JE Punch List —August 30, 2012 Directive Updates

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107275
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
JE Punch List —August 30, 2012 Directive Updates 1. Clean Up - make as many barge runs as necessary 2. Equipment and Vehicles - Sell equipment - No machinery off the island unless approved - New seats for gators and pro gators — Karen will order 8/30 - Remaining 2 Queen Seats will be delivered to Tropical for shipping by 9/14 3. Computers - Per JE, refurbish old units —Jermaine — COMPLETED — will deliver to LSJ 8/31 - 25 inch I Mac from NYC— for Captain's Office — Jermaine to bring to FTC to clean up — 8/31 4. Five Palms - Exterior Door Shutters — ordered — Rich/Daphne will contact vendor for delivery date - Painting - outside to be completed via JE direction - Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues - Picture Frame — measurements forwarded to Sarah - 86 x 70 - Mirrored siding — section that flew off in storm has been reglued - COMPLETE - Piano — retune in October 5. Grotto - Curtains — installed - Mattress cover — JE approved buying fabric, making cover locally - Genset wiring — COMPLETE — Electronic Remote Starter, auto start from Kite House - Danny ordering online 8/30 6. Berm/Top of Hill - Hydroseed inside — complete - Hydroseed outside — will need to review progress 7. Triangle - - Must design triangle — awaiting JE direction 8. Flagpole Pool Cabana - - Furniture — desk from Paris ready to ship early September - Sue 9. Floating Dock - Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution check out tables - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details - Ladder - redo 10. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 11. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 12. Mechanical Building Transformer — at Tropical FL 8/31 13. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at Subbase — work began 8/28 — in progress - Little C — engine at Offshore 8/29 — installation complete by 9/4 14. Timers - Review installing timers on air conditioners, irrigation water systems, and lights - Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees - Irrigation — depending on rainfall EFTA01107275 15. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach — Danny will begin on 9/10, completion by 9/21 16. Transient Surge Protection — estimate will be forwarded by 8/31 17. Landscaping - Pop's Garden — need deer fencing, or some other method of protection — Peter by 9/7 - Cut grass, acacia — owner's drive, blue beach, stone walls, gym - Peter to clean the sides of the road by 9/7 18. Roads - - Priority is Gym road grading — Jules - Jules to line the service road with boulders 19. Library - Lights on bookshelves need attention — Danny will begin on 9/4, completion by 9/6 20. New Employee Bathrooms 21. Gym - New punching bag — on site — installation after JE visit - Subwoofer — torn or blown — Scott to research a replacement speaker — Larry ordered the part it's being shipped to NYC - estimate install by Sept. 7-10 (Scott's update as of 8/30) - Clean gutters — COMPLETE - Windows in the ballet room need repair to both cranks and panes 22. Beach Office - complete electrical overall required - waterproofing/sealing/painting/replace rotten wood required 23. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response 24. Hangar - Fuel Containment Pad — draft approved with drainage incorporated — the surveyor just went out this week to do the survey. He will send it to the architect so he can complete the plan. (Cecile's update as of 8/30) 25. Main compound - Wind doors to the east are inoperable — change hinges - on site - Lights — Danny has reviewed all the lights — as of date all are up and running — there are still some missing bulbs, which will be addressed as time allows - Acid Washing of lanterns — complete by 8/31 26. New waste bins — (2) 20 yard bins on LSJ - final installation 8/31 27. Yellow Nap House — to be demolished by Peter with the trackhoe by 9/5 28. Blue Nap House — replace and repair shingles 29. Steel shed — the vendor to confirm to Carlos if they can travel to LSJ to erect the shed, and if they can complete the erection within 3 weeks — 8/31 30. Equipment to be Purchased — (2) lights, (1) skid steer, (1) John Deere box and blade, (1) man-lift, (1) golf cart, (1) dump truck with a 5th wheel EFTA01107276

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.