Case File
efta-efta01093171DOJ Data Set 9OtherDS9 Document EFTA01093171
Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01093171
Pages
2
Persons
0
Integrity
No Hash Available
Extracted Text (OCR)
Text extracted via OCR from the original document. May contain errors from the scanning process.
SPX.
COOLING TECHNOLOGIES
Proposal to:
Project
ZORO RANCH (BRYCE)
ZORO RANCH
49 ZORRO RANCH RD
STANLEY, NM
STANLEY, NM 87056
Engineer:
Opportunity I Oucte No. (Ver) Chuck Espinosa_120710_10301549) / Chuck Espinosa_120710_104427456 (I)
Rep Quote No.
Marley Aquatower
James Cooke & Hobson Inc
3810 Acingori Pkwy $o N
EROUS NM 871094453
Feb25, 2013
TOWER MODEL
PERFORMANCE
CONDITIONS
MOTOR DATA
TOWER DIMENSIONS
WEIGHTS
Quantity of (1) Marley
Per 1-cell tower
NEMA 3 HP 1 speed /1
Each cet (Wehout options)
Per at
Aquatower model
265 gpm
wind
Length
5' - 11 1/2"
Shippey:
1.043 lb
AC14931110AF factory
95 'F Not Water
3 phase /60 Hz/ 200v
Width
5' - 1•
Operattg:
2.056 lb
assembled 1-Cell
85"F Cold Water
1.15sf/ TEFC
Height
T - 4 yr
aossflow cooling tower
83'F Entering WB
1800
Per 1-cell tower
Per 1-cee lower (wth options)
Shipping;
1.0431b
Length
6-111/2"
Operating:
2056 of
Width
5' - 1"
Height
T - 4 1/2"
Ovontities shown ['clown per cult
Base Tower ConstructionlEquIpment
Galvanized Steel casing.
Galvanized Steel structure.
Galvanized Steel collection basin.
Galvanized Steel distnbution basin.
Structure and anchorage designed for wind load of afto pst (7.2 kPa).
Marley designed belt drive.
Marley designed and manufactured 15 mil PVC Nm fill with integral louvers and drift eliminators.
Oral rate guaranteed to be no greater than .005% of the design flow rate.
CTI certification per STD-201.
Collection Basin Connections and Accessories:
(1)4 in (102 mm) diameter side suction outlet per cell with trash screen for pump flow applications.
(1) 6 in (152 mm) diameter bottom outlet per cell with trash screen. (can be used as a gravity flow outlet when used in combination with
the plug provided for side suction; can also be used as an equalizer)
(1) 2 in (51 mm) diameter drain with separate 2 in (51 mm) diameter overflow In each cell.
(1) % inch (19 mm) water make-up float valve in each cell.
(1) Component electric immersion heater system for freeze protection of the collection basin during cold weather system shutdown.
Distribution Basin Inlet
(1)4 in (102 mm) diameter top inlet connection in each cell.
Maintenance 8 Maintenance Access Features:
Tower is designed in accordance with OSHA safety standards.
CN cup
Air inlet screens
Control Systems:
(1) shop installed control panel per cell
Can-Do NEMA 3R
Page 1 of 6
EFTA01093171
srax
COOLING TECHNOLOGIES
James Cooke & Hobson Inc
3810k:edam/ Play SoN E
NM 871(84453
Field Installed Equipment:
The field installed portion of the equipment will require approximately 6.5 man-hours of installation time after the tower arrives at the
lobsite (based on USA experienced crew). The price to instal these components is NOT included in the total price.
Labor Priding for final field assembly of above
S inner)
S
Total Sell Price
(US Dollar)
$
(Freight included. Installation labor not Included. Taxes not included.)
Payment Terms: NET 30 days from date of shipment (subject to credit approval)
Freight Terms: F.O.B. SPX plant(s) Olathe. Kansas. USA with freight prepaid via dosed van
Shipment Lead•Ti me After Drawing Approval: 30 buSine,ss days
The following options are offered for your consideration:
Arernate Adder-
(1) . Aquatower (Stainless Steel Model)
5.188.00
\‘.
1,300.00
17.521.00
Notes:
•
Any purchase orders should be made out to SPX Coding Technologies.
•
This Is a proposal and not a contract When signed by the Purchaser In the space provided below, this form wilt be considered a purchase
order from the Purchaser to SPX Coding Technologies ("SPX Cooling"). Purchaser's order b not binding on SPX Cooling until the order is
accepted by SPX Coding a indicated by a signature of an ()Matey authorized employee of SPX Cooling in the space provided below. The
SPX Cooling Sales Representative providing this proposal has no authority to bind SPX Coding to any contract, or contract terms or
conditions in contradiction to those stated herein.
•
Offer to purchase Is valid for thirty (30) days from the proposal date. Shipment must be made within ninety (90) days of original purchase date.
For requested shipments beyond ninety (90) days, pricing must be approved prior to receipt of order.
•
An sales. use or excise taxes payable by SPX Coding. Or to be cdleded by SPX Cooing from Purchaser. in connection with the sale, installation, or use
of the proposed equipment shall be added to the prima quoted above at time or shOnent Any purchase order submitted fixates exerrpt project must
be accompanied by the Purchasers vatd tax exemption certificate for the state to which the goods we to be delivered. n is the PurChasers responsibility
to provide Gus documentation. SPX Cooling we not be liable for any failure of Purchaser to pay sates tax without said documentabon.
•
SPX Cooling's responsokty for delivery is fanned to date of shipment Cattier can be requested to give a maximum of 24 hods notice of delivery.
Shipments involving more than one trod( may arrive at a job see at Cielerenl times
•
Purchaser to receive. unload, haul. hoist and set tower(s) in place.
•
SPX Cooling hereby warrants the inclusion of tabor, when speoficaity purchased as an option. Labor coverage shall be banked to the specified duration
(as indicated by the option purchased) beginning at date of shipment by SPX Cooing to the original installation.
•
This proposal is made expressly conditional upon purchaser's acceptance of SPX Cooling's Standard Terms and Conditions. and the
applicable SPX Coding Standard Warranty Certificate. These document: are attached. No terms or conditions, including warranty provisions,
that are submitted by Purchaser as part of its acceptance shall be valid, and all such terms are hereby expressly objected to and shall have no
*fleet
Chuck Espinosa
Accepted by (see note above)'
Representative
Printed Name
Purchaser
SPXCooing Techndogles
Printed Name
Printed Name
Title
Title
The
EFTA01093172
Technical Artifacts (1)
View in Artifacts BrowserEmail addresses, URLs, phone numbers, and other technical indicators extracted from this document.
Phone
4427456Forum Discussions
This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.
Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.