) 15.14.1 15.14.2 COmOleted GPM 15.15 Waiang Wormed (L) 15.16 WAND Wormed (L) 15.17 Waltirg Wormed (L) 15.18 15.18.1 15.18.2 Waltirg a00,04 (L) Waibng Insp GPM 15.19 Waibng aPPrOyal (1) 16 KA BAND HARNESS PAIIIIICATION 16.1 In Progress 16.2 in Pr (Kir., 17 ASC 085A XM Weather Installation - (Ref. Item 8 2.3 of PrOpOSal IDs 7038248 R02) 17.1 Discusser/ aircraft at FS 890-905 WL 115 rang Bkieprot sellout ha-Orme. Al hodi performed in accordancexiM Map GPX468001549-501 Rev B COCTOV ?AIR GPX468031557-501 Rev B ( BAGGAGE CABINET - APM, MODMM INSTL GSSO) COmptv with GP% 303001139-501 Rev - (RadOrne COMPLY WITH DRAWING GPE3030C0393 REV. A (KA-BANO TAIL WIRE HARNESS) COMPLY WITH DRAWING GPE303000092 REVA (KA-BAND BAGGAGE WIRE HARNESS) COMPLY WITH DRAWING GPE303000091 REVA (KA-BAND WIRE ROUTING) COMPLY WITH DRAWING CEE370C00013 REV.— (CCCIG'IT SWITCH PANEL MOO KA.BAND) COMPLY WITH DRAWING CEE394C00014 REV. A (AUX C.B. PANEL MOD) COMPLY WITH DRAWING GPE370300026 REV. A (COCKPIT SWITCH PANEL MOD. SDK) RenXwed obsencees seat Ini; 11595C7501•1 St4:201-1425. from aircraft tor avionics Install per 6550 ARAM 25-11-02 Rev.31/17. Reinstall observers seat Ftl: 1159SCFS01-1 SN: 281-1425, after avionics install Is compacted per 6550 ARAM 25-11-02 Rev.Mar 31/17. COMPLY WITH DRAWING GPE429000032 REV.F (SCR) COMPLY WITH DRAWING CEE4290)050 REV. A (CABIN LAN ROUTER MCC) COMPLY WITH DRAWING GPE429000037 REV. A (SCR WIRE ROOTING) COMPLY WITH CE5430X063 Rev ( 415C MODS- KA BAND INSTL) Vented locations and petted (2)a/451836-3 Inserts fa 644806002351.101 Ao3le, (2)7143)836-3 Inserts ra 654805001267.101 Ao3le, (6)7143)836-3 Inserts ra GPM004001496-101 and GPM004001492.101 angles. (2) KAS1836-3 Inserts fa CE444290002-103 Maranon= Panel Asw, (2) NA51836-3 515015 for CE444290002.101 Relay Rail, aid (4) NAS1836-3 1R5015 for 1233-F-2191-10 SattOm direct Router. All work performed per CES43030053 Rev -. Located and rotated (13) CB4019G3N7SPOITe Down Any IO Cabinet for electrical wring installation. All work done per *awing CE54303C053 Rev •. COMPLY WITH DRAWING CES1 4290267 Rev -. CABIN LAN (1400) COMPLY WITH GPE303000093 COMPLY WITH GPE30300e097 In Progress ASC 065A XM Weather Installation This Service Change instals an antenna, receher, too (2) data ports and assodated wing fa the *1 satelite weather SyStem. ether a tore or an aft instatation may be selected based on aircraft cooteurabon. AMYL Mat are Provisioned for AM Installation may recmire an °mimeos review 10 compete toe 'rotation. Pnwhiccis may rod** wring, &razor*, recover, data ports or any combination of these components and are typically installed poring competition. PrereRtigteS: ASC 908 - PkneVIew Mager Operating Software System SORWare Upitite (CM Fox) Prior tot or at the time Ms A5C is ordered, operators villi be reot'red to semi., a configuration report Or toe Complied with GPX468001557-501 Rev B ( BArtrars CABINET APM, MCOMAN INSTL - GSSO) Ref Step 15.18 for work perfcemed. 12'15,7017 6:21:05AM Gel/stream Proprietary Information Pay la of 29 EFTA00796547 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: au Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status 17.2 Waibng approval (L) 17.3 MOM approval (L) 17.0 YgWrg reprove' (L) 17.5 Waltirg aCionni 0-) 17.5.1 Completed 17.5.2 Completed 17.6 Canialted 18.1 In Regress Din/pang Central Maintenance Computer (CPC). The OIC report mss be stored on the Seat PC laptop then ekcbennalM sal:miffed to Gulfstream at Albin three (3) to free (5) claw fer the DIC report rester and up to Mertymne (21) days far thecretin elegem 00110r0 Data cligr. &fenny: ThiS Senna Olarge is aspirate to aircraft Serial Mothers 5001 - siasemsent. Netts: Interior access to petrol Mis Instaletion is not ircluded in din Mt mite. Aircraft configuration, installation locate, of the system and nanny of spare wiring may moat labor hours, amount or access required ancicoulcl necesstate adOuonal engneenng. This ASC a a managed regain. Incotporaten must be coordinated through Cribb:earn Arcraft Scheaiing at 800 810-GULF (4853) a 912.965-4 78. If not sthtduled. wan donrcirre could increase sigolicently. This Service Change may only be rotated at a airstream Aerospace Wiley. CMP GSSO 970851 ASC 85A xM Weather Irestallabcri COMPLY WITH DRAWING 11595557976 REV. A (01 WEATHER) COMPLY WITH DRAWING 11595557977 REV. A ( XM WEATHER WIRE ROUTING) COMPLY WITH 11595847985.15 REV.0 (KM AMEMM INSTL.) Located and driled 11595817985 -19 doubler and two 115950479n-25 nutplate clatters . CP to install per 11595847985 Rev C draneng . Ret R5.1 pg 18 C. Installed 11595847985 -19 doubler and two 1159584798S-2S replete doublers per 11595847905 Rev C &awing . Rel Rai pg lB C. CMP 6550 316705 XII Weather Antenna - RemCwal / Installation ASC 912 and MC 123 Pbrieviae MOS Upgrade - (Ref. Item 8 2.0 of Proposal The 7035248 R02) ASC 912 sea ASC 223 Purmnew '105 us:prole MC 912: This SWAM Mange (ASC 912) Installs tne Planezew master OPeratM9 System (405) software Media Part Humber (PSI) MM7031235024. ASC 123: This Seance Change (AX 123) loan a CColOinatin Of new and existing software based on anent aircraft configuratian. Prerequisite= Sutait an APM Setbrn & Riggings loan AX 920 r PbcreView MOS Sentare Update or later; or croductem equity/wit .s the rrinmum eat leyd required. Pnce to, cr at the time the MC a entered, cpwators will be reduced to sumps/ a tOnliguration report or me Centre, Mantenance Computer ((NC). The CNC resat on be stored on the aircraft PC laptop then eleewncalN submitted to Gulfstream at Operators unto; Custom Electronic Cnedlist (ECL) malt order new software. Pince to, or at the time this MC is ordered. cdtware be cackled from the Cratan ECL Page on Concurrent Requires:net MC 912 and ASC 123 we complied with in conjunction. encomty. This Swam Cnange is apolcable to aircraft %nal tombers 5001 - 5549. 1118. a a similar clone, will installed dump Cabal phase manufacturing on arcrai knd nolterS 5550 and Stbsequent Metes: Aircraft that do not meet the prerequisite minimum level for modification may Wire drawing 11595857083 to meet the requirements of AX 107 and AX 910. lhis drawing may Only De used (Women& with AX 123 and MC 912. Aircraft utilang drawing 115566570n to meet the rereCIVSite momurn regulrementS Of AX 107 and MC 910 are port M a managed Rogan co ducted try Product Support Program Management (PSPM). ResoludOn COMPLIED WITH 11595807985:15 REV.0 (XM ANTENWt D1511..) SEE STEPS BELOW FOR WORK PERFORMED. REFERENCE CMP 316705 (STEP 17.6) COMPLIED WITH CMP G550 316705 /74 Weather Antenna Remora'? Imtalation 18.2 ComMeted CMP 6550 979120 ASC 912 Panennew Master CveraUng COMPLIED WITH CMP G550979120 PSC 912 mantenew Plaster Operating System Software Mode System Software Update 18.3 Completed CMP 6550 97/230 PSC 123 PkneView MiC4NCS COMPLIED yY1711 CMP GSSO 971230 ASC 123 PlaneVIew Averics Enhancement 12115a017 6:21:05AM Gultslreaen Propriety Infatuation Parc IS on .14 EFTA00796548 Work Order: 50521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown Squawks•. MI Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) I Made I Status 18.9 Completed 18.5 Completed 18.6 Completed 18.7 Completed 18.8 Completed 18.9 Completed 18.10 Completed 18.11 Completed 18.12 Completed 18.13 Completed 39 19.1 Open 19.1.1 In AVI fElearical tabor OW Progress 19.12 Open INT Sheet metal Labor Only 19.13 In Wood Labor Only (270 ) Progress Deducted 270 tours from the anginal 1897 bass for vender supplied boa (SOS) 19.1.4 Open INT Finish and Faint Labor Cite TOtal MurS 405 Outside tabor to 11/27 to 12/6 197 Ms Discrepancy Enhancemere CMP GSSO 319010 Ilaneywel Ftaneviert Omrabcnal Software MaSter OPeraldr9 System TOP Level System (VMite Disk) ••'VOID•" CMP 6550319015 Honeywell Planeview, Confmration (Math Optics) Software Top Level System (Yeilow EXPO CMP 6550 319017 Ham-vent Plasmas', Aircraft Options Data Sofbwre Medd (White Disk) CMP 6550 319020 GulfStream„ Electronic Cnedtlist Seftware (Ma* Disk) OAP GSSO 319025 Gulfstream, Setting / Pigging Software (Grey Disk) OAP 6550 319040CW1500m, COmmuniCatOnS Management Ramon Airline modinatile Informatics, (AMI) Software (Orange Disk) OAP G550 319044 GulfStream, Programmatic CA5 Messages Software (Turquoise Disk) CMP G550 319030 Gulfstrearm, Central Maintenance Compute' Loadable Diagnostic Infortnaton Software (Blade D190 CMP G550 319110 ATC Data Base Disc update ConialY with GYSP.GO:t.7 32 RTS Chtdcocc Prccedure RIIVIMMit Woodwork • (Bet Item A LI 44 Ripon( ID* 7039407 R00) Revenece wCcdµ•k The Csittra) sCritter COON componerns null be removed Boni the arcraft and stripped of all veneer surfaces, ha-doccd caps. and twang. Al substrate wit be cleaned and pepped far aPOiCatlan Of new seledeS