Skip to main content
Skip to content
Case File
efta-efta00807990DOJ Data Set 9Other

DS9 Document EFTA00807990

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00807990
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 Construction Proposal January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: Prepare and grade existing sub base Eradicate and remove weeds and organic material from existing sub base. Compact sub base to insure stability Spread and compact 3 inches of owner-supplied aggregate base material Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: LSJ will remove, secure, and replace all stone and other border edges. LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. Aggregate base will be supplied by owner. Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $716,500.00 Little St. James Island Paving Page I of 2 EFTA00807990 Construction Proposal Project Table: Name Description Portland Cement Concrete Pavement Excavation and Sitework Credit 4-inch reinforced pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 13.000 561.00 S.Y. $793,000.00 13.0(X) 515AX) S.Y. $37,500.00 1 -S114.000.00 L.S. 4114,000.00 Total Base Price $716,500.00 Option Drainage Measures: As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18. 2014. Concrete Swales Described above 32 51.064M0 EA 534.048.00 Aggregate Base Described above 32 5181.00 EA S5.824.00 Pad Rip Rap Detention Described above 32 5202.00 LA 56.464.00 Area Options Total $46,336.00 Little St. James Island Paving Page 2 of 2 EFTA00807991

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.