Skip to main content
Skip to content
Case File
efta-efta00803348DOJ Data Set 9Other

Turkish Hammam & Spa

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00803348
Pages
19
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Turkish Hammam & Spa design propdsal bv PROT0 Turkish Hammam & Spa Proposal of the Hammam complex on the Great Saint James Island TWO DESIGN PROPOSALS design proposal by architecture oft st interiors) V PROT1 Table of Content Hammam & Spa Concept Ideas Existing Reference Island Weather and Location Proposal Option A Plan of Hammam & Spa Option A Hammam Room Corridor Quiet & Rest Room Private Massage Room and Relaxing area Main Entrance Exterior View architecture interiors I Proposal Option B I Plan of Hammam & Spa Option B Hammam Room Quiet & Rest Room and private Massage Room Relaxing Area Main Entrance Exterior View Ct PROT2 Concept Ideas J Existing Reference architecture interiors) V PROT3 Great Saint James Island Weather & Location 160% 90% SO% 7Cr% EL% 50% 40% 1% 10% mostl dandy (la%) 20% 0% Jan (mewl data (.35%) ES% 60% 66% 60% 45% 40% 95% 15% I I E5% ti MJI 75 7Ct% 66% 60% 55% 56% 60% Mat 2 5)% Feb Mee no May An Jul Aug Sep Oct Not Dec Jan Feb Mil Ape Ma) m, Al Aug Sep Oct Not Dec Jan Feb Ms, Age May An Jul frog Sep Oct Nov Dec Cloud cover types (%) 12am gpm 4pm I 2pm tam 430 I 2am Jan Feb Mal Ata May An Jul Aug Sep Oct Na Dec Daily sunrise sunset with twilight (hours of day) 160% SD% 60% 40% 20% 0% Jan Feb Mar Am' Mry An Jul Aug Sep Oct Dec Fraction of time spent in various temperature bands (%) Median cloud cover (%) Jan Feb Mat Apr May Jun Al Aug Sep Ocl Net Dec Relative humidity (%) 40% 35% 3)% 25% 20% 16% 10% 6% 0% Jan 1001111011 atc-zr F.))1I :43,,,,fii..", Feb Mat A. May An Jul Aug Sep Oct SW Dec Dai y high and low temperature (°C) Probability of precipitation at some point in the day (%) qA J _1L)LlLE M., Feb Jan Mat AM May Jun AI Aug Sep ci Son Dec 2% N 111% 3111 1 16% 2% S SW W N.Y 1% 0% 0% NE SE 10 Ms 8 mta m dal, mix 0 mh Jan Feb Mat Apt May Jun Wind speed (m/s) nate la: 10.911Ift: I..: -C4.4C0:40 (lag: CO/CAIM7 tile: 10,a pt-S. 10).52' ".3' Daily hours of daylight and twilight (h) Wind directions over the entire year (%) Sun Path architecture interiors C t FWS dal, rman...." AI Aug Sep No. Dec SAIEerthEnole.one Xs• u No. te 21flevali • 11/11,1,111 PROT4 STEAM ROOM STAFF PART ENTRANCE Option A Option B PRIVATE PART GUEST PART ENTRANCE PRIVATE PART Representing the scattered concept, option A is a composition of different building spaces connected mainly via separate corridors to the main core space: the Hammam. Represents the more compacted space. In contrast with option A, option B is centralized around the relaxing area implementing the traditional flow through Turkish hammam: This option expresses a complex series of walkways through the spaces and embraces many small outdoor greenery spots that can be viewed while moving from one space to another. architecture interiors I e So entering, changing, relaxing to warm up the body temperature, and then moving to the hammam space. This option has mainly one corridor that flows around all spaces with the possibility of controlling the circulation via located doors points. PROT5 Option A • Proposal plan Ass *44 *Yita. .Wk( ciw,%61," ROOMS AREA Hammam 216.50 SQM Relaxing area+terrace 149.30 SQM Private part 177.90 SQM Guest rooms - SQM Pool 322.00 SQM Corridors 52.90 SQM Staff+technical part 90.40 SQM Steam room 36.90 SQM Entrance 36.90 SQM WC+showers - SQM Total floor area 677.00 SQM Total construction area 1082.80 SQM architecture interiors I I e V PROT6 L J---t < \. PROT7 architecture igA & interiors IV PROT8 t 8z Rest Room architectur & interi PROT9 assae Room in Private Part architecture I t & interiors %0 PROT10 PROT11 44 0;4 4 -1 V 4 1.-1 PROT12 Option B Proposal plan ROOMS AREA Hammam 216.50 SQM Relaxing area+terrace 266.00 SQM Private part 177.90 SQM Guest rooms 176.50 SQM Pool 133.40 SQM Corridors 111.50 SQM Staff+technical part 60.50 SQM Steam room 25.80 SQM Entrance 70.50 SQM WC+showers 40.10 SQM Total floor area 1017.80 SQM Total construction area 1278.70 SQM architecture t I interiors .10 PROT13 PROT14 Option B 4et, Main Entra • '^.:7:5:e. r • - ,,Arcoir • !-tart,. -'7 4fre. 44S- -SC • Z4.`,;, '4;1- PROT15 Option B Relaxin architecture i " l oo & interiors V A PROT16 Option B 4> Quiet & Peace Room PROT17 architecture I e t interiors Siso PROT18

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefReference

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.