sTreac (III 170718.2 Qtr Sleet Dim) non correspordng Ardwcod caps and naPng. Modficatcns a repam to any substrate rroterial or StFUCtital Ihare/n0te will be evaluated and aosiesso oil a foe and material lasts. Al the existing latches null be cleaned and teemed. New hardware, if requested, MI be addressed on a tine and matenak basis. New CUSIOTTral Selected Veneer will be appled to Me caldera substrates. The new veneer null be finished with Gulfsbearn standard 19411 clear coat finish and polshed to a Predetermined luster. Al applicable eternal surfaces will be cleaned and retaned In misting oorrilbOn- Painting Cr recovemp 0' the internal surfaces wit be addressed on a toe and materials basis. Inlays of any hoe sods as wood, metal, or stone inlays are not included in this proposal. Exiling inlays mil be evaluated on a casePtcase basis and addressed on a lane and materials bass. Bum certification a predcated upon the aiming substrates meeting al the FM flamrnablity requirements. Gulfstream net responstple lot any exisere materials meeting bun reoVienxnts. The steamed dims, tarok, and cabinetry •sill be reassembled and Staled in aircraft. All adjustmentsIAA be made to ensure cones fit aid function. Equipment relocation is not part of dos proposal and wil be addressed mettle and inderit basis. In SEE APPENDIX FOR ADDMONAL INFO "' RelaWMOn COMPLIED WITH CMP GSM 319010 licreovell ManeviewOptratitnal Software Master Operating System -Top Level SYSttal (Mate Disk) Phi OFF: B37031236-00323 Pre ON: B37031236-0032S SN OFF: 35582318 SN ON: 356269E2 "NOID'••ENTERED IN ERROR SEE ITEM 18.6 COMPLIED WTIN CMP GSM 319017 Nommen Pbneview, Arendt Options Data Software - Mpla Mfrs DM) FN OFF: 0060002648.50047 FN ON: De6D002648.50078 Sft OFF: 5173 Sri Ott: 5173 COMPLIED WITH CMP G550 319020 CullStreany Electronic Owddist Software (Purple Disk) COMPLIED WITH Clip G550 319025 Gulfstrearn, Seder; / Rigging Software (Grey Dials) COMPLIED WITH CMP G550 319040 601st:ream, COMMuniCabOOS Management FunCtitin Aldine MCKIFIable Intoma0or soil ware (Orange Dip:) Pre OFF: 69001791.503 FN OM. 69001791.505 Sri OFF: GCC 20AUG2013 SN ON: GOD 04111.2017 COMPLIED WITH CMP G550 319044 GullStreark Prog-ammade CAS messages Sertwart (Tweeds. Disk) COMPLIED WM' OW 6550 319030 Gulfstream, Central Martenance Computer Loadable Diagnostic Information Software (Cemb Disk) Pre OFF: GV_911 00323 01_02270 Fel ON: GV 912_00325 03_052317 SN OFF: 5173 SN Ott 5173 COMPLIED WITH CMP G550 319110 ATC Data Base Dec • Update Complied with GVSP-GER-7132 RTS theckout Procedure Reference paper copy Older 9A) line signs kr week Performed. IMF 12,11.2017 6:31:05 AM Gulfstreom Proprietary Infonnedon giv EFTA00796549 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status -Cl Resolution 0.113Cle Leber for 12(4 to 12(10 208 In 19.15 In INT Simon (R&R) Labor Only Progress 19.1.6 In Insoectian Labor 19.1.7 Progress Open FlarrnsablitY/ Placards Labor CetT 19.18 In Wood Shop Labor to Strip Exisarg Veneer. Progress 19.1.8.1 In Strip Veneer - Rll and LH 680 Ittlkbeads and Door. Complied with Leber to strip %/mew from the RN and LH 680 bulkheads and doze. 19.1.8.2 Progress In Strip Veneer • AFT LAV MOW and Shroud. 19.1.8.3 Progress In Sim Veneer - AFT Lav Varety 19.1.8.4 Progress In WO Veneer • AFT Ul Closet. 19.1.8.5 Progress In Situ Veneer -AFT RH Ooset. 19.1.8.6 Progress In WO Veneer • AFT LH Gal/W. 19.1.8.7 Progress In Situ Veneer -AFT RH Gabel Annex. 19.1.8.8 Progress In Strip Veneer - 4 Divan End Cabinets. 19.1.8.9 Progress In WO Veneer • Cabin Ledges. 19.1.8.10 Progress Open Strip Veneer - Console Tables. 19.1.8.11 Open Strip Veneer - FWD Podcet Door. 19.1.8.12 In StrO Veneer • FWD RH and LH Cabin Bulkheads. 19.1.8.13 Progress Open Strip Veneer - PSU Hardrals. 19.1.8.14 Open Strip Veneer- FWD Crew Refreth Cabinet 19.1.8.15 often SUO Veneer • FWD RH Lay. 19.1.8.16 Open Strip Veneer - REM and LEER prods. 19.1.8.17 In Strip Veneer - AC0.04 Door. 19.1.8.18 Progress In Strip Veneer Entry Panels (2) Strip Veneer - AFT LAV Doer. 19.1.8.19 Progress In 19.1.8.20 Progress Open RIO Veneer • FWD Lay Door. 19.1.8.21 In Strip Veneer - Macaene Radcs. 19.1.9 Progress open Wood Shop Labor to Reveneer Carnets. 19.1.9.1 In Labor to Veneer LH and RH 680 Bulkheads and Door. 19.1.9.2 Progress In Labor to Veneer AFT LAY Niche and Wood. 19.1.9.3 Progress In Later to Veneer - AFT Lay Vanity. 19.1.9.4 Progress In Labor to Veneer An LH Closet 19.1.9.5 Progress In Latta to Veneer - AFT RH Cb92t. 19.1.9.6 Progress In Labor to Veneer An LH Geer. 19.1.9.7 Progress In Later to Veneer -WT RH Galley Anna. 19.1.9.8 Progress In Labor to Veneer a Conn End Cabinets. 19.1.9.9 Progress In Later to Vertu- Cabin Ledges. 19.1.9.10 Progress In Ube to Veneer FWD Pocket Door. 19.1.9.11 Progress Open Later to Veneer - FWD UI and RH kin heads. 19.1.9.12 Open Labor to Veneer Far Hand Rals 19.1.9.13 Open Labor to Veneer FWD Crew RiafreS11Catina. 19.1.9.14 Open Latent Veneer FWD RN Lay. 19.1.9.15 Open Latta to Veneer LEER and liter Panels. 19.1.9.16 ORO Labor to Veneer - AeOue9t Doors. 19.1.9.17 Open Later to Vertu -Entry Et/Itheads (2) II IS 2017 6 21 OS AM Gut/stream Proprietary Information Pas< 170120 EFTA00796550 Work Order: 5C521661 AC: 5173 STPI: Charles Thomas SCC: Julian Brown Squawks: Ali Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status 19.1.9.18 Open 19.1.9.19 Open 19.1.9.20 Open 19.1.9.21 Open 19.1.10 Open 19.1.10.1 Open 19.1.10.2 Open 19.1.10.3 Open 19.1.10.4 Open 19.1.10.5 Open 19.1.10.6 Onen 19.1.10.7 Open 19.1.10.8 Open 19.1.10.9 Open 19.1.10.10 Open 19.1.10.11 Open 19.1.10.12 Open 19.1.10.13 Open 19.1.10.14 Open 19.1.10.15 Open 19.1.10.16 Open 19.1.10.17 Open 19.1.10.18 Open 19.1.11 Waibng Into 19.2 Wand aPprowd (1) 19.3 YMOng aPprowd (1) 19.0 19.5 WMOng a— (L) Wisibng a— g.) 19.6 Waibng aPProval D.) 19.7 Waltn9 aPProval (1) 19.8 Waltn9 aPProval (L) 19.9 19.10 Waltn9 a— (1) Waibng (1) 19.11 Waiting aPProwd (l.) 19.12 Waltn9 aPProval (L) 19.13 Waltn9 aPProval (L) 19.10 19.15 waiting a— (L) Waibng a— (L) 19.16 Waiting aPProval (l.) 19.17 YMOng aPProwd (1) 19.18 Waltn9 Discrepancy Labor to Veneer AEI' Lav Door. Labor to Veneer FWD Lav Door. Labor to Veneer Cadge Tables. IOW to Veneer Magazine RaCkS. Wood Shop Labor to Assemble Labatt. Late- to Assemble Ul as RH 680 Bulkheads and Dear. Labor to Assent,* aFt tav Niche and Shroud. Labor to Assemble AF7 Lav Vanity. Labor to Assemble AF7 LII Upset Labor to Assemble - AFT PH Closet. Labor to Assent,* - AFT U. Gatey. Labor to Assemble AF7 AH Gale, Amex. Labor to Assemble 4 Divan End Cabinets. WØ to Anent,* - Can Ledges. WØ to Anent,* - Consde tatreS. Labor to Assemble FWD Parkro Door. Lass to Assemble - FWD UI and kW Can Bullheads. WØ to Assemble - FWD Clew Rc€lesh Cabinet Late- to Assemble - FWD Pk. Lev. Late- to Assemble - Leet and Reef Panels. WØ to Anent,* ACOuSIJC DOM. WØ to Assemble - aFr Lav Door. Labor to Assemble - FWD Lav Door. •••Entered in Ester FlanYnablIty Data. Strip and Rewneer LH and RH 450 Bulkheads and Door. Slap and Revmeer AFT Lav Nerie and Shroud. WO and Revmeer AFT Lav Vanity. Stnp ard Rovmoer AFT LII Omet Strip ard Ravmoer AFT RH Closet Sup and Revmeer AFT tu Galley Assy. Slao arid RewRer AFT PH Gate, Amex ASSY. WO and Re veer 4 DWan End Cabinets. Strip and Ramer Calm Ledges. Stnp and Ramer Pocket Door. Strip ard Reueneer FWD UI and RH Buldvarls. WO and Re•wRer PSJ HaneallS. SDI) and Re veer RIM Gen Refresh Cabinet. Strip ard Reveneer FWD RH Lav Assy. Sim arid Rorroer LEER and PEER Panels. SD° and Rewineer Acou60c Doors. SD° and Re•wRer Entry %kneads Resolution 12, iszei, 4;2 es Am Gulfstream Proprietary Information her Isom EFTA00796551 Work Order: 50521661 AC: 5173 SIN: Chart Thomas SCC: Julian Broym Squat: Ali yellow = Newly Allied Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Nam I SIAM 19.19 19.20 Wormer (L) agOroval Waibng agOroval (1) 19.21 Waibng agOroval 0-) 19.22 Wailing etyma (U 19.23 Waiting ran (-) 20 20.1 OPen 20.1.1 20.12 20.1.3 20.1.4 Open Open Open Open 20.1.5 Open 20.1.6 Open 20.1.7 Open 20.1)3 Open 20.1.9 Open 20.1.10 Open 20.1.11 Open 20.1.12 Open 20.1.13 Open 20.1.19 Open 20.1.15 open 20.1.16 Open 20.1.17 Open 20.1.19 Open 20.1.19 Open 20.1.20 open 20.121 Open Disalpanor Stop and ReKneer 3 Console Tables Strp and Renmeer AFT lay Door. Dap and ftemneer FWD Lay Door. Srop and ftemneer Magaare racks Sett one rev Mm closet, credenza and Mt ow, rehash cabinet to SAPS fa stripend revenea. Pictures taken for documentation. Matra= Change a COrreee with registratiOn Change SS CUMed In RECCT*115 Rev. 12. Registration charge to 14212X. Customer requests that the Guirstream ODA issue a replacement standard amen thries certificate Are to registrat100 creme. Provide to the ODA the fOlIMIng items: A. A cope of the Ai:Mader cover Meet with current haws and Endings. 