Skip to main content
Skip to content
Case File
efta-efta01093171DOJ Data Set 9Other

DS9 Document EFTA01093171

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01093171
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
SPX. COOLING TECHNOLOGIES Proposal to: Project ZORO RANCH (BRYCE) ZORO RANCH 49 ZORRO RANCH RD STANLEY, NM STANLEY, NM 87056 Engineer: Opportunity I Oucte No. (Ver) Chuck Espinosa_120710_10301549) / Chuck Espinosa_120710_104427456 (I) Rep Quote No. Marley Aquatower James Cooke & Hobson Inc 3810 Acingori Pkwy $o N EROUS NM 871094453 Feb25, 2013 TOWER MODEL PERFORMANCE CONDITIONS MOTOR DATA TOWER DIMENSIONS WEIGHTS Quantity of (1) Marley Per 1-cell tower NEMA 3 HP 1 speed /1 Each cet (Wehout options) Per at Aquatower model 265 gpm wind Length 5' - 11 1/2" Shippey: 1.043 lb AC14931110AF factory 95 'F Not Water 3 phase /60 Hz/ 200v Width 5' - 1• Operattg: 2.056 lb assembled 1-Cell 85"F Cold Water 1.15sf/ TEFC Height T - 4 yr aossflow cooling tower 83'F Entering WB 1800 Per 1-cell tower Per 1-cee lower (wth options) Shipping; 1.0431b Length 6-111/2" Operating: 2056 of Width 5' - 1" Height T - 4 1/2" Ovontities shown ['clown per cult Base Tower ConstructionlEquIpment Galvanized Steel casing. Galvanized Steel structure. Galvanized Steel collection basin. Galvanized Steel distnbution basin. Structure and anchorage designed for wind load of afto pst (7.2 kPa). Marley designed belt drive. Marley designed and manufactured 15 mil PVC Nm fill with integral louvers and drift eliminators. Oral rate guaranteed to be no greater than .005% of the design flow rate. CTI certification per STD-201. Collection Basin Connections and Accessories: (1)4 in (102 mm) diameter side suction outlet per cell with trash screen for pump flow applications. (1) 6 in (152 mm) diameter bottom outlet per cell with trash screen. (can be used as a gravity flow outlet when used in combination with the plug provided for side suction; can also be used as an equalizer) (1) 2 in (51 mm) diameter drain with separate 2 in (51 mm) diameter overflow In each cell. (1) % inch (19 mm) water make-up float valve in each cell. (1) Component electric immersion heater system for freeze protection of the collection basin during cold weather system shutdown. Distribution Basin Inlet (1)4 in (102 mm) diameter top inlet connection in each cell. Maintenance 8 Maintenance Access Features: Tower is designed in accordance with OSHA safety standards. CN cup Air inlet screens Control Systems: (1) shop installed control panel per cell Can-Do NEMA 3R Page 1 of 6 EFTA01093171 srax COOLING TECHNOLOGIES James Cooke & Hobson Inc 3810k:edam/ Play SoN E NM 871(84453 Field Installed Equipment: The field installed portion of the equipment will require approximately 6.5 man-hours of installation time after the tower arrives at the lobsite (based on USA experienced crew). The price to instal these components is NOT included in the total price. Labor Priding for final field assembly of above S inner) S Total Sell Price (US Dollar) $ (Freight included. Installation labor not Included. Taxes not included.) Payment Terms: NET 30 days from date of shipment (subject to credit approval) Freight Terms: F.O.B. SPX plant(s) Olathe. Kansas. USA with freight prepaid via dosed van Shipment Lead•Ti me After Drawing Approval: 30 buSine,ss days The following options are offered for your consideration: Arernate Adder- (1) . Aquatower (Stainless Steel Model) 5.188.00 \‘. 1,300.00 17.521.00 Notes: Any purchase orders should be made out to SPX Coding Technologies. This Is a proposal and not a contract When signed by the Purchaser In the space provided below, this form wilt be considered a purchase order from the Purchaser to SPX Coding Technologies ("SPX Cooling"). Purchaser's order b not binding on SPX Cooling until the order is accepted by SPX Coding a indicated by a signature of an ()Matey authorized employee of SPX Cooling in the space provided below. The SPX Cooling Sales Representative providing this proposal has no authority to bind SPX Coding to any contract, or contract terms or conditions in contradiction to those stated herein. Offer to purchase Is valid for thirty (30) days from the proposal date. Shipment must be made within ninety (90) days of original purchase date. For requested shipments beyond ninety (90) days, pricing must be approved prior to receipt of order. An sales. use or excise taxes payable by SPX Coding. Or to be cdleded by SPX Cooing from Purchaser. in connection with the sale, installation, or use of the proposed equipment shall be added to the prima quoted above at time or shOnent Any purchase order submitted fixates exerrpt project must be accompanied by the Purchasers vatd tax exemption certificate for the state to which the goods we to be delivered. n is the PurChasers responsibility to provide Gus documentation. SPX Cooling we not be liable for any failure of Purchaser to pay sates tax without said documentabon. SPX Cooling's responsokty for delivery is fanned to date of shipment Cattier can be requested to give a maximum of 24 hods notice of delivery. Shipments involving more than one trod( may arrive at a job see at Cielerenl times Purchaser to receive. unload, haul. hoist and set tower(s) in place. SPX Cooling hereby warrants the inclusion of tabor, when speoficaity purchased as an option. Labor coverage shall be banked to the specified duration (as indicated by the option purchased) beginning at date of shipment by SPX Cooing to the original installation. This proposal is made expressly conditional upon purchaser's acceptance of SPX Cooling's Standard Terms and Conditions. and the applicable SPX Coding Standard Warranty Certificate. These document: are attached. No terms or conditions, including warranty provisions, that are submitted by Purchaser as part of its acceptance shall be valid, and all such terms are hereby expressly objected to and shall have no *fleet Chuck Espinosa Accepted by (see note above)' Representative Printed Name Purchaser SPXCooing Techndogles Printed Name Printed Name Title Title The EFTA01093172

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Phone4427456

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.