Skip to main content
Skip to content
Case File
efta-efta00805018DOJ Data Set 9Other

JPK DEVELOPMENT

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00805018
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JPK DEVELOPMENT RESIDENTIAL AND COMMERCIAL CONSTRUCTION 6501 RED HOOK PLAZA SUITE 201, ST THOMAS 00802 340 643 3245 EMAIL TO: LSJ FOR: CONSTRUCTION COSTS TO REBUILD DOCK STRUCTURES SCOPE: STRUCTURE AT DOCK/SHORE LANDING (SHELTER 2) 1. Clean out form and place rebar in 8 new footings dug buy LSJ equipment 2. Cast footings --- post bases and concrete provided by LSJ 3. Install 8 8x8 posts planed and prepped by JPK --- posts provided by LSJ 4. Install pressure treated 3 x12 beam through bolted to columns with 5/8 stainless rod 5. Install 3x10 hips and 3x12 ridge beam 6. Install 3x8 rafters 2' oc. through bolted to 3x12 ring beam 7. Install 2x12 facia 8. Install collar ties as depicted in drawing 9. Roof to be 6:12 pitch constructed as planed with stainless fasteners 10. Lumber to be pressure treated lubber #1 quality provided by LSJ 11. JPK will provide invoice from supplier for LSJ to pay for items that are not in the island inventory 12. Install 1x6 pre varnished Cyprus (prepared by LSJ painters) 13. Install layer of/. treated ply with 3.5 "stainless fasteners 6" oc 14. Install ice and water shield 15. Install thatch roofing 16. Install 4 railing sections to match original 17. Maintain a clean work site 18. Adhere to all OSHA safety regulations and local building codes 19. JPK will provide labor only for this work 20. JPK will provide shop drawings as required by LSJ 21. Painting to be done by LSJ staff 22. Stone paving not included in price Sub-total $35,200.00 Overhead and profit $5,280.00 GRT $2,024.00 Total cost $42,504.00 EFTA00805018 SCOPE: shelter 1 at far end of dock 1. Rebuild dock as depicted in pictures with LSJ provided materials 2. Set 8 8x8 posts in LSJ provided stainless brackets 3. Through bolt 3x12 ring beam to post with 5/8 stainless rod 4. Construct roof at LSJ desired pitch bolting 3x8 rafters through 3x12 ring beam 5. Install 1x6 TxG Cyprus over 3x8 rafters 6. Install '''4 ply wood over Cyprus 1x6 7. Install ice and water shield 8. Install thatch roof material over ice and water shield 9. Construct sundeck with 3x10 wood joist 10. Install 2x6 LSJ pre painted decking with stainless fasteners 11. Construct wood rail to match employee cottage 12. Spiral staircase TBD 13. Painting by LSJ painters 14. Materials provided by LSJ --- arranged for purchase by JPK as needed 15. Labor by JPK 16. Drawings created by JPK 17. JPK will maintain a clean work site 18. JPK will adhere to OSHA safety practices Sub-total $48,500.00 Overhead and profit $7,275.00 GRT $2,788.75 TOTAL COST $58,563.75 LSJ assumes any government fines associated with building if a permit is not attained Cost of permitting not included if LSJ desires to put in for one ---- EFTA00805019

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone340 643 3245

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.