8. Standard AhvortinenCertnate, FM Form 8100-2. C. Ceroncate of MOM Regstraticn, AC Form 80563. Requre a written ongrol statement signed by the registered awe or certficate °Fedor to requat a redaoement amortniness certMcate. The request Shall inckede the resist:awn number. Serial nunDer, make and model of the aircraft as well as the reason for the request. Renew the arcreA reostes and nspect the aircraft to ensure me request Is Justine, and the await is eligible for me cerdicanon requested. Records review consists of ventmauan that there are r preen mareenance due aCbCetS or an:earthman drectwes. Arcraft macaw °masts of a data date and registration marking marrination, wen a visual rose./ or me aircraft for 01,4005 COMitens impacting aircraft safety. Verily current arro-aft registration, reference 14 CFR 07: Nara copy Regabation AC form 8050.3 for new registration rumba or Assignment of Spxial Registration Nuirbs AC tom 8050-64 drd had omr of old Aerobia," AC ram 8050.3 8050.3 or Deaier Rept:Oaten AC Form 80504. Verify new registration number is treatedon the await. Rd: 14CFR 45. 23, 45.25, 45.29 & 45.33. Verify aircraft ID Mee instdlaten. Rd: 19 CFR Part 45. FM form 81C0-2 Mote for new registration number by arfsvean ODA. If the customer defers Gulfstream COA issuance of a replacement anwethiness certificate, a Condo- scurink will be Signed as ridene0 by the eugromar. Rrel : 14 CFR 91.203 (a) (1)1. Re-strap/ Re-program transponders to new registration. (Frac:Menders with Mode 5) Re4Papfite Program SELCAL CO new code F Ovolern0 changes. Cornmenn SATCOM for new moat., ce Re•Strap SDU foe new registration number Change. Reconnect° Magnastar, Nrcell, & Kir systems. Centime MIS. Now tnstalatices or registration member change. Re-strop via Laptop. Install new regstraton number daroardS in cockpit. Insoles' new) SEI.CAl. number in cockpit. Change logo on Amboy. f Catinview, if ownership changes. Re-strap or re-program ELT's (90614112)n aircraft (As rectired to new registration and I or Man Cede). Reconfigwe highS Data Units or 8Mi Reconfigwe Display Controlers Tail number f SELCAL WilrY Paper registration of ELT's OMNI-M( If Instated In life molt). Reconfigwe the Enhanced Flight Identifialion Code to the current rept:Paten 20.122 Open Wain a copy of me feart Certricate of aawarthiness. Foreign ArnatIlifteSS Certificates, all Foreign RegiSbatkin Documents and archeee with the wrorkader. ReedudOn 12,15-2017 6:11:05 AM Cul/stream Proprietary Informalion Pak< ION 29 EFTA00796552 Work Order: SC521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) ASSOC Shuts Discrepancy Resolution 21 21.1 waiting aPProwal 12 Month OSP Taste (Exhibit]) -(Rex. Stan C 1.1 of Proposal IOU 7039702 ROO) AcconVIM 12 Month CMP TaSkS (Exhibit 1) Notes: (1) Cerrection et dacreparcies a rot included in the quoted price. matenais/ Outside Senices will be tilled as rectired. 21.2 Open CMP 6550 237004 COMM Voice RePorder-Operational 21.3 Open Test CMP 6550 240121 Emer9OXY Battery Power System (Left) • OPerational Test 21.4 Open CMP G550 240122 Emergency Battery Power System (Right) - Operaborol Test 21.5 OPen 04P 6550 240123 Emergency Battery Power System (Forward). Operational Test 21.6 Open CMP G550 240124 Emergency Battery Power System (M). Operational Test 21.7 Completed 04P 6550 243011 L Man Battery - Capacity Oxck COMPLIED WITH CMP G550 243011 L Main Battery CapaOty Rrttk 21.8 Completed 04P 6550 243012 R man Battey 00atitY Check COMPLIED WITH CMP G550 243012 R Main Battery • CaPaOty Check 21.9 In CMP 6550 256043 Few Rid Kit (No. 1) - Details Inspection Progress 21.10 Completed 04P 6550 256071 Flashlight (Ho. 1) - Opeabonal Ore* COMPLIED WITH 04P G550 256071 Flashliga (No. I) - Operational Ova 21.11 Completed CMP G550 256072 FlaaNght (No. 2) -Operational Test COMPLIED Willi 04P G5S0 256072 RasNight Mo. - Opera:mai Test 21.12 Completed CMP G550 256073 FlaaNght (Ho. 3) -Operational Test COMPLIED Mill 04P 6550 256073 RasNight Mo. - Opera:mai Test 21.13 Completed "'DELETE"' OW 6550 256161 Mato,' Mt • Detailed Medical kit not installed on this airaeit per ncombn thariVig 60528000312 Rev B. Inspection Customer SVnature: Date: (Oatorrer signature on File) 21.14 Completed •••DELETE••• Ceelo GS50 256162 medeal Kit lime Limited Medical kit me instated on this aircraft per Amply, drawing 60528000312 Rev B. SuPPies - Discard Customer Signature: Date: (customer signature on File) 21.15 Open CMP 6550 256201 life Vest(s) - Detailed Inspection 21.16 Completed CMP 6550 256202 Lire Raft(s) (No. I) - Detaled Inspection COMPLIED WITH CMP G550 256202 Lire Ralt(s) (NO. 1)- Detailed Inspection 21.17 Completed CMP G550 256203 Lire Raft(s) (No. 2) - Detaled Inspection COMPLIED WITH CMP G550 256203 Lire Ralt(s) (NO. 2)- Detailed Inspeaion 21.18 Completed CMP GSSO 256282 Perswol Breathro Equipment (1b. 1) - COMPLIED MITI CMP G5S0 256282 Procne! Breathing Equipment (No. 1) - Detailed Inspection Details Inspection 21.19 Completed 04P 6550 256306 Enk. yawV Locates' TranstaRter • coetwooat Test (FAR 91.207) COMPLIED WITH CMP G5502563% Porm yaxm Locator Transmitter • Operational Test (MR 91.207) 21.20 Completed CMP GSSO 262560 Trash Receptacle Enckaure (Mt COMPLIED WITH 04P G5S0 262560 Trash Receptacle Enclostre (Mt Lavatory). Detaled Inspection Lavatcry) - Detailed Impaction 21.21 Completed 04P 6550 262561 Trash ReCeptade Enclosure (Forward COMPLIED WITH CMP G550 262561 Trash Reavtacie EnCbSue (Forward Lavatory) Cleated Inspection Lavatory) Detailed InSpeCtiOn 21.22 Completed CMP GSSO 262562 Trash Receptacle Enckaure (Mt Galley / COMPLIED MITI CMP G5S0 262562 Trash Receptacle Ercbstre (Mt Galey 1 Arrtex)- Detailed Inspection Annex) - Detailed Inspection 21.23 Completed 04P G550 262583 Tog', Receptacle Fre Ec009u1Sher COMPLIED WITH 04P G550 262583 Trash Receptacle Flre Extinguisher NOMM (Nt Lavatory) - Detailed InSPECOn Nozzles (Mt Lavatory) - Detaled Inspection 21.24 Completed CMP G550 262584 Trash Receptacle Fre Extinguaher COMPLIED MITI CMP 6550 262584 Trash Receptacle Fire ExEnguistier Nozzles (Ponverd Lavatcry) - Details NOVI% (F0mard Lavatory) - Detaled InSOPotitin Inspection 21.25 Completed 04P G550 262585 TraSh Receptacle Fee Meingualler COMPLIED WITH CMP G550 262585 TraSh Receptacle Flre ExOnguaber NOMM (AR Galley 1 Annex). Detaled Nozzles (Aft Galley/ Annex) - Detailed Inspection Inspection 21.26 Completed CMP G550 262601 Portable Haim Fire Extingusher COMPLIED MITI CMP 6550 262601 Portable Ibbn Fre Extinguaher (CoMpt) - Inspection (Coca t) • Inspection 21.27 Completed 04P G550 262602 POrtatle Hato Fire Elogrigtisher COMPLIED WITH 04P G550 262602 Portable Haion Fre Eiainguisher (Cockpit) • Weight Check (Ccdtpt) - Weight Check Scab: 566768 Cal. Due: 04/18 21.28 corona 04P 6550 262621 POrtatle HOW Fire Evlingtssner (Nt COMPLIED 1VITH 04P G550 262621 Portable Haion Fre Eiainguisher (AR Ca0in) • Inspection Cable)- Inspection 21.29 Completed 04P 6550 262622 POrtatle HOW Fire EvlingLisner (ket COMPLIED 1VITH CMP G550 262622 Portable Haion Fre Extinguaher (AR Ca0in) • Weight Check Ca0in) - Weir Check Scab: 566768 Cat. Dom: 09118 21.30 Convicted 04P G550 262631 Portable HOW Fire EvAingtssner (An COMPLIED WITH 04P G550 262631 Portable Halm Fre Extinguisher (AR Lavatory) • Ir6pecbon Lavatory) - Ir6fecan 21.31 Completed CMP G550 262632 Portable Helen Fire Extingusher MA COMPLIED WITS CMP 6550 262632 Portable Ilabn Fre Extingulaher (AR Leveed") - Weight Check Lavatory) WeWst alwk Scale: 566768 Cal. Due: 04118 21.32 Completed CMP G550 312003 BATTERY, PILOT 000( COMPLIED WITH CMP 6550 312003 BATTERY, PILOT CLOCK 21.33 Completed CMP G550 312004 BATTERY, COPILOT 000( COMPLIED WITS CMP 6550 31200E BATTERY, COPILOT CLOCK 12 IS2017 67i.us AM Gulfstream Proprietary Information Pass 20v(20 EFTA00796553 Work Order: K521661 AC: 5173 STM: Chart Thomas BCC: Julian Brown Squawks: MI Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) &Hoc Stains Dlearpancy Resolution 21.34 Completed CMP GM 321803 Mein Lading Gear and Doors (Left) - COMPLIED WITH 04P G550 321803 Man Landng Gar and Doors (LeR) - Zonal Ira/motion Zonal Inspection 21.35 COMleted CMP '5550 321804 'On Landing Gear and Dods (ROO • COMPLIED WITH 01P 6550 321804 Man Landng Gear and Deers (Right) • Zonal Interaction Zonal Insprxtion 21.36 Completed CMP GSSO 322802 More Lending Gear and Doors - 2enal COMPLIED WITH 04P GS50 322801 Nose Landing Gear and Doors - Zonal Inspection Inspectian 21.37 Open 04P 6550 335020 Ca Emergency Lighting C94M0308l Test 21.38 Completed CMP G550 353002 Portable Oxygen Bottle and Mink COMPLIED WITH CMP GSSO 353002 Portable Oxygen Battle and Mask Assendy (No. 1) - Detakd Inapt-ban Assembly (No. 1). Detaled Inspection 2139 Completed CMP G550 382003 Water St eilizer Fifer DISC WO COMPLIED WITH CMP G550 382003 Water Stoker Filer • Discard 21.90 Compkted CMP GISO 521010 Mn Entrance Door Lubmeitim COMPLIED WITH CMP GSSO 521010 Man Entrance Door - Lubrication 21.91 Compkted CMP 6550 MOOS Baggage Compartment Door - COMPLIED WITH CMP 6550 523005 Baggage Compartment Door - Lubmabon LoOkatIon 21.42 Completed C/V 6550 525001 Ata PreSSure BUldrad DOW Seal • COMPLIED WITH CMP 6550 525001 And MOM.