Construction Proposal

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00807988
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 September 12, 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI Little St. James Island, VI SCOPE OF WORK: Prepare and grade existing sub base Eradicate and remove weeds and organic material from existing sub base. Compact sub base to insure stability Spread and compact 3 inches of aggregate base material Place new 3•inch reinforced Portland cement concrete pathway, mimimum 4=inch pavement is recommended for vehicular and equipment traffic. Concrete will be a minimum 4,000 PSI. SPECIAL CONDITIONS: LS] will remove, secure, and replace all stone and other border edges. LS] will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. Aggregate base will be supplied by owner. Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. Amount of $114,000.00 will be credited to owner on behalf of Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re•Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $712,586.00 Little St. James Island Paving Page I of 2 EFTA00807988 Construction Proposal Project Table: Name Description Quantity Unit Cost Unit Total Cost Portland Cement Concrete Pavement 4-inch reinforced pathway 13.0(X) 547.(x) $611,000.00 Excavation and Sitework 3-inch course aggregate base material. 13.000 SI 3(X) $169,250.00 Credit Intervention amount on behalf of Betteroads Asphalt LLC 1 -S114.000.00 L.S. 4114,000.00 Total Paving $666,250.00 Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. Concrete Swales Described above 32 51.064.00 EA $34.048.00 Aggregate Base Pad Described above 31 S182.00 EA S5.824.00 Rip Rap Detention Area Described above 31 $202.00 EA 56.464.00 Total Drainage Measures $46,336.00 Total Costs Little St. James Island Paving 5712.586.00 Page 2 of 2 EFTA00807989

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.