AL DEYYAR BUILDING AL BARSHA 1 PO BOX 27138
TEL:043995153
FAX043990072
C ti architecture interiors
Ref:je/vi/ha/01
18.04.2017
Attention To : Mr Jeffrey Epstein
Subject : Complete Design Offer for Hammam Complex in Great St James Island
Dear Sir,
With reference to the above subject please find below our proposal for design works for the
above mentioned project.
1.Scope of the Interior Design Works & deliverables :
All design works as per the initial design brief :
1.Planning
2.Architecture
80,000
USD
3.Interior Design
120,000
USD
4.Electromechanical design
110,000
USD
5.Floor heating system design
20,000
USD
6.Lighting design (lux calculation by supplier)
10,000
USD
7.Structural design
40,000
USD
8.Construction schedule
9.Guideline BOQ & Specification
The design packages shall include all the below unless otherwise mentioned:
1. Concept design
2. Schematic design
3. Detailed design
4.Specifications & BOQ
2-4 week
4 week
4 week
2 week
*Design criteria shall be as per the international standart
2.Time
The time for the whole design works is 8-12 weeks.
Client approval time will be added up.
Any revisions after that to be quoted separately.
Major revisions ,if any, to be quoted seperately to be agreed mutually.
3.Design Fees and Payment Schedule:
Total lump sum design fee is 380,000.00 USD
(THREEHUNDREDEIGHTYTHOUSANDUNITEDSTATEDOLLARS)
%25 advance payment
%25 upon final concept submission
%20 schematic phase
EFTA00803341
C t I architecture interiors
%20 Detailed design
%10 BOQ (quantities) & specifications
*pis refer to the attached standart deliverable list
*Any meeting outside UAE shall be back to back invoice to client
*Design Work to start once this offer is signed by both parties & advance payment is made.
*Site topography (terrain levels) to be provided by client for the detailed design and the level
of the entrance (s)
Bank Details:
UAE DIRHEM ACCOUNT:
Bank Name
: ADCB (ABU DHABI COMMERCIAL BANK)
AED Account no (iban)
: AE870030010228730124001
Swift code
: ADCBAEAA
4.Exclusions:
The below design works are excluded from this offer (not limited to):
4.2 any insurance (PI can be included upon additional fee)
4.3 any authority approvals-local authority fees by client
4.4 any construction or project management activity
4.5 security system design
4.6 any green building certification design
4.7 acoustic design
4.8 Detailed landscape design
4.9 signage design & lighting design
4.10 bidding ,contracting and tender evaluation services
4.11 shop drawings review
4.12 structural design calculation based on the local codes
4.13 energy modeling
4.14 any special consultancy
4.15 Detailed cost estimation
4.16 tender documents and tendering
4.17 site planning
4.18 traffic planning
4.19 program and management services
4.20 water feature design
4.21 Any signage or graphic design
4.22 site supervision & management
4.23 any authority approval or process or document related to local works.
4.24 Any third party fees
4.25 meetings outside UAE (Accomodation,transporation and service fees)
Zek
NNirvia
Yours sincerely, Cem Kapancioglu
Thanks & Best Regards,
2
EFTA00803342
C ti architecture interiors
Cem Kapancioglu
Architect/Leed Green Associate
Managing Director
C K Architecture Interiors L.L.C.
Assistant Proffesor in NYIT
Mobile:+971 (0) 50 745 86 13
M. Box 27138,Dubai
List of Deliverables
1.1 STANDART LIST OF INTERIOR DESIGN DOCUMENTATION
Table of Contents
List of Deliverables by the Architect to the Client:
1- CD. Concept Design
2- SD. Schematic Design Phase
3- DD. Design Development Phase
4- BOQ&Material Specification Design phase
1.Concept Design Phase
1.1.Perspectives, Images, Renderings
1.2.Sketches, Mood images,layouts
2. SD. Schematic Design Phase
1.
Layouts showing indicative Furniture layout
2.
Flooring plans
3.
Reflected Ceiling Plans showing preliminary lighting
4.
Interior Elevations with major material decisions
5.
Mood boards
6.