° Eull.baad Door Seal - Detailed Imp Waled Imp 21.93 Completed CMP G550531015 Nose Gear Wheel Wdl FS - F5119 - anal Inspection COMPLIED WITH CMP GSSO 531015 Nose Gear Wiled Well FS 91- FS 119 -Zonal kopeck° 21.44 Completed 04P 6550 531045 Main Gear VMS weils FS 576 • FS 632 COMPLIEDWITH CMP G550 531045 Man Gear Wheel WelS FS 576 - PS 632 (Left) • Zonal InSPeenan (Left) - Zonal Inspection 2165 Completed 04P 6550 531096 Mein Gear Whed Wells FS 576 - FS 632 COMPLIED WITH CMP GSSO 531046 Man Gear Wheel Wes FS 576 - FS 632 (Right) - Lanai Inspection (Right) • anal MSpeCtKrn 21.96 Candle:led CMP G550 531097 Mein Gear Wined Weds FS 576 - FS 632 COMPLIED WITH CMP GSSO 531047 May. Gear Silted Wets FS 576 - FS 632 (Care Panel Drain Holes). (Erhdiced) (Cave Pand Drain Holes). (Enhanced) 2asal Inspection Zed Inspectim 21.47 COmPkted 04P G550 531098 Kan Gear Wheel Weds FS 576 • FS 632 COMPLIED WITH CMP 6550 531048 Man Gear Wheel Weis FS 576 - FS 632 (Vilang Harness) (EnhanCed)20nal (Wiring Harness) • (Enhance:1)2one' InSpeCOOn Inspection 2168 Weans approval ••• REUTED CODES • Complied with related codes (1) 21.49 Completed CMP 6550 243001 akin battery (Left) • Removal / COMPLIED WITH 04P 6550 243001 Man Battery (Let) - Removal/ Odle/anon Installabon Pf4 OFF & ON: 11595CAVS19-1 5N OFF: 090520C069DCf 5N ON: 0905200106763 21.50 Compkted CMP GSSO 243015 Men Bandy Operatimal Mack COMPLIED WITH 04P GSM) 243015 Man Battery- Operational Oiedc 21.51 Completed 04P 6550 243002 Main Battery (Right) • Removal/ COMPLIED WITH CMP 6550 243002 Man Battery (ROO Removal l irstaitation Installation Pfr OFF & ON: 1159SCAY519-1 SN OFF: 09352001067W SN ON: 090520006900E 21.52 Open 04P 6550 256041 Fret M KR (N3. 1) • Removal Installation 21.53 Careileted "NOW' i•CMP G550 256061 Fkablight (No. 1) •••VOIDn • Not Removed kom AroraR 21.54 Completed iV0117"104P 6550 256062 FaShlight (NO. 2) • 'NINO"' Not Removed Ren Medal% 21.55 Completed i'N0113"104P G550 256063 FaShIght (NO. 3) • "VOID", Not Removed Rom Medal% 21.56 Waking approval CMP G550 256160 Heckel Kit (I) 21.57 Waitng approval CMP G550 256260 Ufe Raft (No. I) (1) 21.58 Waitng approval CMP G550 256261 Ufe Rail (NO. 2) (L) 21.59 Completed CMP G550 256281 Retake Bleating Equipment (No 1) - COMPLIED WITH CMP CZ50 256281 Probtttnre Breathrg Equipment (No. 1) • RemOval Installation ReMOral Instated:A 21.60 Completed alp GEE° 256301 Emergency tacata Trarernitter - COMPLIED WITH CMP 6550 256301 Ernergency Locator Transmitter - Removal! Installation Removal/ Instalation 21.61 Completed 04P G55:0 256311 Emergency Locate TraMmitter • COMPLIED WITH CMP G550 256311 Emergency Locator TOR:Mitt& • Operational <Tack Operational Check 21.62 Completed CMP GSSO 262600 Portable Halon Are Eilinmisher COMPLIED WITH CMP 6550 262600 Portable Ilabn Fre Edingloher (Coded) - Remcnal / Installation (Cockpit) - Removal / Instalation 21.63 Completed CMP 6550 262630 Portable Mabel Rie Extinguisher (PA COMPLIED WITH CMP G550 262630 Portable MOO Re ORIOSIAllet (AR Lavatory) • Removal / Installation Lavatory) • Removal/ Installation 21.64 Completed CMP GSSO 353001 Bottle, Portable Oxygen (No 1) COMPLIED WITH CMP GSSO 353001 Borne, Portable Oxygen (No. 1) 21.65 Completed 04P 6550 38)039 WATER STERILIZER COMPLIED WITH CMP t3550 381039 WATER STERILIZER 21.66 ORO 04P 6550 381029 POTABLE WATER TEST 2167 Corroted CMP G559 82002 Water Sterikno f Remažel COMPLIED WITH CMP G550 382001 Water Stailxer Fier - Removal / Installation 22 Olserepaneles related to 12 Month CMP Tasks 23.1 (Exhibit 1) - (Ref. Item C 1.1 of Proposal ID' 7039702 ROO) Miscellaneous 04P Tasks (Exhibit 3) - (Ref. Item C 1.30f PrOpOsal IDs 7039702 ROO) Wallkg MC ',nosh Mdcelarvous CMP Tasks (Evhbt awrovel Notes: 12,15.0017 6:21:05AM Gulfstroam Proprietary Information Pose 214:411 EFTA00796554 Work Order: SC521661 AC: 5173 Mt Chart Thomas SCC: Julian &Win Swamis: AP Yelloiv = Newly Added 163,174. Green = Charged Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc SIII Tims Dbaipancy ResoMion 04 Ocrectkm ei disreparcies is not included in thequoted eke. MattilalSiOutelde 5eMeaS w0 be tilled as rebrared. 23.2 Carpeted 04P 6550 256019 EVAS SyStem (Left) Pertidle IMped1On COMPLIED WITH OW 6550 256019 EVAS System (Lett) • Periodic [lisped*, 23.3 Completed G550 256020 EVAS System (Right) -Periodic COMPLIED WITH 04P GSSO 256020 EVAS System (Rr) - Periodic Inspection Inspection 23.4 Cemp/ated 04P 6550 256404 Dern:Oats Battery towel Cheek COMPLIED WITH OW 6550 256404 DelltnItate Battery • !Med / Check 23.5 COmMeted 04P 6550 256407 Deal:Oats Beebe* Pads • Inspection COMPLIED WITH OW G550 256407 Debtrilgte AMC*? PUN • InSpeeliOn 23.6 Completed CMP 6550 161919 Baggage Compartmmt Below Floor COMPLIED WITH OW 6550 261919 Baggage Compartment Below Flow Overheat Thenni Svitch - rep:banal Test Pretreat Thermal Amid, - Functional Test 23.7 CenCletel CMP 6550 262624 Portable Hake Fire Extinguisher (Mt COMPLIED WITH 04P G550 262624 Portable Hales Fre Estingubrier (Art Ca0in) • Anal Prase ReStOre Cabin) • Frei Pear Restore 23.8 Competed CMP 6550 262626 Portable Hake Are Extingusher (Mt COMPLIED WITH OW 6550 262626 Portable Ibbn Fre Extinguesher (AR Cabin) - Yeus Inspecbcn Ca0in) • VisuP Inspection 23.9 COS CMP 6550 262605 Portable Hokin Fire Extingtisher COMPLIED WITH 04P G550 262605 Portable Han Fre EMinguisner (Cockpit). Visual Inspection (Cod pit) - those Inspection 23.10 Competed CMP G550 262696 Portable Hake Are Eeingusher (Mt lavatery) VIPS lns0ecvon COMPLIED WITH 04P 6550 262646 Portable Ibbn Fre Extirewsher (Aft Lavatory) - Vaud Inspection 23.11 Competed OP 6550 274202 HOMOOtal Roblin, Actuator - COMPLIED WITH 04P G550 274202 Holiontal 50t4lber Actuatot • Lubrication Lubrication 21.12 Complete CMP 6550 282651 Mon Fuel Boost Pump (Left) - Fuel Leak COMPLIED WITH 04P G550282651 Man Fuel Boost Pump (LA) - Fuel Leak Check Check TW 5511069 Dee Cue 013/18 23.13 Completed 04P 6550 282652 Mna Fuel Boost Pump (Right) - Fuel Leek are* COMPLIED WITH OW 6550 282652 Man Fuel Boost Pump (Right) • Fuel LearCheck TW 5511069 Date Cue 013/18 23.14 Completed 01P 6550 282653 Alternate Fuel Boost Pump (Left) Fuel COMPLIED WITH 04P G550 282653 Ntemate Fuel Boost Pump (Lee) • Fuel Leak Check Leak Ctiedr 1W 558069 Date Cue 06/18 23.15 Completed OP 6550 282654 Animate Fuel Boost Pttnp (Right) Fuel COMPLIED WITH OP G550 282654 Nternate Fuel Boost Pump (Right) - Fuel Leak Check Leak Clerk TW 5511069 Date Cue 013/18 23.16 Open OP 6550 322004 Nose Landing Gear. lubrication 23.17 Completed CMP 6550 323012 Landing Gear Emergency Externem COMPLIED WITH 04P GS50 323012 Landing Gear Emergency Extrusion Ntrogen Now-clown Bottle (Right) - Nitrogen BlenvPwrin Bonk (Right) - (INdrostatic) Functional Test (11ydrostabc) Functional Test 23.113 Completed 04P 6550 323911 Larding Gear EnteigenCyExterdian COMPLIED WITH 04P G550 323911 Landing Gear Emergency Extern/on Slowdown Bottle • General 'visual Inspection BliwiteAn Belk- General Visual Inspection 23.19 Completed CMP G550 135006 Ernergexy Flocepath raring Battery COMPLIED WITH 04P G550 335006 Emergency /towpath Lighting Battery Pack (Deep Cycle) No. 1 - Functional Test Pack (Deep Cyde) NO. 1 Functional TeSt (Brute) (Duce) 23.20 Completed 04P Gm 335007 Emergency FloorParn klibblig Battery COMPLIED WITH OP G550 335007 Emergent), IROXIMM WAN Battery Po* (Deep WO No. 2 • Functional Ten Pack (DmP Cyde) No. 2 - Functional Test (Dux) (Bruce) 23.21 Completed CMP 6550 135008 Emergency Horvath Lightng Battery COMPLIED WITH 04P GSM 335003 Emery:my Flocrpath Lighting Battery Pack (Deep 000 Na 3 - Functional Test Pack (Deep Cede) No. 3 Functional TeSt (Bruce) (Bruce) 23.22 Completed 04P 6550 351013 Oxygen Mask! Regulator (Omens) • COMPLIED WITH OP 6550 351013 Oxygen Mask! Regulator (Observer) • Restore Restore 23.23 Completed CMP GSSO 351112 Crew Oxygen Mask and Regatta COMPLIED WITH 04P GS50 351112 Crew Oxygen Mask and Regulate (Observer) - Detailed Inspection (Observer)- Deleted Inspector 23.24 Completed 6550 351212 Passenger Oxygen Bottle (No. 2) - COMPLIED WITH OW 6550 151212 Passenger Oxygen Bottle (No. 2) • (Ilydrostabc) Functional Test (Hvdrostatx) Anctional Test 23.25 °MOHO] 04P 6550 353004 Portable Ongen Bede N3. 