Punch List — May 1, 2012

Date
Unknown
Source
DOJ Data Set 9
Reference
efta-efta01107296
Pages
2
Persons
0
Integrity
No Hash Available

Summary

Ask AI About This Document

0Share
PostReddit

Extracted Text (OCR)

EFTA Disclosure
Text extracted via OCR from the original document. May contain errors from the scanning process.
Punch List — May 1, 2012 1. Flagpole Pool Cabana - - Recovering of sofa/chairs - to be completed via JE direction in May - Furniture - review another piece of furniture — Sarah - Lighting - more down lights 2. Main Compound - - Landscaping — purchase goat's foot vine on hillside —investigating options/price forwarded 5/4 - purchase Bougainvillea (bright red) for Basket; fill in front of basket with more dirt - repairing of coral stone deck areas - coral stone thresholds in guest rooms need to be cut 3. Five Palms- - Electrical/Phone/Data — reviewing in house option — Pull Boxes - Floor - material on site 4/25 - Exterior Door Shutters - require JE approval - Interior Doors —due on site 5/21 - Painting —final outside coat to be completed once all work is finished - Waterproofing - Outside coral stone seat — completed expected 5/4 - Fire Pit —fire box requires design and manufacturing - Molyneux Canvas — to be placed on stretcher/backed and installed to ceiling, boarded with cornice molding (approx 6 to 8 inches wide) & painted white - Bill Adams - Furniture — X 2 cannonball lamps, bronze lamp —on site - Mirror due on site 5/3 - Sofa — purchase - JE to review old rug, 4/30 - Built in Cabinets/shelves — to be completed by Bill — Hinges due NYC 4/30 (Karen will bring down) - Landscaping — level dirt - continuing — Relocate grasses — continuing - Lights— outside light boxes on back and front walls to be covered over - Light parrots and building — from roof line (rectangular 24 X10) - Desk — picked up by International Freight Logistics — will be crated before delivering to Tropical Shipping — Rich B is getting costs and dates - Mirrored siding — due on site 5/7 - Framed Photos — JE to review 4/30 4. Grotto - - Pavilion — painting to begin 5/1 - white - Landscaping — more dirt required on left hand side as you look down, then hydroseed - Shutters/generator doors/storage doors — ??? S. Hangar — - Concrete Floor - grinding ongoing - Painting — interior paint selected painting floor — completion 5/3 — delayed due to power issues - Silver Polaris - from LSJ relocated to hanger, purchase new vehicle for LSJ 6. Steel Shed — ABC Concepts proposal forwarded to JE 4/24 — redesign in process 7. Triangle — needs to be reconfigured, with more dirt on top and less around base - more concrete required around edge - additional road 8. Entry Tree Lights — lights on site 9. Solutions for Generators — Sound proofing solution forwarded to JE, require direction EFTA01107296 10. Top of hill — CLEAN UP — remove rocks - ongoing, and hydroseed 11. Tiki - Shields — ETA mid May 12. Sunken Garden Berm —crusher runs - place inside berm area - 4 large planter boxes with small planter inside require construction — size to be determined by JE 13. Engineering—Clean Up —area needs to be leveled and metal shed to be laid out - Landscaping — planting Sea grape 14. New vehicles — two more Polaris bikes (800's) — Larry/Brice 15. Dock — - Entry— redo entry — Brice to source dock wood locally - Decking - discuss pressure treated timber/carpeting - Floating Dock— design required - Jet ski Docking - review - Table— final size/design to be determined — coral stone top — Bill - Old floating dock — moved to engineering, requires redesigning 16. Mooring Permit — estimate to place anchors forwarded to JE 4/10 - awaiting direction 17. Telephone system — remove/add speed dial — awaiting programming disc — due 5/1 18. Gates - Thatch needs to be applied to lower gates — both to be painted 19. Guest House at Beach 3 — sited, needs to be roughed out — start 4/21 20. Kite House — review of wooden outside furniture - Sarah 21. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 22. Chilax Bathroom - requires blue rugs for bathroom & vanity area - Sarah 23. Mechanical Building - Replacement Transformer — approved to purchase, forwarded to Rich K, who has requested an E Mail from JE with approval 24. Boats - Midnight Express — 4/2 approved to purchase Yamaha 300 motors, to be installed by Off Shore Marine - ship existing motors to FL, LV to sell — shipping 5/1 - PRD— sell - Lady G — sell - Big N - sell - Calypso — refurbish 25. Sundial — 26. Hydro seeding— as much as possible especially when it rains 27. Gym Road - road material & holes in stone wall need to be added for water drainage — work continues 28. Outside Master Bedroom — banana Plantation area requires tidying up — 4/30 - bedroom door to outside to be adjusted and lock added 29. Entry basket — bougainvillea to be purchased for Basket and dirt added in the front 30. Nautilus (Main courtyard) area - requires cement band to continue 31. Relocate Tom's Trailer — area to be used for employee bathrooms 32. Move beach trees 33. Compass—hydroseed — 4/30 34. Sombrero ramp 35. Landscaping— bananas and bougainvillea 36. Timers, air water lights *6ft grader - Jules EFTA01107297

Technical Artifacts (1)

View in Artifacts Browser

Email addresses, URLs, phone numbers, and other technical indicators extracted from this document.

Wire Refrefurbish

Forum Discussions

This document was digitized, indexed, and cross-referenced with 1,400+ persons in the Epstein files. 100% free, ad-free, and independent.

Annotations powered by Hypothesis. Select any text on this page to annotate or highlight it.