Main Finishing Materials list
3 DD. Design Development Phase
3
EFTA00803343
C t I architecture interiors
Cover
1. Cover Page
2. General Notes
3. List of Drawings
Basic Drawings
4. Floor Plans with full dimensions
5. Floor Finish Plan
6. Furniture Plan
7. Elevations
8. Reflected Ceiling Plans
9. Typical Details
Detailed Drawings
10. Detailed Floor Plans including wet areas
11. Detailed Elevations including wet areas and kitchens
12. Detailed Sections including wet areas and pantries
13. Locations, dimensions, finishes and frame details of all doors, mirrors,
glass partitions and artwork
14. Detailed Reflected Ceiling Plans
15. Details of the Hammam
-BOQ&Material Specification Design phase
1.Door schedule
2.Material Specifications
3.Bill of Quantities
4
EFTA00803344
C ti architecture interiors
STANDART GENERAL DRAWING DELIVERABLES
GENERAL:
335/GEN-001
COVER SHEET
335/GEN-101
LIST OF DRAWINGS
335/GEN-102
PROJECT DOCUMENT
335/GEN-103
PROJECT DOCUMENT
335/GEN-104
PROJECT DOCUMENT
335/GEN-105
AREA CALCULATION SHEET
ARCHITECTURAL DRAWINGS:
00-001
GENERAL NOTES, ABBREVIATIONS & STANDARD NOTATIONS
00-002
SITE SETTING OUT LAYOUT
00-003
SITE LEVELS AND SITE SECTIONS
00-101
SECOND BASEMENT FLOOR PLAN
00-102
FIRST BASEMENT FLOOR PLAN
00-103
GROUND FLOOR PLAN
00-104
MEZZANINE FLOOR PLAN
00-105
FIRST FLOOR PLAN
00-106
ROOF PLAN
00-107
SECTION 1 & SECTION 2
00-108
SECTION 3 & SECTION 4
00-109
ELEVATION 1, ELEVATION 2 & ELEVATION 3
00-110
ELEVATION 4 & ELEVATION 5
00-111
SECOND BASEMENT FLOOR PLAN- FINISHES SCHEDULE
00-112
FIRST BASEMENT FLOOR PLAN- FINISHES SCHEDULE
00-113
GROUND FLOOR PLAN - FINISHES SCHEDULE
00-114
MEZZANINE FLOOR PLAN - FINISHES SCHEDULE
00-115
FIRST FLOOR PLAN - FINISHES SCHEDULE
00-116
ROOF PLAN - FINISHES SCHEDULE
00-117
SECOND BASEMENT FLOOR - REFLECTED CEILING LAYOUT
00-118
FIRST BASEMENT FLOOR - REFLECTED CEILING LAYOUT
00-119
GROUND FLOOR - REFLECTED CEILING LAYOUT
00-120
MEZZANINE FLOOR - REFLECTED CEILING LAYOUT
00-121
FIRST FLOOR - REFLECTED CEILING LAYOUT
00-122
ROOF - REFLECTED CEILING LAYOUT
00-123
RAMP SECTIONS 1 OF 2
00-124
RAMP SECTIONS 2 OF 2
00-125
WALL SECTIONS 1 OF 2
00-126
WALL SECTIONS 2 OF 2
00-127
DOOR & WINDOW SCHEDULE
00-128
DOOR DETAILS & IRONMONGERY SCHEDULE
00-129
ALUMINIUM DETAILS
ARCHITECTURAL DRAWINGS:
00-130
STAIRCASE DETAILS
00-131
LIFT DETAILS
00-132
SUBSTATION DETAILS
00-133
TOILET DETAILS
00-134
PANTRY DETAILS
5
EFTA00803345
Csti architecture interiors
00-140
STANDARD ARCHITECTURAL DETAILS - 1 OF 3
00-141
STANDARD ARCHITECTURAL DETAILS - 2 OF 3
00-142
STANDARD ARCHITECTRUAL DETAILS - 3 OF 3
STRUCTURAL DRAWINGS:
335/S-001
GENERAL NOTES & STANDARD DETAILS
335/S-002
SHORING LAYOUT & DETAILS
335/S-101
FOUNDATION LAYOUT
335/S-102
RAFT SLAB DETAILS
335/S-103
FIRST BASEMENT FLOOR FRAMING LAYOUT
335/S-104
RC DETAILS FIRST BASEMENT FLOOR
335/S-105
GROUND FLOOR FRAMING LAYOUT
335/S-106
RC DETAILS GROUND FLOOR
335/S-107
MEZZANINE FLOOR FRAMING LAYOUT
335/S-108
RC DETAILS - MEZZANINE FLOOR
335/S-109
FIRST FLOOR FRAMING LAYOUT
335/S-110
RC DETAILS FIRST FLOOR
335/S-111
ROOF FRAMING LAYOUT
335/S-112
RC DETAILS ROOF
335/S-113
ROOF MACHINE ROOM FRAMING LAYOUT & DETAILS
335/S-114
COLUMN DETAILS
335/S-115
STAIRCASE DETAILS
335/S-116
RAMP DETAILS & LIFT WALL DETAILS
WATER SUPPLY DRAWINGS :
335/W-001
GENERAL NOTES & STANDARD DETAILS
335/W-101
SECOND BASEMENT FLOOR- WATER SUPPLY LAYOUT
335/W-102
FIRST BASEMENT FLOOR- WATER SUPPLY LAYOUT
335/W-103
GROUND FLOOR - WATER SUPPLY LAYOUT