1 • COMPLIED WITH ChIP 6550 353004 Portable Oxygen Bottle No. 1 • Operatlonal Test Operational Test 23.26 Completed CMP G5S0 521007 Men Cebn Door Locks - Inspection COMPLIED WITH 04P 6550 521007 Ilan Cabin Door Locks - Inspection 23.27 Completed CMP 6550 551109 Ibroontal Stabbser Rub Blocks - General COMPLIED WITH 04P GS50 5511091brierreal Statikeer Rub Blocks - Genera Maki Inspection Visual Inspection 23.26 Completed CMP 6550 551110 Margate Stabillter Rub BROS • COMPLIED WITH OW G550 551110 Horizon al stataaer Rub Blocks • A81300.11 Test Ftretronal Tat 23.29 Completed CMP GSSO 551111 Elevator Upper Sabi- Deeded COMPLIED WITH OW GSSO 551111 Elevate.. Upper Surface - Delisted inspection IASI:radian 23.30 Competed 04P 6550 783013 Must Reverser Ground Relay (LOU - COMPLIED WITH 04P 6550 783013 ThrUSt Reaerser Ground Relay (Left) • Operational Test Operational Test 23.31 Completed 04P 6550 783014 TAUS, ReICISET Ground Way (Right) • COMPLIED WITH 04P 6550 783014 ThrUSt ReaerSer Ground ROW (A5110 • Operatimal Test Operational Test 23.32 Waibng amoral CMP GSSO 920001 opereaben deck package 12 month chedc 23.33 Wailing approval "" RELATED CODES "' Compiled with related co0es 0.1 23.34 Completed 04P 6550 262620 Pantie Halm Pre Extinguisher (Mt COMPLIED WITH CMP G550 262620 Portal* Raba Fre Extinguisher (Aft Cabin) • Removal / Installation Cabin) • Removal/ Installation 23.35 Completed CMP 6550 135016 Emergency Flocepath Lighting Battery COMPLIED win' 04P G550 335016 Emergency /towpath lighting Batery Pack No. 1- Renard / InstaIatan Pack Ho. 1 - Removal! Iretellabon 1209-2017 621:03 AM Gulfstream Proprietary Inhonnation Pre 23 of :V EFTA00796555 Work Order: 5C521661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawky AB Yellow = Newly Added Items. Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc StRIM I Disawancy Resokiden Ptt OFF & ON: 2013-8R Stt OFF: 88662 SR ON: 812142 23.36 Completed 09P 6550 335017 EmergenCy ROOrpath Lighting Batten, COMPLIED WITH CMP 6550 335017 Emooercy Roapath Wenn Battery PaCk Na. 2 • Removal Ingalabn Pack No. 2 - Removal! Irate/label 23.37 Completed CMP 6550 335018 Ernen;ancy flowpath Lighting Battery COMPLIED WWII CMP 6550 335018 ErrergescyFlocepath Lighting Battery Pack No. 3 - Removal / Instalatem Pack NO. 3 Removal / Installation P14 OFF & ON: 2013.8R ST4 OFF: 88660 ST4 Ott: 812143 23.38 Completed CMP 6550 235303 Oxygen mask Mkroctione (anew) - COMPLIED WITH CMP 6550 235303 Orygen Mask 1410))0,30e (Observer) • Opera/Penal TeSt Operational Ted 23.39 Completed CMP 6550 351003 Oxygen Meek / Regutsta (Gamer) - COMPLIED WITH CMP 6550 351003 Oxygen Mask 1 Regulator (0bserver) - Fin:tonal Tel FtrcUonal Test 23.40 Open 09P 6550 351023 Crew Oxygen MaSk and Regulate( Box 23.91 Open (Observer) - Removal/ 'retold'', CMP 6550 350001 Oxygen System Operabenal Test 23.42 Completed CMP 6550 351207 Passenger Oxygen Low•PreSSure Swath • operational Test COMPUED WITH CPS 6550 351207 Passenger O49en Low-Pressure Settee OPOOPOnal TEST 23.93 Completed CMP 6550 351222 Passenger Oxygen Cylrder (No. 2) - COMPLIED WITH CMP 6550 351222 Passenger Oxygen Cylnder (No. 2) - Removal/ Installation Removal f Instalation 23.44 Open Car 6550 352003 PAX Ore SYS (AVIONA74) OPS Of IMIR Discrepancies related to Miscellaneous CMP Tasks (Exhibit 3) - (Ref. Stern C 1.3 of Proposal ION 7039702 R00) 24.1 Completed 24.2 Completed 24.3 Completed BM WAS St upper moat suer. spins Ireely. Ref 23.3 Twee tad me'a'ls en holt stab 1/13 RAH leading edge 2 Babe Buis taiOtt cap Check and require rePlaCernent Refer to &CCM 31.1 SKI 311. 25 Replace all Main and Now Wes • (Ret Rem Cis or Frogosal IDA 7039702 R00) itcmme and RecidfC all min and nose landng gear tires. 25.1 In Progress 25.1.1 Completed 24 26.1 CenDlete0 26.2 Completed 26.3 COMPleted 26.9 Waiting aPPrOyal (1.1 27 27.1 Completed 27.1.1 Completed 27.1.2 Completed 27.1.3 Completed Rommel main wheel (4) and Muted t0 back PPP . Re' items 11.58 thru 11.61 CUSTOMER PROPERTY OUT TO VENDOR SEND BLOW DOWN BOTTLE TO SUPPLIER FOR HYDROSTATIC TEST MID RETURN TO AIRCRAFT CUSTOMER PROPERTY AC 5173 TN - N415LM REQUESTED RETURN DATE • 11/9 SEND 02 BOTTLE TO SUPPLIER TO COMPLY WWII HYDROSTATIC TEST MID RETURN TO AIRCRAFT CUSTOMER PROPERTY AC 5173 TN - N415LM REQUESTED RETURN DATE - 11/11 SEND 02 MASK TO SLPPUER FOR RESTORE/RECERTIFY AND RETURN TO AIRCRAFT CUSTOMER PROPERTY AC 5173 TN - N415LM REQUESTED RETURN DATE 11/24 COMPLY WITH DRAWING 11595857976 REV. A (KM WEATHER) MODIFY PATIO. PER SWG 11595857976 REV A. DRAWING ATTACHED CUSTOMER PROPERTY AC 5173 1N N415LM REQUESTED RETURN DATE - 12/11 AIRCRAFT BATTERY (Fa MA BATTERY • MAIN SNIP BATTERY) THE * 1 III) MAIN AIRCRAFT BATTERY DUE CAPACITY CHECK / DEEP CYCLE. REF: 21.7 Inbound InSpeCtigl Hidden DaTiage Complete FM fan 8130-3 or apivalent Verify Repair Upon loaner lmesugatan Nord RIH EVAS art upse matting screw to be Installed per recommended cfrawIng WAS 1075TC ORG No. 6064 Rev. E. Tighten nut as respired per ORG installation. No father maidens-me required. Replaced three MAWONS On 1/I3 l0adrg edge per plInt 11590552001 rev AQ Ordered and reciewpi New Bruce Batts. Ref Items 23.35 and 23.37 Redeved Blow Orme BOW Redeved 02 Bottle. Redeved 02 mask PERPORP43) CELL TO CASE LEAK CHEM TORQUED UPPER HARDWARE. ( 113 IN. LBS)C0e4RJED WITH T1* CAPACITYOM( / DEEP CYCLE PROCEWRES. BATTERY PASSEDCAPACITY CHECK. STROPPED BATTERY OUT OVERNIGHT (DEEP CYCLE). REMOVED SHOWING SWAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES. CHECKED WATER LEVEL. SAFT CHM 2434.01 R/R•I AUGUST 30. 1996 TORQUE WRENCH C/N 550298 . DUE 09/2018 OHM C/N 562947 & 562946 CAL. CVE 04-Z018 Inbound tnspecvon oompORI MM. N/A Issued appropriate fern and reified certificate number. 12(110017 6.2Los Am Gulfstream Proprietary Information ha 2%01210 EFTA00796556 Work Order: 5C521661 AC: 5173 STN: Charles Thomas SCC: Julian Brown Squawks: All Yellow = Newly Added Items, Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Status Discrepancy Resolution Static., or kreign Authonty [edit:sten *enter. 27.1.4 Completed PERFORMED CELL TO CASE LEW CHECK TORQUED UPPER HARDWARE (113 Inch lbs). COMPLIED WITH CAPACTIY OIECX / DEEP CYCLE PROCEDURES. BATTERY FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT OVERSIGHT (DEEP CYCLE). SAFT 04M 24-34-01 Ft/R-1 AUG 30/96 TORQUE WRENCH C/N 550293 DUE CAL 09/2018 C/N 562947 DUE CAL 0412018 CMM C/N 562948 DUE CAL 04/2018 27.1.5 Completed REMOVED SKATING SWAPS. SERVICED BATTERY. COMPLIED WITH THE 2ND CAPACITY OIECK. BATTERY PASSED TIOCAMOTY CHECK. STRAPPED BATTERY OUT OVERNICHT(DEFP CYCLE). sAIT Emit 24.344 R/13.1 AUGUST 30, 1596 28 AVIATION BATTERY TYPE - CORE (PCS ESKA BATTERY B MAIN SNIP BATTERY) 28.1 Competed THE a 2 MAIN AIRCRAFT BATTERY DUE CAPACITY CHECK / PERFORMED CELL TO CASE LEAX CHEM TORQUED UPPER HARDWARE. ( 113 IN. L85) COMPIJED WTTH DEEP CYCLE. CAPACITY 0180( 1 DEEP CYCLE PROCEDURES. BATTERY PASSED CAPACITY CHECK. STRAPPED BATTERY OUT OVERNIGHT (DEEP CYCLE). REMOVED SHORTING STRAPS. SERVICED BATTERY. VERIFIED ALL CELL VOLTAGES. REF: 21.8 CHECKED WATER LEVEL. SAFT CMM 244441 R/R•I AUGUST 30. 1996 TORQUE WRENCH C/N 550298 CAL DUE 09/2018 OHM C/N 562947 & 562948 CAL. WE 042018 28.1.1 Oxnpkted Inbound Inspect= Inbound Inspector. complied with. 28.1 .2 Completed mdden Damage N/A 28.1.3 Completed Complete FM Tam 8130.3 or eouwalent. Verify Repair !Med PANOMIate form and %vented <Mika° ',voter. Stabcw or Fenian Authonty Certilkstion *ants. 28.1.4 Completed PERFORMED CELL TO CASE LUX CHECK TORQUED UPPER HARDWARE (113 Inch lbs). COMPLIED WITH CAPACTIY 01E0( / DEEP CYCLE PROCEDURES. BATTERY FAILED 1st CAPACITY CHECK. BATTERY STRAPPED OUT OVERNIGHT (DEEP CYCLE). SAFT 04M 24-34-01 R/R-1 AUG 30/96 TORQUE WRENCH C/N 550293 DUE CAL 0912018 OMIT C/N 562947 DUE CAL 0412018 CMM CAN 562948 DUE CAL 04/2018 28.1.5 Completed REMOVED SKIRTING SWAPS. SERVICED BATTERY. COMPLIED WITH THE 2ND CAPACITY OIECK. BATTERY PASSED 2%0CAPACITY CHECK. SWAPPED BATTERY OUT OVERNIGHT(DEEP CYCLE). SAFT 0114 24.34-01 R/R.L AUGUST 30, 1996 29 PAIRING ASSY, BULLET, PWD 29.1 Compkteci FwD BULLET FAIRING (KNEE PANEL) HAS EVIDENCE CF Repaired satcom radome. Reference: Engineering Oispo In step 29.2.1.1 ON B/P 1159CSH52024 1/17/06 EROSIOII AT FWD EDGE AROUND FV/D EDGE AROUND Ereineenro Ospos in steps 29.3.8 ard 29.3.10. FWD LOOKING CAMERA AND A PUNCTURE INSIDE CS FAIRING. AREAS STAKED WIN BLUE GREASE PERM FWD BULLET FAIRING Pang ->1155C5H52024-405 IRAN MD RETURN TO AIRCRAFT Sere .>N/A Final finish nil apply at service cue,. CUSTOMER PROPERTY AC 5173 TN - N4ISLM REQUESTED RETURN DATE • 11117 29.1.1 Completed !nearing Inspecten Complied with Incoming Inspect:an. Part, ->1159C9452024-405 Sera ->N/A Mass/Balance Status >N/A Foreign Authaity Status —>N/A 29.1 .2 Competed TearcioAn N/A 29.1 .3 Competed Inspection Performed Used impaction of Worn. reference ET 1159C9452024 Rev. D Released 1/17/06. 