Construction Proposal
Quantum Vision Construction LLC
8168 Crown Bay Marina
Suite 505 PMB 260
St. Thomas, VI 00802
January 21', 2018
Owner: LSJE
Project:
Asphalt Pathways Paving Works
Little St. James Island, VI
SCOPE OF WORK:
•
Prepare and grade existing sub base
•
Eradicate and remove weeds and organic material from existing sub base.
•
Compact sub base to insure stability
•
Spread and compact 3 inches of owner-supplied aggregate base material
•
Apply Tack Coat prior to asphalt concrete placement
•
Place new 2-inch asphalt concrete pathway
Little St. James Island, VI
SPECIAL CONDITIONS:
•
LSJ will remove, secure, and replace all stone and other border edges.
•
LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island.
•
Aggregate base will be supplied by owner.
•
Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a
part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor
will not be responsible for replacement of these damaged areas while implementing normal construction procedures.
•
Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC.
OPTIONS (NOT INCLUDED IN BASE PRICE):
•
As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September I&
2014.
TOTAL BASE PRICE:
$351,000.00
•Total Base Price is based on Quantum Vision Construction LLC's procurement of its own asphalt concrete producing plant.
Little St. James Island Paving
Page I of 2
EFTA00809853
Construction Proposal
Project Table:
Name
Asphalt Concrete
Paving
Excavation and
Sitework
Credit
Description
2-inch pathway
3-inch course using owner
supplied aggregate base
material.
Intervention amount on behalf
of Betteroads Asphalt LLC
Quantity
Unit Cost
Unit
Total Cost
1.500
$285.00
S-327.5oo.(x)
13000
515.(10
S37.500.00
-SI14.000.00
L.S.
-S114.(1410.00
Total Base Price
$351,000.00
Options
Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project"
and dated September 18. 2014.
Concrete Swales
Described above
32
$1.064.410
EA
534.048.1K)
Aggregate Base
Described above
32
$182.00
EA
55.824.00
Pad
Rip Rap Detention
Described above
32
$202.00
EA
56.464.00
Area
Options Total
$46,336.00
Little St. James Island Paving
Page 2 of 2
EFTA00809854
Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.