335/W-104
MEZZANINE FLOOR - WATER SUPPLY LAYOUT
335/W-105
FIRST FLOOR - WATER SUPPLY LAYOUT
335/W-106
ROOF FLOOR - WATER SUPPLY LAYOUT
DRAINAGE DRAWINGS:
335/D-001
DRAINAGE GENERAL NOTES
335/D-101
SECOND BASEMENT FLOOR- DRAINAGE LAYOUT
335/D-102
FIRST BASEMENT FLOOR- DRAINAGE LAYOUT
335/D-103
GROUND FLOOR - DRAINAGE LAYOUT
335/D-104
MEZZANINE FLOOR - DRAINGE LAYOUT
335/D-105
FIRST FLOOR - DRAINAGE LAYOUT
335/D-106
ROOF FLOOR - DRAINAGE LAYOUT
335/D-107
DRAINAGE STANDARD DETAILS
ELECTRICAL DRAWINGS:
3351E-001
ELECTRICAL GENERAL NOTES
3351E-101
SECOND BASEMENT FLOOR- LIGHTING LAYOUT
3351E-102
FIRST BASEMENT FLOOR- LIGHTING LAYOUT
3351E-103
GROUND FLOOR - LIGHTING LAYOUT
3351E-104
MEZZANINE FLOOR - LIGHTING LAYOUT
3351E-105
FIRST FLOOR - LIGHTING LAYOUT
3351E-106
ROOF - LIGHTING LAYOUT
3351E-107
SECOND BASEMENT FLOOR- POWER LAYOUT
3351E-108
FIRST BASEMENT FLOOR- POWER LAYOUT
6
EFTA00803346
C kj
architecture interiors
3351E-109
3351E-110
3351E-111
3351E-112
3351E-113
GROUND FLOOR - POWER LAYOUT
MEZZANINE FLOOR - POWER LAYOUT
FIRST FLOOR - POWER LAYOUT
ROOF - POWER LAYOUT
SINGLE LINE DIAGRAM
TELEPHONE DRAWINGS
335/T-001
GENERAL NOTES
335/T-101
SECOND BASEMENT FLOOR TELEPHONE & CATV LAYOUT
335/T-102
FIRST BASEMENT FLOOR TELEPHONE & CATV LAYOUT
335/T-103
GROUND FLOOR TELEPHONE & CAN LAYOUT
335/T-104
MEZZANINE FLOOR TELEPHONE & CATV LAYOUT
335/T-105
FIRST FLOOR TELEPHONE & CATV LAYOUT
335/T-106
ROOF - TELEPHONE & CATV LAYOUT
FIRE FIGHTING & FIRE ALARM DRAWINGS :
335/F-001
GENERAL NOTES, STANDARD DETAILS & BUILDING SECTIONS
335/F-101
SECOND BASEMENT FLOOR FIRE ALARM LAYOUT
335/F-102
FIRST BASEMENT FLOOR FIRE ALARM LAYOUT
335/F-103
GROUND FLOOR - FIRE ALARM LAYOUT
335/F-104
MEZZANINE FLOOR - FIRE ALARM LAYOUT
335/F-105
FIRST FLOOR - FIRE ALARM LAYOUT
335/F-106
ROOF - FIRE ALARM LAYOUT
335/F-107
SECOND BASEMENT FLOOR- FIRE FIGHTING LAYOUT
335/F-108
FIRST BASEMENT FLOOR- FIRE FIGHTING LAYOUT
335/F-109
GROUND FLOOR - FIRE FIGHTING LAYOUT
335/F-110
MEZZANINE FLOOR - FIRE FIGHTING LAYOUT
335/F-111
FIRST FLOOR - FIRE FIGHTING LAYOUT
335/F-112
ROOF - FIRE FIGHTING LAYOUT
NC DRAWINGS :
00C-001
GENERAL NOTES & STANDARD DETAILS
00C-101
SECOND BASEMENT FLOOR- NC & VENTILATION LAYOUT
00C-102
FIRST BASEMENT FLOOR-NC & VENTILATION LAYOUT
00C-103
GROUND FLOOR - NC & VENTILATION LAYOUT
00C-104
MEZZANINE FLOOR - NC & VENTILATION LAYOUT
00C-105
FIRST FLOOR - NC & VENTILATION LAYOUT
00C-106
ROOF - NC & VENTILATION LAYOUT & EQUIPMENT LAYOUT
00C-107
EQUIPMENT SCHEDULE
7
EFTA00803347
Technical Artifacts (7)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
+971 (0) 50 745 86Phone
3990072Phone
3995153SWIFT/BIC
ADCBAEAAWire Ref
REFLECTEDWire Ref
ReflectedWire Ref
referenceRelated Documents (6)
DOJ Data Set 10OtherUnknown
EFTA01682184
186p
DOJ Data Set 10OtherUnknown
EFTA01370863
1p
Dept. of JusticeOtherUnknown
Medical Record/Clinical Encounter: DOJ-OGR-00026334
This clinical encounter document from the Bureau of Prisons details a medical evaluation of Jeffrey Epstein on July 12, 2019. It covers his medical history, current complaints, and treatment, including discussions around his triglyceride levels, sleep apnea, and back pain. The document was generated by the treating physician at the Metropolitan Correctional Center in New York.
1p
DOJ Data Set 8CorrespondenceUnknown
EFTA00014087
0p
DOJ Data Set 11OtherUnknown
EFTA02367961
1p
DOJ Data Set 10OtherUnknown
EFTA01977826
2p
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.