29.1.4 Completed Rework Repaired satcom radome. Reference: Engneeing dace in step 29.2.1.1 and 6/P 1159051152024 1/17/06 Engneenng dspos in steps 21.3.8 and 29.3.10. 29.1 .5 Completed ASSErnMy N/A 29.1 .6 Completed Test N/A 29.1.7 Completed Refir,sh Refinished as required. See steps beau. 29.1.7.1 Completed Made 14,Iar Made mykr for sate= for dnisco of gray aM white ccias (had no seen sealer separating cans) 29.1 7.2 Completed Apply 10P2.3 anditatic coating Prepped and sdvert waShed. ReCGAMPS4122 Rev.B (06/29/17) appied 10P2.3 ana-strec coren) to repair areas only, bad, a (8476182W2/8476154019)Rd:GAMPS3113 RRY.B (10/17/14), Expres 04/18 Are-stabc test-N/A, (area to small to perform anti-static resistance died0 29.1.7.3 Competed stro-sand and prime with 3012 / D-8CO3 HI•B/Id.ARP, >StripSarded old finish. Ref. GAMPSI000 Rey:GX04/13/17). 1092-3 Anti-Stabc,Re-pnme with 3012. >Malted for 3012 primer. Rd. B/P 1159CSH52024 Rev.V(01/17/06). >Apoled 3012 prrner. Rd. GAMPS3116 Rev:C(05/18/16). Br 115104/115105. 00. Date 0431/2018 >ApeTied D4003 MKBult. ReCGAMPS3103 Rthr.D109/17ton. 0-8003 Base Bata* TE3887UF Exp. Date 05/31/2020. 0-9001 Converter Batelle TC2224UF Exp.Date 03/3112019. >Sanded D8003 smooth. Ref. GAMPS4000 Rev:G(04/13/17). >Apoled 10P2-3 ArOSINK al tner.Ref. GAMES3113 RaIT(10/07/14). lon.3 Mb-State base Batdit B477032058ExpiNate 03/30/2018. 12152017 611:0SAM Gulfstream Proprietary Information het 24 of29 EFTA00796557 Work Order: 5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian Brown Squawks•. AD Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or slice Friday on Mondays) Assoc Stalin I DIserepanoar 29.1.7.0 Completed 29.1.8 Completed 29.2 Completed 29.2.1 Completed 29.2.1.1 Completed Apply 10P2.3 Anti-StatIC, Perform reStiOvIty test. Outgare Imagery frozen along the leadng edge and dherter strips. Request engineering evaluation for repair of erosion. Engineang dsposten: Remove latrine darter end badman ea reoured. Sad eroded areas SmtOth. Scuff sand minimum 1.50in sound seas to be repaired, roaming allglossy 'JEWS, to prepay fa wet layup. Fabricate two riles using pies of 161/181Chle dv fiberglass cloth. Sue plies to ensure coverage of eroded and sat regions. Ply al *mold extend at least 1.03n teyerd the reworked area and Ply #2 Shedd e*erd at least .50In beyond Ply PI, except pries may end at edge of part where aPplealak. Saturate Flies 1 and 2 with SW Edon 828/DTA or Hysol EA.956A/8 mixed per manufacturer's insbuctipm. ay to rework areas with Ply E 1 and Ply *2 ensuring adequate overlap as welted above. Cure plies under vacuum bag a 75-9,F far at least 12 EC-110 Owing Solution Batch* 8477032055 Rm. Date 03130/20/8 (See step 29.1.7.4 for test) >Re-Prkned *AM 3012. Ref. GA141:53116 Rev.T(05/18/16). Bald,* 115100/115105. Op. Date04/31/2018. >Adored 101,24 Antillatk. Ref. GAMPS3303 ReY.W(03/18/09). >Pedcored resistivity Map:kali readrogswreacceptabb. Meter* 563023 Wert Date 05/18. Complied uith Ortgong Imagery requirements Part rill return to service center. Repaired erosion along the leading edge end replaced all darter strips. Reference: Engineering dspo in step 29.2.1.1 and ftP 1159C:4452074 Rev. 0.1/17/06 SEE ENGINEERING DISPO STEP 29.2.1.1 MRS E391 With co-oarrence from T. Sutherland, Liaises, hairs, or under vacuum bag a 7S4 for a 2-3 houn folaved by 3 notes at 130-140'F. Remove vacuum bag end sad smooth. Visudly inspect reworked area; y repaid, All and far using Ilysol EA960F and MN to eateur. If required, instal lightning dherter as desabed babe,. Touch tp web pruner and paint to match customer tOCKOat. as required. Lightning (limner . instaltation: Prepare SurfaCe to be bonded Per CAWS 8210: scan Sand then solvent woe web VEK or aoetore followed by IsoPoPYI alcohol. Apply G4A1000010 Or GAA1008003 allesne and pogrom Overlay per 1159062024. Cure under vacuum bag for days at room temperature, or 2-3 hens a room temperature folewee by 2 hours at 130-140'F. 29.22 Combined REMOVED PAINT/PRIMER FROM DISCREPANT FWD OREM EPON 828 AND SOLVENT CLEANED. THEN FABRICATED BATCH* DP7C1613/1737GG Om 3f31/18 INSTALLED 2 PLIES OF Mil 181 FIBERGLASS WET USP.G DTA EPON 828/DTA VACUUM BAGGED AND CURED. REF LOTS /70570026 W 2/16/18 ENGWEERING DISPO STEP 29.2.1.1 29.2-3 Coiratend Removed and replaced al &rater stnca(PM PR1436-G BATCM*1043011 0717 SIP:10 APR 2018. ISSQW00-0460). Reference: 8/P 1159a1152024 Rev. 0 Released 1/17/06. 29.3 Competed Rintturt on &H WY* sten Repacked puncture on UH inner stsface. Reference: Engineering dispas in steps 29.38 and 29.3.10. 29.3.1 Carpeted Request engineering evaluation for rep* of inner skin See step 29.3.3 for engineering deposition. Pulleture. 29.32 Completed Request NDT to perform tap test of inner sten puncture. NDT pa-formed tap test nspectico on inner skin puncture per GC RDTP 2.1 No distend rioted outside the puncture area visibly see /noted See files tab for pc and location of puncture 29.33 Carpeted Preliminary Err :erne Dspasiten: Refer to pie n the lies" tab for suspect location ei contact area. Place a soft eanCreSSible material (day. reporutoer, etc-) mat will Main location and Merlin t thiS is the contact area. Install fad bullet fame ad attach with EtO hadware. Remove fairing and take pia ei suspect contact area. Resubmit pa via Om*, IP engine*. mg for evaluation. MR8 Na. E064 29.3.4 Completed Per amnionsy engineerng dspostion placed a sea compressible material (repro-rubber) on the contact area. Installed fad trtilet fairing and attach sera B/P hardware. Renxweed faring and cock gaol suspect contact area. Resubmited pes to engineering. 29.3 .5 Completed Preliminary Engineering Opposition: Refer to plc n Pie' Flies' tat OW a ,43. 30 at tne location shorn. Take a measurement from the Inner surface of outer son to the cuter surface of inner skn. Rewtont results to agreeing for Final disposition. MR$ No. E064 29.3.6 Completed Resubmit engneenng alter measurement from the inner See step 29.3.7 lof engineering disco. surface of outer sidre to the otter surface of inner stn IVISROI7 a2I:05AM Gulfstream Proprietary Information Pea ZS a 29 EFTA00796558 Work Order: SCS21661 AC: 5173 STM: Chart Thomas SCC: Julian Brown Squawks: AD Yellow = Newly Added Items. Green = Changed Items (Ready for inspedion or completed) from previous day (or since Friday on Mondays) j Dame i Maths 29.3.7 Coreasted 29.3.8 Ccapkted Discrepant/ is .21CP Preliminary Engineenso Cispasibcn: Refer to attachment in me "Piles" tan: uSing the smallest dean updiameter, represented by me red dash line. Wm out the discrepant sectir of inner sat and associated care clown to the bond surface of outer skin. Do not undo:raft the cuter dun or Incorporate core amp at thiS thee. measure, Oxument. and restamit resulting din to Ole. MRS 8064 Final Engineering Deposition: Rework per Steps 1 Oyu 13. NOTE Steps 9 lieu 13 are in 29.3.9. Cutout of the inner gun and cue rernwal 5 acreotable. Proceed %OM fOieming rework: 1. Refer to 'Ttles' Pcwerpoint attadunent Section AMA 29.3.7. Incorporate core ramp that startS from edge of cutout ottendng 25 t0 35 'relies beyond cutout. At me lower CCP it is acceptable for the denier to extend onto the sold laminate. 2. Straighten out fOrled Over core Cells and rernOve 10060 COS. VOIXRIM out 09)% 3. Pot core ramp with Magnctond 68-3. Cure a 70 to 95F unit patina Ass a harden surface. DO not touch sanded r.uraces vita bare hands wear dean cotton gloves 1. Sphere dean using hean cheesecloth vipers wet with MEP cc Isocecpfl Alcor°, an e- ea cnendng at least IS Inches beyond Mast Cr to EOP. v.ncnever Is closer. Contnue until wipers reman clean. Do not use synthetic Or shop towel caper rruterkis. Also solvent dam a corresponIng a ea n outer stin. • Sand off excess patting. Sand Inner bond strface to removeare SNOW and any glassy strface malt. also cord sandng aroerd skin neat out an area edending Iron lower EOP or at least 2.0 wises bewnd edge ci cutout to expose me outer fiberglass (F/G) pat. Vacuum out debris. Traces ci psi. prima, etc. remaining nein the FIG weave shall be acceptable. 6. Sand correspond Outer skin surface In the sang way. 7. On inner skin add two riles of dry Stye 181 (FM). Odereabcn of both pies is cabala:. It is acceptable to dot F/G to stow workeg out winkles. Stagger darts so they do rot overlap onto each other. Saturated Files waA (Don 828 / DTA a EA956 A.03. Refer to SR1151.34.60 Table I and SRM 51078-10 Resat Technique 7. B. Refers Files tab in 293.7. Ply a :Nil crrerlap .50 to .80 Inds *PO the Inner surface. Ply 2 gal overlap Me I by .50 to .80 Indies. Cispasibcn continues in 293.9 MRB No. (061 ReeteuDen 29.3.9 COMOleter1 Final Engineering 06PaStiCri Continued from 29.3.8, 9. On outer surface edd like Vies centered met cutout. 