Skip to main content
Skip to content
Case File
efta-efta00809855DOJ Data Set 9Other

Construction Proposal

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta00809855
Pages
2
Persons
0
Integrity

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 January 21', 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI SCOPE OF WORK: Prepare and grade existing sub base Eradicate and remove weeds and organic material from existing sub base. Compact sub base to insure stability Spread and compact 3 inches of owner-supplied aggregate base material Apply Tack Coat prior to asphalt concrete placement Place new 4-inch reinforced Portland cement concrete pathway Little St. James Island, VI SPECIAL CONDITIONS: LSJ will remove, secure, and replace all stone and other border edges. LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. Aggregate base will be supplied by owner. Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $716,500.00 Little St. James Island Paving Page I of 2 EFTA00809855 Construction Proposal Project Table: Name Portland Cement Concrete Pavement Excavation and Sitework Credit Description 4-inch reinforced pathway 3-inch course using owner supplied aggregate base material. Intervention amount on behalf of Betteroads Asphalt LLC Quantity Unit Cost Unit Total Cost 13.0(X) 561.00 S.Y. 5793.000.00 13.0(X) 515.00 S.Y. $37.500.00 -$114.000.00 -5114.000.00 Total Base Price $716,500.00 Option Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September 18, 2014. Concrete Swales Described above 32 S1.064.00 EA $34.048.00 Aggregate Base Described above 32 S182AM EA 55.824.00 Pad Rip Rap Detention Described above 32 S202.00 EA 56.464.09 Area Options Total $46,336.00 Little St. James Island Paving Page 2 of 2 EFTA00809856

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.