Skip to main content
Skip to content
Case File
efta-efta00805000DOJ Data Set 9Other

LSJ and GSJ Schedule

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00805000
Pages
18
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
LSJ and GSJ Schedule 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2S 26 27 28 29 Ms I GSJ Protects: North Terrace Collect EB Bids Site Work Underground Electric Wire Mesh / Rebar for Pad Concrete Pour 200 Yards Saw Cuts and Sealing Sign Off work Up to Standards) RO RO Sea Water Intake Pumps RO Genset Bunker Refurbish / Extend Q Hut Staff Cottage Refurbish / Expand SC New Cistern / Septic Tank SC Kitchen Cabinets Barge Ramp Main House Septic Tank Back of House Area Dumpster / Dump Area LSJ Projects: Create Concrete Batch Plant Source of Agg Source of Cement Source of sand Location of plant Duration Start Finish 08/06/18 08/14/18 smartsheet Aug 08/15/18 09/03/18 09/04/18 09/07/18 09/10/18 09/11/18 09/12/18 09/12/18 09/13/18 09/17/18 09/18/18 09/18/18 Aug 5 Aug 12 Sep 2 Sep 9 Exported on August 6, 201812:38:10 PM PDT Page 1 of 18 EFTA00805000 i 6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 2 of 18 EFTA00805001 Task Name 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 Mix designs on file Rebar / Wire / Angles Main Compound Pool Planter Pool Shelter Master Bedroom Seal exterior walls New roof Extend terrace Remove step Remove and install threshold Refinish floors New Shower Hardware Repair Shower (new HW) 71? Refinish Shower Floors Septic/Drain Issues Library Seal exterior walls New Roof Install Exterior Lighting Replace Windows New Door 11W Main Kitchen Seal exterior Walls Resurface Cabinets Appliances Roof Structure Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Exported on August 6. 2018 12:38:10 PM PDT Page 3 of 18 EFTA00805002 i6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 4 of 18 EFTA00805003 Task Name Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 Ellis Toe board and Side Panels on Cabinets Gym Seal Exterior walls Replace doors Replace Windows Bathroom Renovation Flag Pool Cabana Remove Coral Stone Install Wood Floors Demo / Construct new Shelter Tile Roof Pool Refurbishment Kitchen Remodel I Cabana 1 Seal exterior Walls Install Thresholds Install Doors Enclose Outside Shower Rough Plumbing Fixtures Tile Cabinets Countertops Electrical Repaint Resurface Floors Move in Exported on August 6, 2018 12:38:10 PM PDT Page 5 of 18 EFTA00805004 i6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 6 of 18 EFTA00805005 Task Name 92 93 94 9S 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 Cabana 2 Seal exterior Walls Install Thresholds Install Doors Enclose Outside Shower Rough Plumbing Fixtures Tile Tile Showers Cabinets Countertops Electrical Repaint Resurface Floors Move In I Cabana 3 Seal exterior Walls Install Thresholds Install Doors Enclose Outside Shower Rough Plumbing Fixtures Tile Tile Showers Cabinets Countertops Electrical Repaint Repair Bathroom Floor Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Exported on August 6. 2018 12:38:10 PM PDT Page 7 of 18 EFTA00805006 i6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 8 of 18 EFTA00805007 Task Name 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 Resurface Floors Move in Cabana 4 Seal exterior Walls Install Thresholds Install Doors Enclose Outside Shower Rough Plumbing Fixtures Tile Cabinets Countertops Electrical Repaint Resurface Floors Move in Chilax Room Seal exterior walls Install thresholds Install Door Seal / Abandon Poolside Door Trey Ceiling Design / Build New AC Repaint Grass Beds Main Compound Demo / Straighten Electrical Demo Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Exported on August 6, 2018 12:38:10 PM PDT Page 9 of 18 EFTA00805008 i6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 10 of 18 EFTA00805009 Task Name 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 Tiki House Finish ceilings Kitchen Area renovation Flooring / Electrical / Plumbing Larger Stone Apron Front Lighting Dock Shelters Cabinets/ Countertops / Lighting Lighting / Purchase Decking Small dock Shelters Railing Planters / Plumbing / Electric Pour Apron Barge Ramp Temp Ramp New Ramp Deadman Piles onshore with Eye Possible underwater excavation Roads Roads to be redragged Light Excavation Pops Garden New Shade house? Run new Electric Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Exported on August 6, 2018 12:38:10 PM PDT Page 11 of 18 EFTA00805010 i6 Sep 23 Exported on August 6.2018 12:38:10 PM PDT Page 12 of 18 EFTA00805011 185 Task Name Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Generator Building 186 New Doors and Hardware 187 Gen 1 Refurb 188 Gen 2 Refurb 189 Fuel Tank Vent Lines 190 Fuel Room Fire Caulking 191 192 RO Building 193 Minor Hardware replacement 194 New Door Hinges 195 196 Engineering Building 197 Demo / Construct new Building 198 199 Laundry Facility 200 Kitchen and Bath Refurb 201 ^ Laundry Remodel 202 203 Pebble Beach 204 Fishermans Hut 205 New Foundation Pad 206 207 208 209 210 211 212 213 214 215 Site work Five Palms New Roof Light Site Work New Windows New Doors New electric / Feader line Nursery Exported on August 6, 2018 12:38:10 PM PDT Page 13 of 18 EFTA00805012 : 6 Sep 23 Exported on August 6. 2018 12:38:11 PM PDT Page 14 of 18 EFTA00805013 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 23S 236 237 238 239 240 241 242 243 244 245 246 Task Name Duration Start Finish replace wood stairs concrete patching painting Staff Bathrooms / Gas Station Doors and Hardware replace Window Replacement Plumbing issues Concrete Sewage Treatement Overflow Equlptment 325 FL 307 E2 TL12SSD 27202 Boom Lift Flat bed Dump truck Light towers John Deer Tractor Beach Cleaner Marine Nana Nautica Little C Sportis PDR Zodiac Mini Me 2 Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep Exported on August 6. 2018 12:38:II PM PDT Page 15 of 18 EFTA00805014 i6 Sep 23 Exported on August 6. 2018 12:38:11 PM PDT Page 16 of 18 EFTA00805015 Task Name Duration Start Finish Aug Sep Jul Aug 5 Aug 12 Aug 19 Aug 26 Sep 2 Sep 9 Sep 242 Jet Skis Exported on August 6. 2018 12:38:11 PM PDT Page 17 of 18 EFTA00805016 i6 Sep 23 Exported on August 6. 2018 12:38:11 PM PDT Page 18 of 18 EFTA00805017

Technical Artifacts (2)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire RefRefurbish
Wire RefRefurbishment

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.