10, Distal a Peatner pack and vacuum 0.19. refer t0 StI451-78-10 Repair l'echrictie 8. Perform a vacuum leak chedc by piling fUl vacuum Orin 21 inches of Hg) until bag is pulled tight. Disconnect vacuum saute and vet max leakage rate ODES not exceed 5 Indies of Hg wean 5 mnutes. II. are at 70 to 95F until adhesive gelswilds should take at had 4 bows. 12. Aiter cure remove bag and sand off excess adheswe and F/G. Tap UP outer and Inner NOS within repair area t0 very no voidsand or &bands edit. Aso visually yet no ply separations 13. on outer psface apply Finlsn 3012 (CAMPS 3116) Colonel Dv anti-static pent and customer topcoat Ensure appled antistatic pant ovalaps ate the existing antistatic part On ruler surface no finish a reputed triers dry surfaces eats and if so apply Finish 3012 to entire replied surface. Thu is a miser repair. MRS No. E064 DISp051110n o00rdrated wet White (MOSS). Repair IS acceptable. 29.3 10 COMOleted Made <earwig and potted core wet Inagnobond 68.3. EPON 828: MFG batch0:0P7C1613 UP: 31 MAR 2018 Cured at 70 to potting has a harden surface. 01k MFG bathe: 550 EW:02/16/201,3 Solvent clamed, sanded cif ewes pattna. Sat freer tend surface and extend sanded around skin cutout ewer an area. On inner and Otter Pun added two plies of dry SPA lel (F/G). Saturated OleS with Epcn 828 / DTA. Install vacuum bag, perfumed a wicuurn 1St theca and cured at 70 to 95F. Mer cured remove bag and sand a(f excess adhesne and F/C. Tap tested Outer and One stin vein repay area to venre0 no voidsand/or dstrands edit. Also visually veered no ply operatians eats( Work reference:Engineering &spa in sbps 29.38 and 293.10. 30 Addition of a SHADE MASTER at the Right•Itand 12 VIP Seat - (Ref. Item 8 1.1 of Proposal 10e703856S ROO ) 30.1 Open Addiaon or a SHADE MASTER at the Rght.itin0 A2 VIP Sea The existing rigtt-hand *2 forward VIP meth panel will be removed and a new panel Math SHADE MASTER functionality Installed. FolonIng panel replacement. tne Caton Management System (OWS) software wit be updated and a Reference 11579. 12,15)2017 6:21:05AM Gulfstream Proprietary Information Pre/ 260129 EFTA00796559 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julian Brown Squawks Ali Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Ffiday on Mondays) Assoc math—s1 Discrepant/ 30.1.1 In Progress 30.1 .2 open 30.1.3 Open 30.1.4 Open 30.1.5 Open 31 31.1 Completed 31.1.1 Compieted 31.1.2 Compieted 31.1.3 Completed 31.1.4 Completed 33 32.1 Completed 32.1.1 Completed 32.1 .2 Completed 32.1 .3 Completed 32.1.4 Completed 32.2 Completed 33 33.1 Completed 33.1.1 Completed 33.1 .2 Completed 33.1 .3 Completed 33.1.4 Completed system operational died( pertained. New Components: One WA-Type Siutch Panel 2 x II - ROCCO COMM Modred Components: Cabin Management System Software - Rodowd Conn, Certification: This modficaticre wit be alcoved as a mope alterauon, ant/ documented on an FM 337. Notes: The removed panel nil be returned to the osecener for use as a spare at the at VIP seat location. System repairs are not Included and ar required %mid be addressed on a tine and material b095. Amen= Ernineerng Leber Re urb custom froneerirg art tabor Regurb AN Systems Test Labor DR/ AN fElectnoal Labor Only Inspection Labor Ply SATIWW, EMERSWICT Comply with Sc yunyFloorpath lighting Battery 71CA (Deep Cycle) No. 1 - Functional Test Ref: 23.19 Inbound Inspection Hidden Menage Complete FM form 8130-3 or equivalent Verify Repair 9a•en ar foreign Authonty Certification liAtmter. Inspected uMt. Performed Deep Cyde/Cap Cored Ve accordance with BRUCE ORM 33.21-70 Rev (5)dated Mae IS. 2036. lertmurn required dscharge time a 15:03. tint FAILS to meet maintenance spec via discharge tame of 7:57. Raced Lilt on 16 hour slow charge. secend capacty test 10 be conducted II/10/17. 563440420:8 CN BATTERY, EMERGENCY LIGHTS Comply with Emergency Footpath Ughtina Battery Padc (Deep Cycle) No. 2 - Functional Test Ref: 23.20 Inbound Inspect= Hidden Menage Complete FM Porn 81303 or eommalent. Verify Repair Steam or foreign Authonty Certification Nimtcr. Inspected unit. Perfomied Deep 0/de/Cep area in accordance with BRUCE CMM 33-21.70 Rev (5) dated May 16, 2036. NO faults found. airrimum required discharge time is 15:00. Unit meets maintenance spec wth discharge time of 18:22. Placed unit an 16 hour Om charge. CH 5634404/2018 •••VOID•••O4P GSSO 324033 Mein Tire Assembly (Left Inboard) Inspection BATTERY, EMERGENCY LIGHTS Comply vath Emergency Ieomatn twatng Battery Pei (Deep Cycle) No. 3 functional Tex Ref: 23.21 Inbound Inspection Midden Damage Compete FM form 8130-3 or equaalent Verify Repair Stabcce or Foreign Authonty Certification banter. Inspected unit. Perfomied Deep 0/de/Cep Chedc its accordance with BRUCE CHM 33-21.70 Rev (5) dated May 16, 2036. larimum required °scheme time is 15:00. unit FAILS to meet maintenance spec vieh dadiarge tine of 7:54. Mated ant on 16 hem slow charge. Second capaoly leg to 02<On:tufted 11/10/17. CPI 561440 RI2018 34 MAIN WHEEL ASSEMBLY 34.1 Completed ROITE TO BACK 940P FOR TIRE OUNCE, BEAD SEAT AND NOT. INSPECT BEARING AND PAD( CUSTOMER PROPERTY AC 5173 1N - N4151.M REQUESTED RETURN DATE 12/4 Resolulion Performed visual inspection. Seep and Performed stand capaaty chedc Unit FAILED aposity check withdee/large time of 5:41. Unit DOES NOT meet marten/ me spec LAW: Bruce 33-21-70 MAINT MeNUAL, REV S, DATED 5/16,2006. Recommend Scrapping or to Return to Vender. CH 563440 4/2018 Inbound InspecOon complle0 with. No 8130-3 or ecnivalent wit be issued. Inspected unit. Performed Deep cycle/Cap Check n accordance with BRUCE CalM 33-21.70 Rev (5) dated May 16, 2015. No faults found. Minimum rasped discharge time is 15:00. Unt meets maintenance spec with discharge time of 18:22. CH 5634404/2018 Inbound Inspechas complied with. N/A Issued appropriate loon and vented <mutate nattier. •••VDID•••DLplceh of 11.69 Perfcrmed visual nspacbon. Sap and Po-famed secend capacity chedc Unit FAILED opacity check with deduce tine of 9:57. Unit DOES NOT rreet moistener= specs LAW: Bruce 33-21-70 MANI MM* AL, REV S, DATED 5/16/2006' Reammerd Scrapping or ID Return ID Vendor. CH 563440 4/2018 Inbound Inspection complied with. N/A No 8130-30, eativalent roll 0e ISSued REPAIRED NOT MAIN WHEEL/TIRE ASSEMBLY REF. RUHR) Onta 3244-47, REV.14, Ca. 28, 2016, TR 32.13 DTD 11/03/17, 5PM 3249-99 REV. 3 DTD. 04/28/2015, AND B/P 115906003 REV. DTD. 2/26/2039. PIN 1199LS6001-9 5/N 5159FX TS/I WA 150 N/A CSN WA co WA MOUNTED NEW TIRE PIN 1159SCL506-1(350K02-1) SM 72015604 ON WHEEL HUB ASSY. PM 1159503034 SfN 12J152017 A21:OSAM Gulfstream Proprietary Information Pace 2, of29 EFTA00796560 Work Order: 5C521661 AC: 5173 STM: Charles Thomas SCC: Julan Brown &powkin All Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from previous day (or since Friday on Mondays) Assoc Stalin 34.1.1 Completed 34.1.2 Completed 341 3 Completed 34.1.4 Completed 34.1.5 Completed 34.1.6 Completed 34.1.7 Completed 34.1.8 Completed 34.2 Competed 35 35.1 Completed 35.1.1 Completed 35.12 Completed 35.1.3 Completed 35.1.4 Completed 35.13 Completed 35.1.6 Completed 3517 Completed 35.1.8 Completed 35.2 Completed 16 36.1 Competed 36.1.1 Completed 36.1.2 Completed Edscrqsanoir INCOMING INSPECTION 7DACOWN RIVERTON NOT ASSEMBLY TEST CLEML INSPECT. PACK PAID INSTNI. BEAMS DEFLATE FOR SHIPPING AND STORAGE REMOVE OLD TIRE S/N 52243136 MO MOUNT HEW TIRE. MAIN WHEEL ASSEMBLY ROUTE TO BACK 910P FOR TIRE DiNia, BEAD SEAT AND NOT. INSPECT BEARING AND PACK CUSTOMER PROPERTY AC 5173 TN • 11415tH REQUESTED RETURN DATE 12/4 INCOMING INSPECTION MAROON N INSPECTION NOT ASSEMBLY TEST CLEAN INSPECT. PACK AND INSTALL BEARINGS DEFLATE FOR SHIPPING MO STORAGE REMOVE OLD TIRE SM 60293131 AND MOUNT NEW TIRE. MAIN WHEW. ASSEMBLY ROUTE TO BACK SHOP FOR TIRE CWVIGE, BEAD SEAT AND NOT. INSPECT BEARING MD PACK CUSTOMER PROPERTY AC 5173 TN -3/91510 REQUESTED RETURN DATE 12/4 INCOMING INSPECTION TEARCOWN Reedution S 59rx. NOTE TO INSTALLER • THIS ASSEMBLY ONLY CONTAINSA STORAGE NITROGEN PRESSURE OF 90 PSI. UPON ItISTALLATTON OF THIS ASSEMBLY MARE THAT IT IS PROPERLY SERVICED PER THE APPUCABLE AIRCRAFT MAINTENANCE MANUAL Complied with looming Inspecbon; MAIN VA103. MD TIRE ASSY. Parte a1159L560639 Serials > .. 5159FX Tea-dorm Complied with ref. Dollop CMM 324142, REV.11, CCT.20, 2016, TR 32-13 DID 11/03/17. TIRE CHANGE AND BEAD SEAT NOT ONLY. Conned win Tel. Dollop CMM 3244-42, REV.14, OCT. 28, 2016, M 32.13 DTD 11/03/17. NDT performed Eddy Current Inspection on BEAD SEAT Po CAC IOW 3.0 Rey.] No Oohs Noted. EquOment UHd: NOON SODS 561194 Cal Due 12/17, ECM SW. 560706 Assembled re. Duritip CMM 324442, RE./.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17. Complied with re. Otribe CMM 3241-12, REV.14, OCT. 22, 2016, TR 32-13 DID 11/03/17. NO (EMS NOTED. VERIFIED USING HMO IELD GAUGE S65789 CALIBRATION DUE DATE 0212018. ON TEST 9:00AM ON 12/2/2017 OFF TEST 9.30AM ON 12)3/2017 Complied with ref. Dunlop CMM 3241-12, REV.14, OCT. yty. 2016, TR 32-13 DID 11/03/17. SEE STEPS BELOW DEFLATED FOR SHIPPINGMO STORAGE MOUNTED NEW TIRE P/N 115950.506.1, (3501(02.1) S/N 72015604 ON MAIN WHEEL P/N 115993.503-9 SM 5159FX Complied with ref. Duty CMM 3241-12, REV.14, OCT. 22, 2016, TR 32-13 DID 11/03/17. REPAIRED! NDT MANN WHEEL/TIRE ASSEMBLY REF. Dump OM 324442, REY.14, OCT. 28, 2016,18 32-13 DID 11103/17, SPM 3249-99 REV. 3 DTD. 09/28/2015, AND B/P 1159136003 REV. DID. 2/26)2039. P/N 11591.56003-7 S/N 5167FP TSN WA TS0 N/A MN WA 00 WA MOUNTED NEW TIRE P/N 115950.506-1(350K02-1) S/N 7201559B ON WHEEL MIEI ASSY. P/N 1159505037 SIN 5167W. NOTE TO INSTALLER - THIS ASSEMBLY ONLY 03NTAINS A STORAGE NITROGEN PRESSURE Of 40 PSI. UPON INSTALLATION OF THIS ASSEMBLY cresc THAT IT IS PROPERLY SERVICEDPER THE APPLICABLE AIRCRAFT MAINTENANCE MANUAL Complied with Incoming Inspectran; MAIN WHEEL NO TIRE ASSY. PANS------>I1S9LS6003-7 Serial; a 5167W TearckrAn Complied with rel. Donto 04/9 3244-42, REV.14, OCT. 28, 2016. M 3213 DID 11/03/17. TIRE CHANGE MD BEAD SEAT NOT ONLY. Complied with ref. Dunlop CMM 3241-12, REV.I4, OCT. 29, 2016, TR 32-13 DID 11/03/17. NOT performed Eddy current inspecuon an BEAD SEAT per GAG NDTP 3.0 Rev.? NO Cade rioted. Ecopment Used: Nolte 5005 561194 Cal Due 12/17, ECM SW. 560706 Assembled ref. Dunlop OM 32-99-92, REV.14, OCT. 72, 2016,1R 32-13 DID 11/03/17. Complied with re. OuROP CMM 324442. REV.14, OCT. 28, 2016, M 32.13 DTD 11/03/17. AO LEAKS NOTED. VERIFIED USING HAND HEW GAUGE 565789 CALIBRATION DUE DATE 02/2018. ON TEST 9:00M4 ON 12/2/2017 OFF TEST 9:30AM ON 1213/2017 conned with rel. ENAMOR CMM 32-11-12, REV.14, OCT. 28, 2016, M 32.13 DTD 11/03/17. SEE STEPS BELOW DERATED FOR SHIPPING AND STORAGE MOUNTED NEW TIRE P/N 115960506.1, (350(02.1)5M 72015596 ON MAIN WHEEL P/N 1159SCL5C0-7 SM 5167W corneas with rel. OMR CMM 324442, REV.14, OCT. 28, 2016,18 32.13 DTD 11/03/17. REPAIRED / NDT MAIN WHEEL/TIRE ASSEMBLY REF. Deem DIN 32-99-92, REV.14, OCT. 28, 2016, TR 32-13 DTD 11/03/17. SPM 3249.99 REV. 3 OM. 04/2B/2015. AND SIP 115%56003 REV. *.' DTD. 2/26/009. P/N 1159L56003-9 S/N S175GC TSN WA ISO WA ON N/A CSO N/A MOUNTED NEW TIRE P/N 115950.506.1(350K02.1) S/N 71665589 ON %WEL HUB ASSY. PM 11556CL5031 SM 517SGC. NOTE TO INSTALLER • THIS ASSEMBLY MAY CONTAINS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON INSTALLATION OF THIS ASSEMBLY ENSURE THAT IT IS PROPERLY SERVICED PER THE APPLICABLE AIRCRAFT MAINTENANCE MANUAL ComptItd with Warring Inspeda3n; MAIN WHEEL MD TIRE ASSY. Parte---a1159L56003.9 Seriele--> 5175GC Team:own Complied with ref. Dunlop CMM 324142, REV.11, OCT. a 2016, TR 32-13 DID 11/03/17. TIRE CHANGE MID BEAD SEAT NOT ONLY. 12/11.2017 6:21:05AM Gal/stream Proprietary Infonnation Pam nets EFTA00796561 Work Order: 5C521661 AC: 5173 STM: Chalks Thomas SCC: Julian &Own &wads ail Yellow = Newly Added Items Green = Changed Items (Ready for inspection or completed) from pevious day (or since Friday on Mondays) Asoc Shan I 36.13 Cempleted 36.1.1 Completed 36.13 Completed 36.1.6 Completed 36.1.7 Comoh:ted 36.1A Comoh:ted 36.2 Completed 37 37.1 Carolded 37.1.1 Cempleted 37.1.2 Completed 37.1.3 Comoeted 37.1.4 Complied 37.1.5 Comoeted 37.1.6 Completed 37.1.7 Completed 37.1.8 Completed 37.2 Comoeted Discrepancy INSPECTION NOT ASSEMBLY TEST CLEAN, INSPECT. PACK AND INSTALL BEARINGS DEFLATE FCR SHIPPING AND STORAGE REMOVE OLD TIRE SfN 52543193 AND MOUNT NEW TIRE. MAIN WHEEL ASSEMBLY ROJTE TO SECA Su:bi-:* TRC CMANCS. AND NOT. INSPECT BEARING AND PACK BEAD SEAT REPAIRED f NDT MAIN 11/)3/17, SPM 32-4949 P/N 1159L56003-7 CUSTOMER PROPERTY AC 5173 III 7/4151M 5/N 5188FP TSN WA ISO N/A REQUESTED RETURN DATE 12/4 GSA WA CSO WA MOUNTED NEW TIRE P/N 5188FP. NOTE TO INSTALLER • THIS INSTALLATION OF THIS MARGENANCE MANUAL ateedudon Complied with M. Dist* CNN 32-44-42, PEVA% OCT. 28, 2016, TR 32-13 DID 11/03117. NOT performed Eddy Current Inspection on BEAD SEAT pa GAC NOIR 3.0 Rey.] 110 OROS Wed. Ecuoment MACS 5005 561194 Cal Due 12/17, ECM SW. 560706 Assembled ref. Durlep 0461 324942, REV.14, OCT. 28, 2016, TR 32-13 DTD 11/03/17. Complied with ref. Domlop CMM 32-44-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03117. NO LEAPS NOTED. VERIFIED USING HMO HELD GAUGE 565789 CALIBRATICM DUE DATE 02/2018. ON TEST 9:00AM ON 1V7/2017 OFF TEST 9.30AM ON 12/3/2017 Complied with itt. MAW CMM 32-44-42 REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17. SEE STEPS BELOW DEBUTED FCR SHIPPING MO STORAGE MOUNTED NEW TIRE P/N 115950.506-1, (3501(02-1) SIN 71865589 ON MAIN WHEEL P/N 1159SCL503-9 S/N 517SGC comcom nen mi. Da to CMM 3244-42, REV.14, OCT. 28, 2016,18 32-13 DTD 11/03/17. INCOMING INSPECTION TEARCOWN INSPECTION NOT ASSEMBLY TEST CLEM. INSPECT, PACK AND INSTALL BEARINGS DEFLATE FCR SHIPPING AND STORAGE REMOVE OLD TIRE S/N 60323055 AND MOUNT NEW TIRE WHEEIJ1IRE ASSEMBLY REF. Dunlop OW 32-99-92, REV.14, OCT. 28, 2016,1R 32-13 DTD REV. 3 DTD. 09/28/2015, MO B/P 11591.56003 REV. DTD. 2/26/2039. 11595CL506-1(350K02-1) 5/N 71925582 ON WHEEL HUB ASSY. P/N 11595CL503.7 SM ASSEMBLY ONLY 03NTABIS A STORAGE NITROGEN PRESSURE OF 40 PSI. UPON ASSEMBLY ENSURE DIRT IT 15 PRCRERLY SERVICED PER THE AMICABLE AIRCRAFT Complied wiles Incoming Inspecban; MAIN WHEEL MO TIRE ASSY. Pane 1159L56003-7 Serials a .. 51e8FP TerdoAn Complied with ref. Otrdcp OM 3244-42, REV.14, OUT. 28, 2016, TR 32-13 DID 11/03/17. TIRE OUNCE AND BEAD SEAT NDT ONLY. OXMAN with rel. WINO CMM 324442, REV.14, OCT. 28, 2016,1R 32.13 DID 11/03/17. NOT mrformed Eddy Current Ineped1On On BEAD SEAT per GAC NDTP 3.0 Rev.7 No Gees Meted. Ecitgrnet Used: Nortee 500S 561194 Cal Due 12/17, ECM Std. 560706 AMMONS ref. Dunlop, 004 324942 REV.14, OCT. 28, 2016, TR 32.13 DTD 11/03/17. Candied with ref. Dtnbp CMM 3244-42, REV.11, OCT.* 2016, TR 32-13 DID 11/03/17. NO !EARS NOTED. VERIFIED USING HAND ISO GAUGE 565789 CALIBRATICM DUE DATE 02/2018. ON TEST 9:00N9 ON 12/2/2017 OFF TEST 9.30AM CM 12/3/2017 Complied will, ref. Dollop CMM 3244-42, REV.14, OCT. 28, 2016, TR 32-13 DID 11/03/17. SEE STEPS BELOW DEMATED FOR SHIPPINGMO STORAGE MOUNTED NEV/ TIRE P/N 1159SCL506.1, (3501(02.1) 5/N 71925582 ON MAIN WHEEL P/N 115950366-7 WV 5181PP Complied with ref. Domlop CMM 32-44-42, REV.14, OCT. 22, 2016, TR 32-13 DID 11/03117. 12/13)7017 6:21:05AM Gulfstream Proprietary Information Posy No129 EFTA00796562

Technical Artifacts (127)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Domain67i.us
Flight #AC0
Flight #AC120
Flight #AC43
Flight #AC5173
Flight #AF7
Flight #AM3012
Flight #LH680
Phone1 4290267
Phone1209-2017
Phone12152017
Phone14304001359
Phone14304001381
Phone14304001382
Phone14304001405
Phone14304001407
Phone14304001408
Phone15050250
Phone15906003
Phone15950366
Phone15960506
Phone2243136
Phone2543193
Phone281-1425
Phone3000090
Phone3000091
Phone3000092
Phone3000093
Phone3001084
Phone3001139
Phone3030053
Phone3112019
Phone3440420
Phone3800700
Phone4001349
Phone4001351
Phone4001379
Phone4001380
Phone4001382
Phone4001383
Phone4001405
Phone4001407
Phone4001409
Phone4001492
Phone4001496
Phone4290002
Phone4304001379
Phone4304001408
Phone4403006413
Phone4452074
Phone4469001411
Phone4804024006
Phone4805001267
Phone4806002351
Phone5300301
Phone550 2733
Phone550-2009
Phone5502563
Phone5511069
Phone5524220
Phone5557976
Phone5557977
Phone5582318
Phone5634404
Phone5807985
Phone5817985
Phone5847905
Phone5847985
Phone5857083
Phone5857976
Phone6030509
Phone6552014
Phone7021852
Phone7028140
Phone7031236
Phone7035248
Phone7037336
Phone7037536
Phone7038248
Phone7039407
Phone7039702
Phone7092716
Phone7100111
Phone7700395
Phone8000312
Phone8001411
Phone8001549
Phone8001557
Phone8031549
Phone8031557
Phone8080720
Phone8476154019
Phone8477032055
Phone8528041000
Phone9000032
Phone9000037
Phone9001791
Phone9055420
Phone9062024
Phone9125363
Phone9136003
Phone9352095
Phone9452024
Phone9503034
Phone9505037
Phone9651110
Phone9652017
Phone9851110
Phone9851419
Phone9852017
SWIFT/BICCOMPLIED
SWIFT/BICENSURING
Tail #N0113
Tail #N4151
Tail #N415LM
Wire RefREFERENCE
Wire RefRef 506238
Wire RefReference
Wire RefRefinished
Wire RefWIRE HARNESS
Wire RefWIRE ROOTING
Wire RefWIRE ROUTING
Wire RefWire drawing
Wire Refreference
Wire Refrefurbishment
Wire Refrefurbshe0

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.